ILLINOIS - The University of Illinois Board of Trustees
ILLINOIS - The University of Illinois Board of Trustees ILLINOIS - The University of Illinois Board of Trustees
312 BOARD OF TRUSTEES Wune 20 of funds, for $131,995 to Sylvania Lighting Services Corp., Elk Grove Village, the low bidder, on its base bid for minor repairs, relamping, and cleaning of lighting fixtures in selected buildings during FY 1980 at the Chicago Circle and Medical Center campuses. Funds have been included in the appropriation bill of the General Assembly to meet the ordinary and contingent expenses of the University for FY 1980. The funds will be included in the Physical Plant Department operating budget authorization request for the Chicago campuses for FY 1980 to be submitted to the Board of Trustees. A schedule of the bids received has been filed with the secretary for record. (The work consists of replacing and washing fluorescent and incandescent lamps at various buildings throughout the two campuses. In addition, the contractor’s base bid includes a specified number of hours per week for service calls and of ballast and socket replacements. All lamps, ballasts, and sockets will be supplied by the University. (This project is a continuation of the lighting fixtures maintenance program started in 1971 which has resulted in substantial savings to the University. During the period of the contract, it is planned to completely relamp and wash fixtures in twenty-four buildings at the Chicago campuses and provide manpower on a daily basis to cover daily calls.) Contract for Snow Removal and Other Work, Chicago Campuses (35) The president of the University, with the concurrence of appropriate ad- ministrative officers, recommends award of a unit price contract, subject to the availability of funds, to Ryan Bros., Inc., Chicago, the low bidder, for furnishing the necessary materials and equipment (with operators) for snow removal and minor landscape and site work at the Chicago Circle and Medical Center cam- puses. The contract is for the period July 1, 1979, through June 30, 1980. The contractor will be compensated for furnishing each item of equipment, with operator, at the rate specified, and material will be supplied at the unit ratr specified in the proposal. Based on anticipated utilization, the estimated cost is $50,800. Funds have been included in the appropriation bill of the General Assembly to meet the ordinary and contingent expenses of the University for FY 1980 and will be included in the Physical Plant Department operating budget authorization request for the Chicago campuses for FY 1980 to be submitted to the Board of Trustees. A schedule of the bids received has been filed with the secretary for record. (The low bidder, Ryan Bros., Inc., currently holds the contract for this work for the University for FY 1979, and its performance has been satisfactory. (This contract is to provide a source of additional equipment and labor to the ground maintenance forces at the Chicago campuses for snow removal, land- scape, and site work which is done at irregular intervals by the University. Under the contract, specified amounts of topsoil and crushed stone can be acquired to expedite completion of projects. The contractor will perform work under this contract for projects assigned by work orders issued by the Physical Plant Depart- ment on the basis of unit prices for equipment hours and/or material used.) Contracts for Remodeling, Biological Chemistry Department, College of Medicine West Tower, Medical Center (36) The president of the University, with the concurrence of appropriate ad- ministrative officers, recommends award of the following contracts for remodeling
19793 UNIVERSITY OF ILLINOIS 313 in the College of Medicine West Tower, Medical Center campus. The award in each case is to the low base bidder. The work wil provide a suite of offices for the biological chemistry departmental office, including new ventilation, lighting, and air conditioning systems. General Mutual Contracting Co., Chicago. ................................ $19 111 Heating and Air Conditioning Narowetz Go., Melrose Park.. .................................... 21 750 Electrical Midwest Interstate Electrical Construction Co., Chicago. ............. 4 299 Total ..................................................... $45 160 Funds are available in the FY 1979 institutional funds budget of the College of Medicine at the Medical Center campus. A schedule of the bids received has been filed with the secretary for record. Contracts for Remodeling, and Rejection of Bid, Ophthalmology Department, Eye and Ear Infirmary, Medical Center (37) The president of the University, with the concurrence of appropriate admin- istrative afficers, recommends award of the following contracts for remodeling Room B-29 in the University of Illinois Hospital Eye and Ear Infirmary Building. The award in each case is to the low base bidder. The work will provide a suite of offices for the Ophthalmology Department, including new plumbing and lighting, and will make modifications in the heating and air conditioning systems. General Work H. B. Barnard Co., Chicago.. .................................... $25 160 Plumbing Work Peter H. Smith Co., Chicago.. ................................... 2 925 Electrical Work Midwest Interstate Electrical Construction Co., Chicago. ............. 4 888 Total ..................................................... $32 973 A single bid of $11,250 for ventilation work was received from the Narowetz Co., Melrose Park, which exceeded the budget by a significant sum. Therefore, the Physical Plant Department recommended that the bid be rejected. That part of the project will be accomplished with University tradesmen. Pursuant to the provisions of Article 11, Section 4(k) (3), of the General Rules Concerning Uni- versity Organization and Procedure, the bid was rejected and the president now reports its rejection. Funds are available in the FY 1979 institutional funds budget of the College of Medicine at the Medical Center campus. A schedule of the bids received has been filed with the secretary for record. Contract for Construction of the Pavilion, Chicago Circle (38) The president of the University, with the concurrence of appropriate administrative officers, recommends award of a contract to Case International Company, Roselle, the low bidder, for $204,400 for the construction of caissons for the Pavilion at the Chicago Circle campus.
