08.06.2013 Views

ILLINOIS - The University of Illinois Board of Trustees

ILLINOIS - The University of Illinois Board of Trustees

ILLINOIS - The University of Illinois Board of Trustees

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

464 BOARDOFTRUSTEES [November 15<br />

Medical Center<br />

FY 1980<br />

Project<br />

Project Budget Pr<strong>of</strong>essional Fkm Recommended<br />

Space Realignment, Renewal, and Replacement - Remodeling<br />

First Floor Orthopedics<br />

$ 175 000 ODonnell Wicklund Pigozzi<br />

Hospital Billing<br />

224 000 Architects, Inc., Northbrook<br />

Occupational Safety and Health 100 000<br />

Act and Code Corrections<br />

Anatomy Laboratory<br />

Provisions for Handicapped<br />

Ro<strong>of</strong> Repairs and Exterior Masonry<br />

Building Equipment Automation<br />

Electrical Upgrade System<br />

I<br />

Dolio and Metz Ltd., Chicago<br />

196 000<br />

43 000 <strong>University</strong> <strong>of</strong> <strong>Illinois</strong> will pro-<br />

66 600 vide the pr<strong>of</strong>essional services required.<br />

CDB will receive bids<br />

90 000 and award construction con-<br />

200 000 tracts.<br />

Urbana-Champaign<br />

l-<br />

I<br />

Space Realignment, Renewd, and Replacement - Remodeling<br />

Animal Room Improvements $ 225 000<br />

Morrill Hall Remodeling<br />

Noyes Laboratory<br />

Environmental Research Laboratory 96 600<br />

Krannert Center for the Perform-<br />

ing Arts<br />

Elevator Installations<br />

Elevator Replacement<br />

Paraplegic Ramp Improvements<br />

Energy Conservation Ventilation<br />

Turndown<br />

Temperature Control Remodeling<br />

and Replacement<br />

Foreign Languages Improvements<br />

Food for Century 111<br />

Veterinary Medicine Research<br />

Building<br />

Meat Science Laboratory - Phase<br />

I1<br />

Swine Research Center<br />

351 *O0<br />

SRGF Inc., Architects, Cham-<br />

Richardson, Severns, Greene,<br />

Rishling & Associates, Cham-<br />

paign<br />

1<br />

650 400<br />

95 ooo Sarti-Huff Architectural Group,<br />

Inc., Springfield<br />

80 000<br />

107 400 \ I<br />

170 000<br />

909 000<br />

1 026 000<br />

1 742 400<br />

Ralph Henneman & Associates,<br />

Inc., Champaign<br />

Isaksen & Mztzdorff Architects,<br />

Urbana<br />

Clark Dietz Engineers, Inc., Ur-<br />

bana<br />

Phillips Swager Associates, Peoria<br />

Funds for employment <strong>of</strong> the pr<strong>of</strong>essional firms have been appropriated to<br />

the Capital Development <strong>Board</strong> for FY 1980.<br />

Purchases<br />

(19) <strong>The</strong> president submitted, with his concurrence, a list <strong>of</strong> purchases recommended<br />

by the directors <strong>of</strong> purchases and the vice president for administration.<br />

<strong>The</strong> list <strong>of</strong> purchases was presented in two categories: purchases from ap<br />

propriated funds (i.e., from state appropriations to the <strong>University</strong>) and purchases<br />

from institutional funds. <strong>The</strong> latter term designates funds received by the <strong>University</strong><br />

under contracts with the United States government, private corporations, and<br />

other organizations; grants from foundations, corporations, and other donors; and<br />

<strong>University</strong> revolving funds authorized by law.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!