06.06.2013 Views

Click Here - Gujarat Pollution Control Board

Click Here - Gujarat Pollution Control Board

Click Here - Gujarat Pollution Control Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

\A/ELSPIrw<br />

4 What was the process of<br />

acquiring 85 Acre land at the<br />

time of installation of first<br />

plant?<br />

5 Why the additional land was<br />

acquired to the extent before<br />

initiating the plant?<br />

6 Why coal/lignite based captive<br />

power plant has been selected<br />

when project proponent is<br />

weighing on sustainable<br />

development? Whether<br />

alternative fuel has been<br />

7<br />

thought at planning stage?<br />

Please give details.<br />

Please exact details on water<br />

consumption of current Plant<br />

and proposed expansion.<br />

8 Please give detailed water<br />

balance diagram with water<br />

utilization in each aPPlication<br />

and its disposal.<br />

9 Sardar Sarovar Narmada Nigam<br />

Policy mentions that first<br />

priority will be given for<br />

drinking water, second<br />

3q'<br />

WELSPUN POWER AND STEEL LIMI'TED<br />

EilS<br />

I Qt {Ln}'<br />

t.\sst RED<br />

I UKAS<br />

)g,l , t5() (rrxn 19<br />

Option L (12 MWI<br />

8MW generates through WHRB and<br />

4 MW generates through AFBC<br />

Boiier.<br />

Option 2 (12MW)<br />

2 MW generates through WHRB<br />

and 10 MW will be generated<br />

through AFBC Boiler.<br />

85 Acre land has been purchased<br />

from Private land owners as per<br />

prevailing Land Acquisition Law.<br />

Considering the future expansion,<br />

company has procured the<br />

additional land at the starting of the<br />

plant.<br />

In fact B MW power Plant is<br />

generated through WHRB. The<br />

proposed 30 TPH AFBC Boiler is a<br />

stand-by arrangement and will be<br />

operative when WHRB are not in<br />

operation.<br />

Please find enclosed herewith<br />

water balance diagram as<br />

Annexure-5, which dePicts the<br />

existing and proposed water<br />

consumption.<br />

Please find enclosed herewith<br />

water balance diagram as<br />

Annexure-5, which dePicts the<br />

existing and proPosed water<br />

consumption.<br />

As per Government PolicY.<br />

Corporate Office:<br />

Welspun House, 4th Floor,<br />

Kamala City, Senapati Bapat Marg<br />

Lower Parel (VWst),<br />

Mumbai-4000'1 3(lNDlA).<br />

o".r,.rr-uu]r.r<br />

E-mail: welspun@bom2 vsnl.net.in<br />

URL www.welsoun.com<br />

Registerecl Office :<br />

WelspunCity.SurveyNo650 Villageversamedr Ta Anjaf Drst Kutch <strong>Gujarat</strong>-370110 rNDIA Ter i91-2836-279000/51 Fax +91-2836-279050E-mail:wpsl@welspuncom

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!