Welspun Power and Steel Limited, suffev No. 652, €53. 655. 559, Vill: Varsamedi.<br />
Tai Aniar. Dist: Kutchhr<br />
This is an existing unrt proposing expansion of production capacities of existing products as<br />
well as installation of AFBC Boiler (Standby arrangement) - 6 MW, as shown in tab'le betow<br />
Name of Products /By Products &<br />
Intermediate Products<br />
Existing<br />
MTlmonth<br />
Proposed<br />
MTihonth<br />
Total<br />
MT/ month<br />
TMT Bars Rods 6000 14000 20000<br />
MS Inqots & Billets<br />
Anqles. shaper & section<br />
SDonqe Iron<br />
Captive Power Plant<br />
. WHRB<br />
. Lignite, Coal char based (AFBC) boiler<br />
6000<br />
6000<br />
12000<br />
8MW<br />
4MW<br />
20000<br />
12000<br />
30 TPH AFBC<br />
boller as stand<br />
by 6 Mw power<br />
26000<br />
18000<br />
12000<br />
Option I Oatlon z<br />
8MW 2MW<br />
4MW 10 MW<br />
plant<br />
12 r'lw 12 MW<br />
. Total 12 MW<br />
Expected cost of the project will be Rs. '175 Crores. The proposed expansion will be within<br />
existing premises and no additional land will be required. Requirement of fresh water will be<br />
3048 KLD after the proposed expansion, which will be fulfilled lhrough <strong>Gujarat</strong> Waier<br />
Infrastructure Ltd. (GWIL). There will be no industrial efflueni generation from process. lt is<br />
proposed to install one Boiler of 30 TPH capacity for generation of power (6 MW) as<br />
standby arrangement for existing WHRB plant. lmported coal - 125 MT/day and coal char -<br />
56 MT/day will be used as fuel in the proposed 30 TPH Boiler and ESP will be provided as<br />
APCM. Proposed 30 TPH Boiler will be operated when exlsting sponge iron kiln is not in<br />
operation (i.e. WHRB plant non operation phase) and total power generation shall not<br />
increase from existing 12 MW. lt is also proposed to install three Reheating Furnaces of 40,<br />
30 and 20 TPH capacities. FO - 3.5 Kuday and Gasifier gas will be used as a fuel in<br />
Reheeting Furnaces and bag fitter will be provided as APCM. Total ash generation will be<br />
1258 lVlT/Month (1006-4 MT/Nilonth fly ash + 251,6 MTiMonth bed ash), which will be stored<br />
in RCG Silos and subsequently utitized in caplive brick manufacturing plant at WGSRL or<br />
sold to cement manufacturers, Slag - 2266 MT/Month will be utitized in brick. manufacturing<br />
or road construciion or sold as aggregate for construction activity. Mill scale - 120<br />
MT/Month will be reused in process. Existing green bell is 6 hectares and it is proposed to<br />
develop 1 1 .48 hectare area as green belt.<br />
The technical presentation by the project proponent included product protile, general<br />
information about ihe project, site map, products, raw materials and utilities, waste<br />
generation, hazards and control, water consumption and efftuent generation, water balance<br />
diagram, analysis of pollution parameters before and after plant working, pollrrtion<br />
parameters and assessment with siandards (norms), resource consumption and<br />
conservation, risk estimation, proposed TOR etc.<br />
While asking by the commiftee, the project proponent confirmed that total production of<br />
sponge iron for captive consumption and for selling outslde will not increase from existing<br />
12000 MT/Month. After detailed discussion on the proiect expansion, the ToR proposed by<br />
5)