08.06.2013 Views

ILLINOIS - The University of Illinois Board of Trustees

ILLINOIS - The University of Illinois Board of Trustees

ILLINOIS - The University of Illinois Board of Trustees

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNIVERSITY OF <strong>ILLINOIS</strong> 683<br />

Computer system, cont’d<br />

Construction work cont’d<br />

ownership, copyright, and royalty policies<br />

rejection bf bids, 275<br />

by <strong>University</strong>, 104<br />

s<strong>of</strong>tball field 275<br />

Programmable Processor Terminal (PPY)<br />

rejection 6f bids 275<br />

licensing rights transferred to Foun: Lisle, Pharmacogndsy and Horticultural<br />

dation. 104<br />

Drug Station animal housing facility<br />

Computer system accessories procurement pol-<br />

replacement ’<strong>of</strong> air conditioning and<br />

icy, Education and hiormation Systemr,<br />

ventilation system, 189<br />

Inc. (EIS) 62<br />

Medical Center, Administrative Office<br />

Com uter ter&inal cable distribution system<br />

Building, terrace and walkway, rcpam,<br />

P~edica~ Center), contract, installation,<br />

621<br />

487<br />

anatomy laboratories remodeling 112<br />

Com uter terminal cables, contract, Medical Auxiliary Servicez duilding, redodeling,<br />

&enter, installation, 541<br />

112<br />

Computerized axial tomography scanner<br />

Campus Health Servies cable duct inchase,<br />

Hospital, <strong>University</strong> (Medicai 8$1<br />

stallation, constructidn work, geieral,<br />

ter). fundine. 535<br />

543<br />

Computerized axial tomography scanner ser-<br />

floor, installation,. 543<br />

vices contract Medical Center Hospital, Chicago Illini Union Addition Recrea-<br />

Univkty a’endment, 152, 247<br />

tion Facility 486<br />

Concrete repkrs, contract, Chicago Circle, chilled water facility. 407<br />

Union Building 156<br />

rejection <strong>of</strong> bids 407<br />

Concrete restoratioh work contracts, Urbana, College <strong>of</strong> Mediciie West Tower, biologi-<br />

Memorial Stadium. 256<br />

cal chemistry departmental <strong>of</strong>fice, remodifications<br />

fo; paraplegic seating, 250<br />

modeling, 312<br />

rejection <strong>of</strong> bids. 250<br />

Eye and Ear Infirmary Building, tomog-<br />

Concrete work, contracts. ChicaRo Circle. Pa-<br />

raphy x-ray unit, remodeling 19<br />

vilion 569<br />

General Hosoila!. Diagnostic Clin:c. renorej;ction<br />

<strong>of</strong> bids, 569<br />

vation ,$7 ’ -<br />

Con!eyence Center (Medical Center), See Med- Hospital, ’bniversity, Eye and Ear Inicine<br />

College <strong>of</strong> (Medical Center)<br />

firmary ophthalmology departmental<br />

Conibear: S. A,, appointment. 433<br />

<strong>of</strong>fice ;emodeling 313<br />

Connecticut, State <strong>of</strong>, contract, 320<br />

minor building alterations, repairs and<br />

change. 46i<br />

new construction, 654<br />

Connelly, G. F.. Co.. Inc. contract, 569<br />

parking facilities, Lot G 314<br />

Consent agenda, developmen;, 116<br />

parking lot E, security’ fence. rejection<br />

Construction Enxineering Research Laboratory<br />

<strong>of</strong> bids, 406<br />

See United States Army, Construction En: parking structure, change, 19<br />

gincering Research Laboratory<br />

replacement hospital parking structun,<br />

Construction laborers. litisation. suit concern-<br />

Fzestrian walkday, rejection <strong>of</strong> bid,<br />

ing pre\ailing rate <strong>of</strong> wages emploment<br />

121<br />

<strong>of</strong> special counsel, authorizatibn 201<br />

Single Student Residence 1W<br />

Construction management services: contract, Student Locker Room, rimodetin& 112<br />

Chirago Circle, Pavilion, 226<br />

Women’s Residence Hall remodeling, 587<br />

increase, 652<br />

Monticello. Allerton Paik. . improvement .<br />

Construction work general contracts Chicago<br />

projeci 439<br />

Formfit Building loading dock, ’suucturd Peona Sc&ool <strong>of</strong> Medicine, recreational<br />

re airs change, 661<br />

facilities. 588<br />

Feoria Street, yperty at 40a412 south, Urbana Beckwith Living Center, 589<br />

loading ock, structural repam,<br />

rejdction <strong>of</strong> bids, 589<br />

change. 661<br />

Dairy Farm dairy milking arlor, 190<br />

Chicago Circle, baseball field, 275<br />

dairy pa& holding area %oilding, 468<br />

relection pf bids, 275<br />

Illini Union, patio, repairs. 588<br />

Chicaqo Circle Center concourse. re- Illini Union Bookstore addition and R-<br />

volving doors, instailation, 176<br />

modeling, 276, 566’<br />

first floor enclosure 365<br />

McKinley Health Center. elevator instalrejrction<br />

<strong>of</strong> bids.’365<br />

lation 567<br />

withdrawal <strong>of</strong> bid, 365<br />

Police Triining Institute addition, 545<br />

Great Circle Hall, food facility and poultry housing unit, confinement buildlounge.<br />

176<br />

ing 415<br />

12KV switchgear. purchase and in- rabbit housing facility, confinement buildstallation<br />

310<br />

ing, 415<br />

Education and Cbmmunications Building, repairs, minor remodeling and new anexterior<br />

wall repain 311<br />

stmction. 274<br />

minor building alterati&s, repaia and<br />

extension, 655<br />

new construction, 654<br />

Consultative Committee to Assist in the Selec-<br />

Parking Structure No. 2, increase, 63 ti!n <strong>of</strong> a President. appreciation <strong>of</strong> ser-<br />

Pavilion, 569<br />

vices. 289<br />

caissons 313<br />

a propriation, anticipated expenses, 93<br />

comp_fr$ler’s authorization to award, cfiarqe. 89<br />

L13<br />

r$tablished, 88<br />

excavation and backfill, change, 661 expression <strong>of</strong> appreciation <strong>of</strong> services, RSOincrease.<br />

651<br />

lution, 295, 338<br />

Physical Education Building, basement members, appointments. 93<br />

<strong>of</strong>fices, 410<br />

members, list. 92<br />

running track. 275<br />

membership, change, 161<br />

rejection <strong>of</strong> bids. 275<br />

presentation to the <strong>Board</strong> concerning em-<br />

Science and Engineering South Buildin plo\ment <strong>of</strong> secretary, 140<br />

607. install exhaust fan pr&ure di? presentation to the <strong>Board</strong> concerning guideferential<br />

switches, 320<br />

lines lor auessing prospects, 139<br />

Building 619, replace and repair mois- presentation to the <strong>Board</strong> concerning selecture<br />

eliminators, 320<br />

tion <strong>of</strong> a new mesident, 289<br />

soccer field, 275<br />

report, 161, 203, 263, 285

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!