19781 UNIVERSITY OF ILLINOIS 63 On motion of Mr. Watson, these recommendations were approved by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none; absent, Governor Thompson. Modification of the Claims Management Process, Risk Management Program (23) In the light of recent experience, the Risk Management Policy Committee has recommended modifications in the risk management procedures in order to review claims and make payments in a more timely way. Currently, the guidelines approved by the Board of Trustees require the review of all claims by appropriate subcommittees; these are bodies advisory to the vice president for administration which have a review responsibility but do not have the authority to act on behalf of the University. At present there are daily obliga- tions to make payments under the Workmen’s Compensation Act and to settle promptly liability claims. In the view of the policy committee, this administrative function will be facili- tated by the following revisions in the present procedure: the authorization of the vice president for administration to make payments of $1,500 or less in settlement of public or professional liability claims without prior review of a claims committee, and to make the following payments under the Workmen’s Compensation Act without prior review of the Workmen’s Compensation subcommittee: (1) six weeks or less of temporary total disability, (2) $3,000 or less of medical expenses and, (3) $1,500 or less for permanent partial disability. Payments in excess of the amounts listed wil be subject to prior review of the appropriate subcommittee. Any payment in excess of $5,000 will be subject to further review by the Risk Management Policy Committee, and any payment in ‘xcess of $10,000 will be subject to approval of the Board of Trustees. The vice president for administration concurs in these recommendations. I recommend approval. On motion of Mr. Livingston, these recommendations were approved. Increase in the Construction Contract for Parking Structure Number Two, Chicago Circle (24) On October 19, 1977, the Board of Trustees authorized the award of’a con- tract for general work for the construction of Parking Structure Number Two at the Chicago Circle campus to Walsh Brothers, Inc., Chicago. During the excavation, subsurface concrete foundations, slabs, and footings were discovered which necessitate additional work by the contractor. The contract provides that additional work of this nature may be authorized on a unit cost basis. The subsurface excavation has now been completed, and the additional cost to the contractor has been established at $54,904.66. Accordingly, the president of the University, with the concurrence of appropriate administrative officers, recom- mends that the contract with Walsh Brothers, Inc., be increased in the amount of $54,904.66. Funds are available from the proceeds of Chicago Circle Union Revenue Bonds, Series 1977. The student advisory vote was: Aye, Miss Kooper, Mr. Sobotka, Mr. Watson; no, none. On motion of Mr. Lenz, this recommendation was approved by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz,
64 BOARD OF TRUSTEES [September 20 Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none; absent, Governor Thompson. Contract for Repair of Steam and Condensate lines, Medical Center (25) The president of the University, with the concurrence of appropriate adminis- trative officers, recommends award of a contract in the amount of $59,484.12 to W. H. Lyman Construction Co., Palatine, Illinois, the low bidder, for the repair of the underground steam and condensate lines under @den Avenue at Polk Street at the Medical Center campus. The contractor must provide the necessary labor, materials, and equipment to excavate the area; replace the steam and condensate lines under Ogdcn Awnue: replace all piping, valves. and insulation; and replace streets and sidewalks as required. It is estimated that this work will begin in October 1978 and he rom- pleted by the end of November 1978. Funds are available in the operating lmdget for the Physical Plant at thc campus. A schedule of the bids received for this projrct has been filed with the secretary of the board. The student advisory vote was: Aye, Miss Kooper, Mr. Sobotka, Mr. Watson; no, none. On motion of Mr. Neal, this contract was awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Living- ston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none; absent, Governor Thompson. Contract for Ventilation Work, FY 1979, Urbana (26) The president of the University, with the concurrence of appropriate adminis- trative officers, recommends the award of a cost-plus contract to the low bidder as follows: to R. H. Bishop Company, Champaign, for ventilation work for repairs. minor remodeling, and new construction at the Urbana-Champaign campus from July 1, 1978, through June 30, 1979, with an option by the University to extend the contract for one year upon the same terms and conditions. The contract will be for ventilation and distribution systems for conditioned air on projects where the total cost is less than $25,000. The contractor hid on percentages to be added to estimated costs of material, labor, and subcontractors which may be furnished. The work will be done as ordered by the Operation and Maintenance Division and will be paid for on the basis of the actual cost of each job plus the contractor's fees as noted below: Percentage of Cost Maferial Labor Subcontract Total Estimated Fee Payment 20 41 10 $22 900 Funds as required will be covered by a contract work order which will be charged against funds allocated for each such project. A schedule of the bids received for this project has been filed with the secre- tary of the board. The student advisory vote was: Aye, Miss Kooper, Mr. Sobotka, Mr. Watson; no, none. On motion of Mrs. Rader, this contract was awarded by the follow- ing vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no: none; absent, Governor Thompson.
