Click Here - Gujarat Pollution Control Board

Click Here - Gujarat Pollution Control Board Click Here - Gujarat Pollution Control Board

06.06.2013 Views

+IHELSP|JN .'tr--.. *....-.:. _ 24 Whether unit has submitted Environment Audit Report zl regularly to GPCB ibNexistrng p la nt? What were suggestions of Auditor in last two years report? How many skilled and unskilled people from surrounding area will get employment in proposed expansion project? Hope of our above clarification line with your requirement, Yours fa ithfu lly, welspun P?.Tr st+'t Limited WI \1 ,r // Authorized Signatoty ' l+L ffiffii TEEL LIIVI Yes, regular Environment Audit Report has been prepared, a copy of suggestion of Auditor is attached herewith as Annexure-3. 150 skilled and 150 unskilled people from surrounding area will get employment in proposed expansion oroiect "".r,rr:,..r..' corpo?te Oflicei Webpur llo!se 4lh Floor. Kamala Ciry Senapati Bapat t arg. I Fax +91 22 249oao2o E-mail welspun@bom2 vsnl nel.in Mumbar 400013(lNDlA). URL w\,vwwelspun.com Registered Office : l^blspln City. Sutuey No 650. Village Ve.samedr Ta AnFr Orsl Kulch Guiaral _ 370 110 INDA Tel +91-2436-279044151 Fax +91 2836 279050 E-ma l:wpsl@welspun corn

1. Name & Address of the Unit A ,.{ , l , fl'YlplLvr Iron And Steel 2. Date & Time of Coltection 3. Type of Sample 4. Sampling Point 5. Fuel 6, APCM T.Thimble & Weight (gm) 8. Temperature on Gollection 10. Volume-Gas Passed 11. Parametens 13. Cap No & Weight IlrE REPORT for AIR : STACK Processing From Ore I Sc|ap I Integated Ste Power & Steel P. Ltd(sponge Of 12 Mw Power Plant )- 18109 VILL-VARSHAMEDI, - 37ollo,Taluka : Aniar, Dlstrict : Kutch, GIDC : Not In Gidc 1 (1410 to 1440) Start Date : 18/09/2009 REP , (lnsp Type : Rou-Routine Visit) stack to killan l&2 Bag ,E.S.P,Green Belt 188tW 168 9. Volume-Absord Media : 450tit PM,60lit forso2,nox 3 Time(Min) : 0 141. Carboys Marks : A-1 Guiarat Pollution Conbsl Board Jamnagar Sardar Patel Bhsvan Rameshwar Nagar Jamnagar-361008 Tele10288)2752366 Signature v.s.soNt,s.o 16/09/2010

1. Name &<br />

Address of the Unit<br />

A<br />

,.{<br />

, l , fl'YlplLvr<br />

Iron And Steel<br />

2. Date & Time of Coltection<br />

3. Type of Sample<br />

4. Sampling Point<br />

5. Fuel<br />

6, APCM<br />

T.Thimble & Weight (gm)<br />

8. Temperature on Gollection<br />

10. Volume-Gas Passed<br />

11. Parametens<br />

13. Cap No & Weight<br />

IlrE<br />

REPORT for AIR<br />

: STACK<br />

Processing From Ore I Sc|ap I Integated Ste<br />

Power & Steel P. Ltd(sponge Of 12 Mw Power Plant )- 18109<br />

VILL-VARSHAMEDI,<br />

- 37ollo,Taluka : Aniar, Dlstrict : Kutch, GIDC : Not In Gidc<br />

1 (1410 to 1440) Start Date : 18/09/2009<br />

REP<br />

, (lnsp Type : Rou-Routine Visit)<br />

stack to killan l&2<br />

Bag ,E.S.P,Green Belt<br />

188tW<br />

168 9. Volume-Absord Media :<br />

450tit PM,60lit forso2,nox<br />

3<br />

Time(Min) : 0<br />

141. Carboys Marks : A-1<br />

Guiarat <strong>Pollution</strong> Conbsl <strong>Board</strong><br />

Jamnagar<br />

Sardar Patel Bhsvan<br />

Rameshwar Nagar<br />

Jamnagar-361008<br />

Tele10288)2752366<br />

Signature<br />

v.s.soNt,s.o<br />

16/09/2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!