08.06.2013 Views

ILLINOIS - The University of Illinois Board of Trustees

ILLINOIS - The University of Illinois Board of Trustees

ILLINOIS - The University of Illinois Board of Trustees

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

19781<br />

7-8<br />

net<br />

778 433<br />

On motion <strong>of</strong><br />

UNIVERSITY OF <strong>ILLINOIS</strong><br />

Purchases:<br />

6/30 $1 385 000 General Motors Acceptance 7% percent<br />

notes due 7/7/78., ........... 7.50 $1 385 000 00<br />

7/7 1 385 000 Ford Motor Credit 7% percent notes<br />

due 7/14/78 .................... 7.50 1 385 000 00<br />

7/14 894 000 Hertz demand notes.. ............ 8.05 894 000 00<br />

7/14 100 000 US. Treasury biIls due 6/26/79. ... 8.46 92 462 39<br />

7/17 200 000 Federal National Mortgage Association<br />

8.70 percent debentures due<br />

10/10/80 ....................... 8.71 199 937 50<br />

7/17 200 000 Federal National Mortgage Association<br />

8% percent debentures due<br />

4/1/83 ......................... 8.76 199 937 50<br />

7/20 1 000 000 Continental Bank 7.90 percent time<br />

deposit due 9/18,/78 .............. 7.90 1 000 000 00<br />

7/20 1 000 000 Continental Bank 8.30 percent time<br />

deDosit due 12/18/78.. ........... 8.30 1 000 000 00<br />

7/20 150 000 U.5:Treasury bills due 8/22/78.. .. 6.74 149 078 75<br />

7/21 300 000 Federal Land Banks 8.70 percent<br />

bonds due 7/20/82 ............... 8.71 299 906 25<br />

7/25 350 000 US. Treasury bills due 1/18/79.. .. 7.59 337 403 50<br />

7/25 175 000 U.S. Treasury bills due 2/6/79.. ... 7.71 167 949 44<br />

7/26 4 000 Hertz demand notes. ............. 8.05 4 000 00<br />

8J4 1 280 000 Continental Bank 8.05 percent time<br />

deposit due 1/2/79. .............. 8.05 1 280 000 00<br />

8/8 1 000 000 LaSalle National Bank 8.30 percent<br />

certificate <strong>of</strong> deoosit due 11/6/78.. . 8.25 1 000 122 47<br />

8,/9 100 000 U.S. Treasury dills due 9Jl9/”78.. .. 6.55 99 259 72<br />

8/9 100 000 U.S. Treasury bills due 10/19/78.. . 6.74 98 688 47<br />

8/9 100 000 U.S. Treasurv biIls due 11/24/78.. . 6.89 97 993 75<br />

819 200 000 U.S. Treasuk bills due ljl8/”79.. .. 7.22 193 709 00<br />

8J9 130 000 U.S. Treasur; bills due 5)29/79.. .. 7.93 122 117 49<br />

8/18 645 000 U.S. Treasury bills due 9/21/78. ... 6.93 640 857 67<br />

8/22 250 000 US. Treasurv bills due 8/21/79.. .. 8.46 230 308 61<br />

8/24 2 000 000 Continental Bank 8 percent time deposit<br />

due 10/23,/78. .............. 8.00 2 000 000 00<br />

8/25 600 000 Federal National Mortgage notes due<br />

3/23/79 ........................ 7.85 572 525 00<br />

8/25 1 500 000 U.S. Treasury bills due 9/21/78.. .. 6.53 1 492 687 50<br />

8/28 2 000 000 Continental Bank 8.15 percent time<br />

deposit due 11,/30/78.. ........... 8.15 2 000 000 00<br />

8/28 2 000 000 Harris Trust and Savings Bank 8<br />

percent certificate <strong>of</strong> deposit due<br />

10/31/78 ....................... 8.00 2 000 000 00<br />

8/28 200 000 Morton Communitv Bank 8% oercent<br />

certificate <strong>of</strong> deposit due 2/21‘/79.. . 8 50 200 000 00<br />

8/28 500 000 U.S. Treasury bills due 9/19/78.. .. 6.23 497 983 33<br />

8/29 900 000 First National Bank in Chamuaien<br />

8.36 percent certificate <strong>of</strong> deposit die<br />

11/22/78 ....................... 8.36 900 000 00<br />

First National Bank <strong>of</strong> Chicago 5<br />

percent open-end time deposit.. .... 5.00 778 432 56<br />

Mr. Livingston, this report was approved as presented.<br />

Contract for Repairs to Gymnasium Floor in the Physical<br />

Education Building, Chicago Circle<br />

(37) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate adminis-<br />

trative <strong>of</strong>ficers, recommends award <strong>of</strong> a contract in the amount <strong>of</strong> $44,325 to Dono-<br />

van Equipment, Inc., Chicago, the low base bidder, for repairs to the gymnasium<br />

floor in the physical education building at the Chicago Circle campus.<br />

75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!