314 BOARD OF TRUSTEES Dune 20<br />

Funds are available from the proceeds <strong>of</strong> the sale <strong>of</strong> <strong>University</strong> <strong>of</strong> <strong>Illinois</strong><br />

Auxiliary Facilities System Revenue Bonds, Series N.<br />

A schedule <strong>of</strong> the bids received has been filed with the secretary for<br />

record.<br />

<strong>The</strong> low bid is within the budget estimate and was reviewed and recom-<br />

mended for award by the construction manager and the architect/engineer for<br />

the project. <strong>The</strong> procedure for the award <strong>of</strong> a construction contract and the prc-<br />

posed schedule for the award <strong>of</strong> bids was reviewed with the Buildings and Grounds<br />

Committee on May 15, 1979.<br />

Contracts for Renovation <strong>of</strong> Parking lot “G,” Medical Center<br />

(39) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> the appropriate<br />

administrative <strong>of</strong>ficers, recommends award <strong>of</strong> the following contracts for renovation<br />

<strong>of</strong> parking lot “G” at the Medical Center campus, the award in each case<br />

being to the low bidder, on its base bid plus the indicated additive alternatives:<br />

Bare Bid<br />

Add. Alt.<br />

#I<br />

Add. Alt.<br />

$2 Total<br />

General Work<br />

Peter J. O’Brien & Co,,<br />

Chicago.. ............. $62 068<br />

Plumbing Work<br />

$3 400 54 100 $ 69 568<br />

Delta Piping Company,<br />

South Holland ......... 18 000<br />

Electrical Work<br />

Midwest Interstate Electrical<br />

N/A N/A 18 000<br />

Construction Co.,<br />

Chicago.. ............. 26 746 NJA 310 27 056<br />

Total $114 624<br />

Funds for this project, totaling $150,100, are available in the Auxiliary<br />

Facility System Repair and Replacement Reserve Account.<br />

A schedule <strong>of</strong> the bids received has been filed with the secretary <strong>of</strong><br />

the board for record.<br />

Employment <strong>of</strong> Architect and Engineer for Remodeling Work<br />

During FY 1980, Chicago Campuses<br />

(40) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate ad-<br />

ministrative <strong>of</strong>ficers, recommends the employment <strong>of</strong> O’Donnell, Wicklund, Pigozzi<br />

Architects, Inc., Northbmk, for architectural services, and R. T. Williams & Asso-<br />

ciates, Westmont, for engineering services, for miscellaneous remodeling and<br />

rehabilitation and alteration work at the Medical Center and Chicago Circle<br />

campuses.<br />

<strong>The</strong> authorization would be for the period July 1, 1979, through June 30,<br />

1980, and payment for the services provided will be from funds budgeted for<br />

each project authorized by the <strong>University</strong> and assigned to the firms. <strong>The</strong> fees<br />

for both firms will be based on the actual salaries and wages <strong>of</strong> pr<strong>of</strong>essional and<br />

technical staff, plus 150 percent. <strong>The</strong> total cost, including reimbursements autho-<br />

rized by the <strong>University</strong>, is estimated not to exceed $100,000 to each firm for<br />

FY 1980.<br />

Funds are made available for remodeling, rehabilitation, and alteration <strong>of</strong><br />

existing buildings during the fiscal year to meet the needs <strong>of</strong> the campuses.<br />

Projects would be assigned to the firms by the <strong>University</strong> as pr<strong>of</strong>essional services<br />

are required to satisfy campus programs and schedules, <strong>The</strong> cost <strong>of</strong> the projects<br />

anticipated for the fiscal year is estimated to be $1,500,000.