- Page 23 and 24: 12 BOARD OF TRUSTEES W Y 19 The num
- Page 25 and 26: 14 BOARD OF TRUSTEES Duly 19 The rh
- Page 27 and 28: 16 BOARD OF TRUSTEES Duly 19 Rockfo
- Page 29 and 30: 18 BOARD OF TRUSTEES Duly 19 6. AIL
- Page 31 and 32: 20 BOARD OF TRUSTEES Wuly 19 Compan
- Page 33 and 34: 22 BOARD OF TRUSTEES Uuly 19 that t
- Page 35 and 36: 24 BOARD OF TRUSTEES Duly 19 manner
- Page 37 and 38: 26 BOARD OF TRUSTEES Duly 19 who do
- Page 39 and 40: 28 BOARD OF TRUSTEES New Contracts
- Page 41 and 42: 30 BOARD OF TRUSTEES Report of Inve
- Page 43 and 44: 32 BOARD OF TRUSTEES w* 19 SECRETAR
- Page 45 and 46: 39 BOARD OF TRUSTEES litigation Ini
- Page 47 and 48: 36 BOARD OF TRUSTEES [September 20
- Page 49 and 50: 38 BOARD OF TRUSTEES [September 20
- Page 51 and 52: 40 BOARD OF TRUSTEES [September 20
- Page 53 and 54: 42 BOARD OF TRUSTEES [September 20
- Page 55 and 56: 44 BOARD OF TRUSTEES [September 20
- Page 57 and 58: 46 BOARD OF TRUSTEES [September 20
- Page 59 and 60: 48 BOARD OF TRUSTEES [September 20
- Page 61 and 62: 50 BOARD OF TRUSTEES [September 20
- Page 63 and 64: 52 BOARD OF TRUSTEES [September 20
- Page 65 and 66: 54 BOARD OF TRUSTEES [September 20
- Page 67 and 68: 56 BOARD OF TRUSTEES [September 20
- Page 69 and 70: 58 BOARD OF TRUSTEES [September 20
- Page 71 and 72: 60 BOARD OF TRUSTEES [September 20
- Page 73: 62 BOARD OF TRUSTEES [September 20
- Page 77 and 78: 66 BOARD OF TRUSTEES [September 20
- Page 79 and 80: 68 BOARDOFTRUSTEES [September 20 eg
- Page 81 and 82: 70 BOARD OF TRUSTEES [September 20
- Page 83 and 84: 72 BOARD OF TRUSTEE5 [September 20
- Page 85 and 86: 74 BOARD OF TRUSTEES [September 20
- Page 87 and 88: 76 BOARD OF TRUSTEES [September 20
- Page 89 and 90: 78 BOARD OF TRUSTEES [September 20
- Page 91 and 92: 80 BOARDOFTRUSTEES [September 20 ge
- Page 93 and 94: 82 BOARD OF TRUSTEES [September 20
- Page 95 and 96: 84 BOARD OF TRUSTEES and for other
- Page 97 and 98: 86 BOARD OF TRUSTEES [October 3 The
- Page 99 and 100: 88 BOARD OF TRUSTEES [October 3 tha
- Page 101 and 102: :90 B O m OF TRUSTEES search is in
- Page 103 and 104: 92 BOARD OF TRUSTEES [October 20 BU
- Page 105 and 106: 94 BOARD OF TRUSTEES [October 20 2.
