19801 UNIVERSITY OF <strong>ILLINOIS</strong> 543<br />

cable, conduit, electrical power, and other miscellaneous work, to provide a physi-<br />

ology monitoring system in the new <strong>University</strong> <strong>of</strong> <strong>Illinois</strong> Hospital at the Medical<br />

Center campus.<br />

Funds for this project are available from the Hospital Income Fund.<br />

(<strong>The</strong> following bids for this project were received on February 14, 1980:<br />

Mid-America Electric Go., Palatine $67 758<br />

Midwest Interstate Electrical Construction Co., Chicago $79 950<br />

Arlington Electrical Construction Co., Inc., Arlington Heights $86 450<br />

G & M Electrical Contractors Go., Chicago $88 000)<br />

On motion <strong>of</strong> Dr. Donoghue, the preceding items were approved by<br />

the foIlawing vote: Aye, Dr. Donughue, Mr. Forsyth, Mr. Hahn, Mr.<br />

Howard, Mr. Lenz, Mr. Neal, Mrs. Shepherd, Mr. Stone, Mr. Velasquez;<br />

no, none; absent, Governor Thompson. (Mr. Hahn asked to be recorded<br />

as not voting on item 25.)<br />

(<strong>The</strong> student advisory vote was: Aye, Mr. Grady, Mr. Sobotka; no,<br />

none; absent, Miss Wyncott.)<br />

Report <strong>of</strong> Purchases Approved by the Vice President<br />

for Administration<br />

(34) <strong>The</strong> vice president for administration also submitted a report <strong>of</strong> purchases<br />

approved by him on recommendation <strong>of</strong> the directors <strong>of</strong> purchases in amounts <strong>of</strong><br />

$12,500 to $15,000. A copy <strong>of</strong> this report is filed with the secretary.<br />

<strong>The</strong> Comptroller's Monthly Report <strong>of</strong> Contracts Executed<br />

(35) <strong>The</strong> comptroller's monthly report <strong>of</strong> contracts executed was presented.<br />

Chicago Circle<br />

Contract Change Order<br />

With Whom Purborc<br />

G & M Electrical Contractors Cost-plus contract - I&tall Series I corn uter<br />

co.<br />

cable in <strong>University</strong> Nnneh on Chicago &ie<br />

campus<br />

Amount lo €36<br />

Paid by th6<br />

Untuemsity<br />

$ 15 O&<br />

Total m<br />

Medical Center<br />

Contract Change Orders<br />

With Whom<br />

Wm. J. Scown Building Co.<br />

Purpors<br />

Cost-plus contract - Perf- general work to<br />

install raised floor and cable duct for electrical<br />

cables in room B-8, Campus Health<br />

Services<br />

Frank Staar & Sons, Inc. Cost- Ius contract - Perform ro<strong>of</strong> repairs on the<br />

Bioyogical Resources Laboratory<br />

Total<br />

Urbana-Champaign<br />

New Contracts<br />

With Whom purpose<br />

Boom County, <strong>Illinois</strong><br />

Perform a geologic study <strong>of</strong> Boone and Winnebago<br />

Counties<br />

Brookhaven National Laboratory<br />

BNL 496089-5<br />

Perform studia on the stabili <strong>of</strong> corn utational<br />

methods for thermoyhydrazc mode( used in<br />

reactor safety analysls<br />

Amount to Ba<br />

Paid by the<br />

Uniuem&ty<br />

$ 22 271<br />

21 522<br />

m<br />

Amount lo Be<br />

Paid to th#<br />

Uniucmnty<br />

$ 24 122<br />

7000