to the workers. Detailed work area monitorjng plan. Plan for periodic medical<br />

examinations<br />

of the workers<br />

exoosed.<br />

24. Details of activity Wse hazards of plant operations, likely heat stress to the workers,<br />

radiation heat level in & around the furnaces, monitoring and safety measures for the<br />

same_<br />

25- Detailed risk assessment repo( including identification of the most hazardous activity,<br />

its sub activity, prediction of the worst-case scenario and maxtmum credible accident<br />

scenario along with damage distances and preparedness plan to combat such situation<br />

and risk mitigation measures.<br />

2tj. Detailed greenbelt development plan as per CpCB guidelines giving.letails of number<br />

of trees, area of the green belt marked on ihe lay out plan, types of species to be<br />

planted and the year'wise schedule of green belt development and budgetary outlay<br />

should be submifted.<br />

27. Proposal for socio economic upliftrnent aotivities alongwith ume bound action plan and<br />

cost should be included.<br />

28. A tabular chart for the issues raised and addressed during public hearing/consultation<br />

should be provided<br />

29. Details of scheme for surface as well as roof top rain water harvesting and ground water<br />

recharge should be included.<br />

30. Compliance of norms given under EPA Rules and CREP guidelines for the existing<br />

plant and action plan for proposed activities to achieve the norms.<br />

31. Details ol fatal I non-fatal accidents, loss of life or man hours, if any, occr.rrred in the<br />

existing unit in last three years anci measures proposed to be taken for avoiding<br />

reoccurence of such accidents in fufure.<br />

32. Copies of previous environmental clearances obtained. Point-wise compliance to the<br />

specific and general conditions stipulated in the environmental clearances.<br />

33. compliance status of the existing unit with respect to various conditions given in<br />

consent of <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong> (GPCB). Records of any legal breach of<br />

. Environmental laws i.e. details of show- cause notices, closure notices etc. sewed by<br />

the GPCB to the existing unit in last three years and actions taken then after for<br />

prevention of pollution.<br />

The draft EIA reporl also covering the above additional TOR shall be prepared and<br />

submitted to the <strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong> for conduciing the public hearing /<br />

consultation process as per the provisions of the EIA Notification, 2006. The project<br />

would be appraised on receipt of the final EIA report.<br />