08.06.2013 Views

Measures for Progress: A History of the National Bureau of Standards

Measures for Progress: A History of the National Bureau of Standards

Measures for Progress: A History of the National Bureau of Standards

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GAJTHERSBURG 505<br />

car) from downtown Washington, and available <strong>for</strong> an estimated $750,000.29<br />

Four years later Congress appropriated approximately $23.5 million as <strong>the</strong><br />

first installment on a 'building program estimated to cost in <strong>the</strong> neighborhood<br />

<strong>of</strong> $70 million <strong>for</strong> buildings and $45 million <strong>for</strong> special facilities and equip-<br />

ment.<br />

On June 14, 1961, ground was broken. The first contracts had been<br />

let <strong>for</strong> construction <strong>of</strong> <strong>the</strong> central boiler plant, to serve <strong>the</strong> complex planned,<br />

and <strong>for</strong> an engineering mechanics laboratory. That fall additional con-<br />

tracts were negotiated <strong>for</strong> a radiation physics laboratory, administration<br />

building, supply and plant structures, <strong>the</strong> shops, and a service building. The<br />

third phase called <strong>for</strong> construction <strong>of</strong> seven general purpose laboratories,<br />

each occupying an area larger than a football field. The fourth and final<br />

phase was to include several small special purpose laboratories and a re-<br />

actor building. When completed <strong>the</strong> new <strong>Bureau</strong> complex would comprise<br />

over 20 structures.<br />

The ad hoc committee report <strong>of</strong> 1953, laying down fresh guidelines <strong>for</strong><br />

<strong>the</strong> work <strong>of</strong> <strong>the</strong> <strong>Bureau</strong>, gave it a direction it had almost lost in <strong>the</strong> turbulence<br />

<strong>of</strong> <strong>the</strong> postwar decade. The approval <strong>of</strong> plans to construct a great <strong>Bureau</strong><br />

plant at Gai<strong>the</strong>rsburg bespoke new national needs and a confidence in <strong>the</strong><br />

future. It also reflected <strong>the</strong> phenomenal involvement <strong>of</strong> <strong>the</strong> Federal Govern-<br />

ment in postwar science.<br />

Be<strong>for</strong>e World War II, Federal participation in research in <strong>the</strong> physical<br />

sciences was negligible. Striving to close <strong>the</strong> .gap in <strong>the</strong> technology <strong>of</strong> war,<br />

<strong>the</strong> Federal research budget between 1940 and 1944 rose from $74 to $1,377<br />

million. Two decades later, in continuing escalation, Federal research and<br />

development exceeded $15 billion annually or close to 15 percent <strong>of</strong><strong>the</strong> na-<br />

tional budget. Almost 60 percent <strong>of</strong> all research scientists and engineers in<br />

<strong>the</strong> Nation worked wholly or in part on programs financed by <strong>the</strong> Govern.<br />

ment. Approximately 68 percent '<strong>of</strong>. <strong>the</strong> $15 billion went into development<br />

research, 22 percent to applied research, and 10 percent to basic research,<br />

encompassing every field <strong>of</strong> physical, biological, and social science. The<br />

Department <strong>of</strong> Defense and <strong>the</strong> <strong>National</strong> Aeronautic and Space Administra-<br />

tion alone accounted <strong>for</strong> nearly 80 percent <strong>of</strong> <strong>the</strong> total funds, supporting de-<br />

velopment research in hardware immediately pertinent to <strong>the</strong> national de-<br />

fense, as well as basic and applied research in meteorology, oceanography,<br />

astronomy, high temperature physics, and low temperature physics.3°<br />

20 NBS Budget and Management Division, Summary <strong>of</strong> Files on Gai<strong>the</strong>rsburg (Office <strong>of</strong><br />

<strong>the</strong> Director). Early estimates <strong>of</strong> <strong>the</strong> cost <strong>of</strong> <strong>the</strong> Gai<strong>the</strong>rsburg plant appear in Senate<br />

Hearings * * * 1958 (Apr. 11, 1957), p. 138.<br />

20 <strong>National</strong> Science Foundation, "Federal Funds <strong>for</strong> Research, Development, and o<strong>the</strong>r<br />

Scientific Activities" (Washington, D.C., 1964), p. 2 and appendix, table C—32; NSF,<br />

"Reviews <strong>of</strong> Data on Research and Development" (Washington, D.C., 1963), p. 1.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!