08.06.2013 Views

ILLINOIS - The University of Illinois Board of Trustees

ILLINOIS - The University of Illinois Board of Trustees

ILLINOIS - The University of Illinois Board of Trustees

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

112 BOARD OF TRUSTEES [October 20<br />

<strong>The</strong> Comptroller’s Monthly Report <strong>of</strong> Contracts Executed<br />

(33) <strong>The</strong> comptroller’s monthly report <strong>of</strong> contracts executed was presented.<br />

Chicago Circle<br />

Contract Work Order<br />

Wirh Whom PkTpost<br />

Wm. J. Scown Building Co. Cost-plus contract - Resurface tennis courts<br />

TOId .............................................................<br />

With Whom<br />

Northwestern Univeraity<br />

United States Department<br />

<strong>of</strong> Health, Education,<br />

and Welfare<br />

263-7am2~<br />

<strong>University</strong> <strong>of</strong> Iowa<br />

12059<br />

Total<br />

With Whom<br />

Behavioral Science Associates.<br />

Inc.<br />

TOId<br />

With Whom<br />

Dole Plumbing<br />

Dolio & Metz. Ltd.<br />

Narowetz Heating &<br />

Ventilating Co.<br />

Wm. J. Scown Building Co.<br />

Totd<br />

With Whom<br />

State <strong>of</strong> <strong>Illinois</strong>, Dcpartment<br />

<strong>of</strong> Agriculture<br />

State <strong>of</strong> <strong>Illinois</strong>, Department<br />

<strong>of</strong> Transportation<br />

State <strong>of</strong> <strong>Illinois</strong>. Institute<br />

for Environmental Quality<br />

60.047<br />

State <strong>of</strong> <strong>Illinois</strong>, Office <strong>of</strong><br />

Education:<br />

N-115<br />

RD 1-A9- 177<br />

Medical Center<br />

New Contracts<br />

Purporr<br />

Collagen mRNA translation in dro<br />

Delivcry <strong>of</strong> vaccine ampules<br />

Calcium metabolism in pregnancy and perinatal period<br />

New Contract<br />

Purpose<br />

Periorm an organizational development study<br />

Contract Work Orders<br />

..... ...<br />

Purpos*<br />

Cost-plus contract - Installarion and piping <strong>of</strong> water<br />

tank in the Drug and Horticultural Center<br />

Cost-plus contract - Architectural and engineering scr-<br />

vices for remodeling the Conference Center, College<br />

<strong>of</strong> Medicine<br />

Remodeling the Faculty/Alumni Center<br />

Cost-plus contract - Air conditionin and ventilating<br />

in rooms 237, 304, 305, 466, and 4t7 Pharmacy<br />

Cost-plus contract - Minor remodeling on Auxiliary<br />

Services Buildings 923, 937. and 938<br />

Minor remodeling in the seventh floor anatomy lahora-<br />

torles<br />

Minor remodeling to renovate thcStudent Locker Room<br />

Urbana-Champaign<br />

New Contracts<br />

Purpose<br />

Provide vetcrinarian diagnostic scrvices<br />

Analyze sediment transport in the <strong>Illinois</strong> River<br />

Low flows <strong>of</strong> <strong>Illinois</strong> streams for impounding reservoir<br />

design<br />

Investigate gas content <strong>of</strong> coal seams in the Charleston,<br />

<strong>Illinois</strong>, vicinity<br />

Operate a aifted area service center<br />

Develop a programmatic emphasis in vocational spe-<br />

cial needs<br />

Amowt to Be<br />

Paid by th#<br />

UiOlrsiQ<br />

t 18 361<br />

f 18 361<br />

AmounI lo Br<br />

Paid lo Iht<br />

Uniutrriy<br />

I 5 075<br />

112 770<br />

24 532<br />

f 142 377<br />

Amount to Bt<br />

Paid by tht<br />

LIniuerdv<br />

8 9 800<br />

1 9800<br />

AmounI to B#<br />

Yoid by the<br />

Uniurrsi@<br />

8 11 OOO<br />

13 300<br />

14 100<br />

24 487<br />

7 696<br />

10 828<br />

23 758<br />

8 105 169<br />

Amount 10 Be<br />

Paid to Ihr<br />

Univrrsiiry<br />

8 280 900<br />

14 382<br />

30 000<br />

15 OOO<br />

S 63 OOO<br />

30 721

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!