08.06.2013 Views

ILLINOIS - The University of Illinois Board of Trustees

ILLINOIS - The University of Illinois Board of Trustees

ILLINOIS - The University of Illinois Board of Trustees

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

19781 UNIVERSITY OF <strong>ILLINOIS</strong> 109<br />

Specialized consultants<br />

IcefCink .......................................... 40 000<br />

Sound System ..................................... 10 000<br />

Acoustics ......................................... 6 000<br />

Total ............................................. $96 000<br />

Employment <strong>of</strong> Architect/Engineer for Capital Development <strong>Board</strong><br />

Projects, FY 1979, Chicago Circle<br />

(24) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate ad-<br />

ministrative <strong>of</strong>ficers, recommends that the <strong>Board</strong> <strong>of</strong> <strong>Trustees</strong> request the Capital<br />

Development <strong>Board</strong> to employ Skidmnre. Owings and Merrill, Chicago, to provide<br />

the pr<strong>of</strong>essional services listed below, €or ro<strong>of</strong> resurfacing. <strong>The</strong> fee for each project<br />

will be negotiatrd in acrordance with standard procedures <strong>of</strong> the Capital Develop-<br />

ment <strong>Board</strong>.<br />

Chicago Circlp<br />

Space Realignment, Renewal, and Replacement<br />

Architecture and Art Laboratory.. ............................. $ 60 000<br />

Science and Engineering Laboratory.. .......................... 370 000<br />

Funds for the employment <strong>of</strong> the pr<strong>of</strong>essional firm have been appropriated to<br />

the Capital Development <strong>Board</strong> for FY 1979.<br />

Employment <strong>of</strong> Engineer for Chilled Water Facility for Certain<br />

Buildings, Medical Center<br />

(25) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate ad-<br />

ministrative <strong>of</strong>ficers, recommends the employment <strong>of</strong> Gritschke & Cloke, Inc., Chi-<br />

cago, for the required pr<strong>of</strong>essional services to provide chilled water facilities for<br />

the existing Men’s Residence Hall, Chicago Illini Union, Women’s Residence Hall,<br />

and the proposed Single Student Residence and Chicago Illini Union and Recrea-<br />

tion Facility at the Medical Center campus. <strong>The</strong> fee is estimated at a level up to<br />

$50,000 which will provide for the services through construction. Authorized re-<br />

imbursements for the project are estimated to be $5,000.<br />

Funds are available from the proceeds <strong>of</strong> the sale <strong>of</strong> <strong>University</strong> <strong>of</strong> <strong>Illinois</strong><br />

Auxiliary Facilities System Revenue Bonds, Series N.<br />

Employment <strong>of</strong> Engineer for Chilled Water Facility for Certain<br />

Union Addition, Medical Center<br />

(26) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate ad-<br />

ministrative <strong>of</strong>ficers, recommends the employment <strong>of</strong> Loebl, Schlossman & Hackl,<br />

Chicago, for the pr<strong>of</strong>essional architectural and engineering services required for an<br />

addition to the Chicago Illini Union at the Medical Center campus. <strong>The</strong> esti-<br />

mated fee for the firm’s services through construction is at a level up to $275,000,<br />

plus reimbursements authorized by the <strong>University</strong>, the latter estimated to be<br />

$40,000.<br />

Funds are available from the proceeds <strong>of</strong> the sale <strong>of</strong> <strong>University</strong> <strong>of</strong> <strong>Illinois</strong><br />

Auxiliary Facilities System Revenue Bonds, Series N.<br />

Employment <strong>of</strong> Architect/Engineer for Addition and Remodeling,<br />

lllini Union Bookstore, Urbana<br />

(27) <strong>The</strong> president <strong>of</strong> the <strong>University</strong>, with the concurrence <strong>of</strong> appropriate ad-<br />

ministrative <strong>of</strong>ficers, recommends the employment <strong>of</strong> Richardson, Severns, Scheeler,<br />

Greene & Associates, Inc., Champaign, to provide the required pr<strong>of</strong>essional archi-<br />

tectural and engineering services, through the completion <strong>of</strong> construction <strong>of</strong> an

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!