- Page 273 and 274: 262 BOARD OF TRUSTEES [April 20 hee
- Page 275 and 276: This Page Intentionally Left Blank
- Page 277 and 278: 266 BOARD OF TRUSTEES [May 16 PRESE
- Page 279 and 280: 268 BOARD OF TRUSTEES [May 16 Appoi
- Page 281 and 282: 270 BOARD OF TRUSTEES [May 16 Insti
- Page 283 and 284: 272 BOARD OF TRUSTEES [May 16 This
- Page 285 and 286: 2 74 BOARD OF TRUSTEES [May 16 Cont
- Page 287 and 288: 276 BOARD OF TRUSTEES [May 16 Contr
- Page 289 and 290: 278 BOARD OF TRUSTEES [May 16 tion,
- Page 291 and 292: 280 BOARD OF TRUSTEES [May 16 With
- Page 293 and 294: 282 BOARD OF TRUSTEES [May 16 lease
- Page 295 and 296: 284 BOARD OF TRUSTEES [May 16 ANNOU
- Page 297 and 298: This Page Intentionally Left Blank
- Page 299 and 300: 288 BOARD OF TRUSTEES Dune6 Preside
- Page 301 and 302: 290 BOARD OF TRUSTEES Dune 6 mation
- Page 303 and 304: 292 BOARDOFTRUSTEES hundreds of emi
- Page 305 and 306: MEETING OF THE BOARD OF TRUSTEES OF
- Page 307 and 308: 19791 UNmRSITY OF ILLINOIS 295 deci
- Page 309 and 310: 19791 UNIVERSITY OF ILLINOIS 297 de
- Page 311 and 312: 19791 UNIVERSITY OF ILLINOIS 299 an
- Page 313 and 314: 19791 UNIVERSITY OF ILLINOIS 30 1 T
- Page 315 and 316: 19791 UNIVERSITY OF ILLINOIS 303 of
- Page 317 and 318: 19791 UNIVERSITY OF ILLINOIS 305 ex
- Page 319 and 320: 19791 UNIVERSITY OF ILLINOIS 307 op
- Page 321 and 322: 19791 UNIVERSITY OF ILLINOIS 309 th
- Page 323: 19791 UNIVERSITY OF ILLINOIS 311 A
- Page 327 and 328: 19791 UNIVERSITY OF ILLINOIS 315 Fu
- Page 329 and 330: 19791 UNIVERSITY OF ILLINOIS 317 Co
- Page 331 and 332: 19791 UNIVERSITY OF ILLINOIS 319 ot
- Page 333 and 334: United States Department of Trans r
- Page 335 and 336: 19791 UNIVERSW OF ILLINOIS 323 5/16
- Page 337 and 338: 19791 UNIVERSITY OF ILLINOIS 325 in
- Page 339 and 340: 19793 UNIVERSITY OF XLLINOIS 327 DE
- Page 341 and 342: 19791 UNIVERSITY OF ILLINOIS Colleg
- Page 343 and 344: 19791 UNIVERSITY OF ILLINOIS Colleg
- Page 345 and 346: 19791 UNIVERSITY OF ILLINOIS 333 Dr
- Page 347 and 348: MEETING OF THE BOARD OF TRUSTEES OF
- Page 349 and 350: 19791 UNJYERSITY OF ILLINOIS 337 go
- Page 351 and 352: 19791 UNIVERSITY OF ILLINOIS 339 St
- Page 353 and 354: 19791 UNIVERSITY OF ILLINOIS 341 Th
- Page 355 and 356: 19791 UNIVERSITY OF ILLINOIS 343 Y
- Page 357 and 358: 19791 UNIVERSITY OF ILLINOIS 345 Ap
- Page 359 and 360: 19791 UNIVERSITY OF ILLINOIS 347 fi
- Page 361 and 362: 19791 UNIVERSITY OF ILLINOIS 349 Mo
- Page 363 and 364: 19791 UNIVERSITY OF ILLINOIS 35 1 S
- Page 365 and 366: 19791 UNIVERSITY OF ILLINOIS 353 Re
- Page 367 and 368: 19791 UNIVERSITY OF ILLINOIS 355 2.
