\A/ELSPIrw<br />
4 What was the process of<br />
acquiring 85 Acre land at the<br />
time of installation of first<br />
plant?<br />
5 Why the additional land was<br />
acquired to the extent before<br />
initiating the plant?<br />
6 Why coal/lignite based captive<br />
power plant has been selected<br />
when project proponent is<br />
weighing on sustainable<br />
development? Whether<br />
alternative fuel has been<br />
7<br />
thought at planning stage?<br />
Please give details.<br />
Please exact details on water<br />
consumption of current Plant<br />
and proposed expansion.<br />
8 Please give detailed water<br />
balance diagram with water<br />
utilization in each aPPlication<br />
and its disposal.<br />
9 Sardar Sarovar Narmada Nigam<br />
Policy mentions that first<br />
priority will be given for<br />
drinking water, second<br />
3q'<br />
WELSPUN POWER AND STEEL LIMI'TED<br />
EilS<br />
I Qt {Ln}'<br />
t.\sst RED<br />
I UKAS<br />
)g,l , t5() (rrxn 19<br />
Option L (12 MWI<br />
8MW generates through WHRB and<br />
4 MW generates through AFBC<br />
Boiier.<br />
Option 2 (12MW)<br />
2 MW generates through WHRB<br />
and 10 MW will be generated<br />
through AFBC Boiler.<br />
85 Acre land has been purchased<br />
from Private land owners as per<br />
prevailing Land Acquisition Law.<br />
Considering the future expansion,<br />
company has procured the<br />
additional land at the starting of the<br />
plant.<br />
In fact B MW power Plant is<br />
generated through WHRB. The<br />
proposed 30 TPH AFBC Boiler is a<br />
stand-by arrangement and will be<br />
operative when WHRB are not in<br />
operation.<br />
Please find enclosed herewith<br />
water balance diagram as<br />
Annexure-5, which dePicts the<br />
existing and proposed water<br />
consumption.<br />
Please find enclosed herewith<br />
water balance diagram as<br />
Annexure-5, which dePicts the<br />
existing and proPosed water<br />
consumption.<br />
As per Government PolicY.<br />
Corporate Office:<br />
Welspun House, 4th Floor,<br />
Kamala City, Senapati Bapat Marg<br />
Lower Parel (VWst),<br />
Mumbai-4000'1 3(lNDlA).<br />
o".r,.rr-uu]r.r<br />
E-mail: welspun@bom2 vsnl.net.in<br />
URL www.welsoun.com<br />
Registerecl Office :<br />
WelspunCity.SurveyNo650 Villageversamedr Ta Anjaf Drst Kutch <strong>Gujarat</strong>-370110 rNDIA Ter i91-2836-279000/51 Fax +91-2836-279050E-mail:wpsl@welspuncom