19791 UNIVERSITY OF <strong>ILLINOIS</strong> 48 7<br />

Contract for Installation <strong>of</strong> Computer Terminal Cable, Medical Center<br />

(13) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> the appropriate<br />

administrative dficers, recommends award <strong>of</strong> a contract for $121,238 to Fries<br />

Walters Co., Hillside, the low bidder, for the installation <strong>of</strong> a computer terminal<br />

cable distribution system from the Hospital Residence building to nine buildings<br />

at the Medical Center campus.<br />

<strong>The</strong> work is part <strong>of</strong> a project to establish a computerized system for patient<br />

admissions, billings, and medical records. <strong>The</strong> first phase, now under construction<br />

by the cost-plus contractor, is minor remodeling to prepare a room in the basement<br />

<strong>of</strong> the Hospital Residence building for use as a communication hub for data com-<br />

munications equipment.<br />

<strong>The</strong> current phase <strong>of</strong> the project is to install approximately 4,135 feet <strong>of</strong><br />

conduit and terminal trunk lines from the communication hub to secondary boards<br />

located within each separate building.<br />

Funds for the project are available in the Hospital Income Fund.<br />

A schedule <strong>of</strong> the bids received has been filed with the secretary <strong>of</strong> the board<br />

for record.<br />

Contracts for Renovation <strong>of</strong> Diagnostic Clinic, Medical Center<br />

(14) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> the appropriate<br />

administrative <strong>of</strong>ficers, recommends the award <strong>of</strong> the following contracts for re-<br />

modeling in the General Hospital building to renovate the Diagnostic Clinic. <strong>The</strong><br />

award in each case is to the low base bidder.<br />

General Work<br />

H. B. Barnard Co., Chicago.. ................................... $ 62 945<br />

Plumbing Work<br />

Ewing Plumbing, Inc., River Forest.. .............................<br />

13 700<br />

Ventilation Work<br />

Admiral Heating & Ventilating, Inc., Hillside.. .................... 5 255<br />

Electrical Work<br />

Midwest Interstate Electrical Construction Co., Chicago.. ............ 39 355<br />

$m<br />

A schedule <strong>of</strong> the bids received has been filed with the secretary <strong>of</strong> the board<br />

for record.<br />

Funds for this project are available in the Hospital Income Fund.<br />

On motion <strong>of</strong> Mr. Howard, these items were approved by the following<br />

vote: Aye, Mr. Forsyth, Mr. Howard, Mr. Lenz, Mr. Neal, Mrs.<br />

Shepherd, Mr. Stone, Mr. Velasquez; no, none; absent, Dr. Donoghue,<br />

Mr. Hahn, Governor Thompson.<br />

(<strong>The</strong> student advisory vote was: Aye, Mr. Grady, Mr. Sobotka; no,<br />

none; absent, Miss Wyncott.)<br />

On motion <strong>of</strong> Mr. Neal, the board again agreed that one roll call vote<br />

would be taken and considered the roll call vote on each <strong>of</strong> the next two<br />

items.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!