Click Here - Gujarat Pollution Control Board
Click Here - Gujarat Pollution Control Board
Click Here - Gujarat Pollution Control Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
\,rlELSP[rN<br />
10. Why coal/lignite based captive<br />
power plant has been selected<br />
when project proponent is<br />
weighing on sustainable<br />
development? Whether<br />
alternative fuel has been<br />
Ll.<br />
thought at planning stage?<br />
Please give details.<br />
Please exact details on water<br />
consumption of current plant<br />
and proposed expansion.<br />
L2. Please give detailed water<br />
balance diagram with water<br />
utilization in each application<br />
and its disposal.<br />
13. How many people are working<br />
in existing production plant at<br />
Anjar and after proposed<br />
expansion?<br />
L4. Please justify 6 monitoring<br />
location for baseline<br />
15.<br />
monitoring for such large scale<br />
expansion.<br />
It is written that fly ash and<br />
iron sludge / gypsum will be<br />
sold to brick / cement<br />
manufacturer. Whether any<br />
agreement with any of<br />
manufacturer has been done<br />
for ash selling? please give<br />
copy of it.<br />
1.6. Please give name of CPCB<br />
authorized recycler/trader to<br />
whom waste oil and other solid<br />
3{<br />
WELSPUN POWER<br />
AND STEEL<br />
LIMITED<br />
Wffi<br />
In fact 8 MW power plant is<br />
generated through WHRB. The<br />
proposed 30 TPH AFBC Boiler is a<br />
stand-by arrangement and will be<br />
operative when WHRB are not in<br />
operation.<br />
Please find enclosed herewith<br />
water balance diagram as<br />
Annexure-5, which depicts the<br />
existing and proposed water<br />
consumption.<br />
Please find enclosed herewith<br />
water balance diagram as<br />
Annexure-5, which depicts the<br />
existing and proposed water<br />
consumption.<br />
In the existing plant 500 No. of<br />
persons are working and additional<br />
400 No. of persons will get<br />
employment due to proposed<br />
expansion.<br />
We have considered the monitoring<br />
location based on predominant<br />
wind direction during study period<br />
of near human settlement.<br />
Presently we are selling the Fly Ash<br />
to following brick manufacturer and<br />
proposed fly ash also will be sold to<br />
the same brick manufacturer. Also<br />
Captive brick manufacturing plant<br />
has been installed by Welspun<br />
<strong>Gujarat</strong> Stahl Rohren Ltd.<br />
At present used oil is utilizing for<br />
lubrication purpose within the<br />
premises. for proposed plant we<br />
' a | )<br />
&4"\\<br />
Corporatc Office:<br />
Vwlspun House, 4th Floor.<br />
Kamala City. Senapati Bapat Marg<br />
Lower Parel (Vvest),<br />
Mumbai-40001 3(lNDtA).<br />
PH. : +91-22-66136000/2490 BOOO<br />
Fax . +91-22-24908020<br />
E-mail. welspun@bom2 vsnl.net. in<br />
URL: www.welspun,com<br />
\<br />
Registerecl Office :<br />
vlilelspunCity surveyNo650 villageversamedr Ta AnJar Drsl Kutch Guiaral-37011o INDIA Tel 191-2836-27gOOOi51Fax +g1-2E36-279O5OE-mail:wpsl@welspuncom