Click Here - Gujarat Pollution Control Board
Click Here - Gujarat Pollution Control Board
Click Here - Gujarat Pollution Control Board
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
gas emission rate emission ffom the each utility including Reheating Fumaces, Boilers<br />
etc. (vii) Air <strong>Pollution</strong> <strong>Control</strong> Measures proposed to each of the utility along with its<br />
adequacy (viii) List the sources of fugitive emission from the unit along with its<br />
quantification and proposed measures to control it.<br />
',|3. Technical details of ESP to be installed as air pollution control system along with its<br />
adequacy. Details of provisions to be kept in ESP to ensure that in any case the air<br />
emission does not cross the GPCB norms including provision of standby field in the<br />
ESP, preventive maintenance, failure / tripping conhol system, guarantee from the ESP<br />
supplier, altemative anangements in case of the failure 1 tripping of lhe ESP etc.<br />
14. Technical details of Induction Furnace including its cooliog and interlocking systems<br />
alongwith drawing of the induction furnace along with its adequacy. Details of Air<br />
Pollulion <strong>Control</strong> Measures proposad for tnduction Furnace. Details of specific<br />
measures to ensure that emission from the lnduction Furnace will not escape from the<br />
furnace in form of fugitive emission bypassing the air pollution control system.<br />
15. Generation of waste gases and their utilization have to be set out.<br />
16. Detailed plen for prevention and control of fugitive emission I dusting at each and every<br />
stage of coal handling including unloading / loading at Kandala port, transPortation from<br />
poil to plant, unloading / loading / stacking / conveyance / iransfer at plant alongwith<br />
detailed specifications & schematic diagram of water sprinkler system arrangement.<br />
17. lmpact of the transport of raw material and finished product on the transporl system<br />
should be assessed and provided.<br />
18. Existing status of water quality, soit quality, noise level, flora, fauna etc. in the study<br />
area and impacts of the project expansion on ihe same along with mitigation measures.<br />
19. Details on hazardous / solid waste generation, handing, storage, utilization and<br />
disposal, for each type of waste. Copies of MOU / agreements done with actual<br />
consumers regarding utilization of fly ash, bottom ash and slag etc. should be included.<br />
20. Data on air emissions, wastewater generation and solid / hazardous waste generation<br />
and management for the existing plant should also be incorporated.<br />
21. Copies of membership certificate of Common Environmental lnfrastructure like TSDF, if<br />
any taken, should be incorporated.<br />
22. A detailed EMP including the protection and mitigation measures for impact on human<br />
health and environment as wetl as detailed monitoring plan and environmental<br />
management cell proposed for implementation and monitoring of EMP. The EMP should<br />
also include the concept of waste-minimisation, recycle/reuse/recover techniques,<br />
energy conservation, and natural resource conservation. Total capital cost and recurring<br />
cosuannum earmarked for environment pollution oontrol measures.<br />
23. Occupational health impacts on the workers and mitigation m€asures proposed to avoid<br />
the human health hazards along with the personal protective equipment to be provided<br />
3J