- Page 107 and 108: 96 BOARD OF TRUSTEES [October 20 T
- Page 109 and 110: 98 BOARDOFTRUSTEES [October 20 39.
- Page 111 and 112: 100 BOARD OF TRUSTEES [October 20 a
- Page 113 and 114: 102 BOARD OF TRUSTEES [October 20 T
- Page 115 and 116: 104 BOARD OF TRUSTEES [October 20 f
- Page 117 and 118: 106 BOARD OF TRUSTEES [October 20 L
- Page 119 and 120: 108 BOARD OF TRUSTEES [October 20 1
- Page 121 and 122: 110 BOARD OF TRUSTEES [October 20 a
- Page 123 and 124: 112 BOARD OF TRUSTEES [October 20 T
64 BOARD OF TRUSTEES [September 20<br />
Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez;<br />
no, none; absent, Governor Thompson.<br />
Contract for Repair <strong>of</strong> Steam and Condensate lines, Medical Center<br />
(25) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate adminis-<br />
trative <strong>of</strong>ficers, recommends award <strong>of</strong> a contract in the amount <strong>of</strong> $59,484.12 to<br />
W. H. Lyman Construction Co., Palatine, <strong>Illinois</strong>, the low bidder, for the repair<br />
<strong>of</strong> the underground steam and condensate lines under @den Avenue at Polk Street<br />
at the Medical Center campus.<br />
<strong>The</strong> contractor must provide the necessary labor, materials, and equipment to<br />
excavate the area; replace the steam and condensate lines under Ogdcn Awnue:<br />
replace all piping, valves. and insulation; and replace streets and sidewalks as<br />
required. It is estimated that this work will begin in October 1978 and he rom-<br />
pleted by the end <strong>of</strong> November 1978.<br />
Funds are available in the operating lmdget for the Physical Plant at thc<br />
campus.<br />
A schedule <strong>of</strong> the bids received for this projrct has been filed with the secretary<br />
<strong>of</strong> the board.<br />
<strong>The</strong> student advisory vote was: Aye, Miss Kooper, Mr. Sobotka, Mr.<br />
Watson; no, none.<br />
On motion <strong>of</strong> Mr. Neal, this contract was awarded by the following<br />
vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Living-<br />
ston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none;<br />
absent, Governor Thompson.<br />
Contract for Ventilation Work, FY 1979, Urbana<br />
(26) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate adminis-<br />
trative <strong>of</strong>ficers, recommends the award <strong>of</strong> a cost-plus contract to the low bidder as<br />
follows: to R. H. Bishop Company, Champaign, for ventilation work for repairs.<br />
minor remodeling, and new construction at the Urbana-Champaign campus from<br />
July 1, 1978, through June 30, 1979, with an option by the <strong>University</strong> to extend<br />
the contract for one year upon the same terms and conditions. <strong>The</strong> contract will<br />
be for ventilation and distribution systems for conditioned air on projects where<br />
the total cost is less than $25,000. <strong>The</strong> contractor hid on percentages to be added<br />
to estimated costs <strong>of</strong> material, labor, and subcontractors which may be furnished.<br />
<strong>The</strong> work will be done as ordered by the Operation and Maintenance Division and<br />
will be paid for on the basis <strong>of</strong> the actual cost <strong>of</strong> each job plus the contractor's fees<br />
as noted below:<br />
Percentage <strong>of</strong> Cost<br />
Maferial Labor Subcontract Total Estimated Fee Payment<br />
20 41 10 $22 900<br />
Funds as required will be covered by a contract work order which will be<br />
charged against funds allocated for each such project.<br />
A schedule <strong>of</strong> the bids received for this project has been filed with the secre-<br />
tary <strong>of</strong> the board.<br />
<strong>The</strong> student advisory vote was: Aye, Miss Kooper, Mr. Sobotka, Mr.<br />
Watson; no, none.<br />
On motion <strong>of</strong> Mrs. Rader, this contract was awarded by the follow-<br />
ing vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr.<br />
Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no:<br />
none; absent, Governor Thompson.