- Page 369 and 370: 19791 UNIVERSITY OF ILLINOIS 357 co
- Page 371 and 372: 19791 UNIVERSITY OF ILLINOIS 359 19
- Page 373 and 374: 19791 UNIVERSITY OF ILLINOIS 36 1 2
312 BOARD OF TRUSTEES Wune 20<br />
<strong>of</strong> funds, for $131,995 to Sylvania Lighting Services Corp., Elk Grove Village,<br />
the low bidder, on its base bid for minor repairs, relamping, and cleaning <strong>of</strong><br />
lighting fixtures in selected buildings during FY 1980 at the Chicago Circle and<br />
Medical Center campuses.<br />
Funds have been included in the appropriation bill <strong>of</strong> the General Assembly<br />
to meet the ordinary and contingent expenses <strong>of</strong> the <strong>University</strong> for FY 1980.<br />
<strong>The</strong> funds will be included in the Physical Plant Department operating budget<br />
authorization request for the Chicago campuses for FY 1980 to be submitted to<br />
the <strong>Board</strong> <strong>of</strong> <strong>Trustees</strong>.<br />
A schedule <strong>of</strong> the bids received has been filed with the secretary for<br />
record.<br />
(<strong>The</strong> work consists <strong>of</strong> replacing and washing fluorescent and incandescent<br />
lamps at various buildings throughout the two campuses. In addition, the contractor’s<br />
base bid includes a specified number <strong>of</strong> hours per week for service calls<br />
and <strong>of</strong> ballast and socket replacements. All lamps, ballasts, and sockets will be<br />
supplied by the <strong>University</strong>.<br />
(This project is a continuation <strong>of</strong> the lighting fixtures maintenance program<br />
started in 1971 which has resulted in substantial savings to the <strong>University</strong>. During<br />
the period <strong>of</strong> the contract, it is planned to completely relamp and wash fixtures<br />
in twenty-four buildings at the Chicago campuses and provide manpower on a<br />
daily basis to cover daily calls.)<br />
Contract for Snow Removal and Other Work, Chicago Campuses<br />
(35) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate ad-<br />
ministrative <strong>of</strong>ficers, recommends award <strong>of</strong> a unit price contract, subject to the<br />
availability <strong>of</strong> funds, to Ryan Bros., Inc., Chicago, the low bidder, for furnishing<br />
the necessary materials and equipment (with operators) for snow removal and<br />
minor landscape and site work at the Chicago Circle and Medical Center cam-<br />
puses. <strong>The</strong> contract is for the period July 1, 1979, through June 30, 1980. <strong>The</strong><br />
contractor will be compensated for furnishing each item <strong>of</strong> equipment, with<br />
operator, at the rate specified, and material will be supplied at the unit ratr<br />
specified in the proposal. Based on anticipated utilization, the estimated cost is<br />
$50,800.<br />
Funds have been included in the appropriation bill <strong>of</strong> the General Assembly<br />
to meet the ordinary and contingent expenses <strong>of</strong> the <strong>University</strong> for FY 1980 and<br />
will be included in the Physical Plant Department operating budget authorization<br />
request for the Chicago campuses for FY 1980 to be submitted to the <strong>Board</strong> <strong>of</strong><br />
<strong>Trustees</strong>.<br />
A schedule <strong>of</strong> the bids received has been filed with the secretary for<br />
record.<br />
(<strong>The</strong> low bidder, Ryan Bros., Inc., currently holds the contract for this work<br />
for the <strong>University</strong> for FY 1979, and its performance has been satisfactory.<br />
(This contract is to provide a source <strong>of</strong> additional equipment and labor to<br />
the ground maintenance forces at the Chicago campuses for snow removal, land-<br />
scape, and site work which is done at irregular intervals by the <strong>University</strong>. Under<br />
the contract, specified amounts <strong>of</strong> topsoil and crushed stone can be acquired to<br />
expedite completion <strong>of</strong> projects. <strong>The</strong> contractor will perform work under this<br />
contract for projects assigned by work orders issued by the Physical Plant Depart-<br />
ment on the basis <strong>of</strong> unit prices for equipment hours and/or material used.)<br />
Contracts for Remodeling, Biological Chemistry Department,<br />
College <strong>of</strong> Medicine West Tower, Medical Center<br />
(36) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate ad-<br />
ministrative <strong>of</strong>ficers, recommends award <strong>of</strong> the following contracts for remodeling