19781 UNNERSMY OF <strong>ILLINOIS</strong> 19<br />

comptroller and the secretary be authorized to execute contracts as described with<br />

the American Express Company.<br />

I concur.<br />

On motion <strong>of</strong> Mrs. Rader, authority was given as recommended.<br />

Award <strong>of</strong> Contracts for Remodeling, Eye and Ear Infirmary,<br />

Medical Center<br />

(21) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate adminis-<br />

trative <strong>of</strong>ficers, recommends award <strong>of</strong> the following contracts for remodeling the<br />

tomography x-ray unit and other work on the second floor <strong>of</strong> the Eye and Ear<br />

Infirmary building at the Medical Center campus, the award in each case being to<br />

the low bidder.<br />

General Work Base Bid<br />

J. A. Boulton & Co., Chicago. ................................... $34 700<br />

Plumbing Work<br />

Certified Mechanical Contractors, Inc., Riverside.. .................. 5 632<br />

Ventilation Work<br />

Narowetz Co., Melrose Park. ..................................... 3 256<br />

Electrical Work<br />

Mid-America Electric Co., Inc., Palatine.. ........................ 16 797<br />

Total ..................................................... $60 385<br />

Funds for this project are available from hospital income accounts.<br />

A schedule <strong>of</strong> the bids received has been filed with the secretary for record.<br />

<strong>The</strong> student advisory vote was: Aye, Miss Kooper, Mr. Sobotka, Mr.<br />

Watson; no, none.<br />

On motion <strong>of</strong> Mr. Livingston, these contracts were awarded by the<br />

following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr.<br />

Livingston, Mr. Ned, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no,<br />

none; absent, Governor Thompson.<br />

Change Order, Contract for Construction <strong>of</strong> Parking Structure,<br />

Medical Center<br />

(22) On June 16, 1976, the <strong>Board</strong> <strong>of</strong> <strong>Trustees</strong> approved the award <strong>of</strong> the contract<br />

for general work for the construction <strong>of</strong> the parking structure at the Medical Center<br />

campus to S. N. Nielson Company, Chicap.<br />

<strong>The</strong> original contract documents did not include a sealant system for the<br />

concrete. <strong>The</strong> project architectjengineer has reviewed various systems for chemical<br />

composition, behavior, guarantees, compatibility with existing concrete, and cost<br />

and now is recommending a sealant system to protect the concrete and increase the<br />

life expectancy <strong>of</strong> the structure.<br />

<strong>The</strong> technical judgment <strong>of</strong> some years ago was that if a concrete surface for<br />

an open parking facility had very little cracking, a sealant system was not needed<br />

to protect the reinforcing from a corrosive atmosphere. Today, however, the indus-<br />

try has learned that water laden with chlorides (as may be tracked in by auto-<br />

mobiles during winter) can be absorbed by concrete. This chloride mixture pene-<br />

trates to a point where damage to the concrete may occur.<br />

<strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate adminis-<br />

trative <strong>of</strong>ficem, recommends approval <strong>of</strong> a contract change order with S. N. Nielson