06.06.2013 Views

Click Here - Gujarat Pollution Control Board

Click Here - Gujarat Pollution Control Board

Click Here - Gujarat Pollution Control Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

\,rlELSP[rN<br />

10. Why coal/lignite based captive<br />

power plant has been selected<br />

when project proponent is<br />

weighing on sustainable<br />

development? Whether<br />

alternative fuel has been<br />

Ll.<br />

thought at planning stage?<br />

Please give details.<br />

Please exact details on water<br />

consumption of current plant<br />

and proposed expansion.<br />

L2. Please give detailed water<br />

balance diagram with water<br />

utilization in each application<br />

and its disposal.<br />

13. How many people are working<br />

in existing production plant at<br />

Anjar and after proposed<br />

expansion?<br />

L4. Please justify 6 monitoring<br />

location for baseline<br />

15.<br />

monitoring for such large scale<br />

expansion.<br />

It is written that fly ash and<br />

iron sludge / gypsum will be<br />

sold to brick / cement<br />

manufacturer. Whether any<br />

agreement with any of<br />

manufacturer has been done<br />

for ash selling? please give<br />

copy of it.<br />

1.6. Please give name of CPCB<br />

authorized recycler/trader to<br />

whom waste oil and other solid<br />

3{<br />

WELSPUN POWER<br />

AND STEEL<br />

LIMITED<br />

Wffi<br />

In fact 8 MW power plant is<br />

generated through WHRB. The<br />

proposed 30 TPH AFBC Boiler is a<br />

stand-by arrangement and will be<br />

operative when WHRB are not in<br />

operation.<br />

Please find enclosed herewith<br />

water balance diagram as<br />

Annexure-5, which depicts the<br />

existing and proposed water<br />

consumption.<br />

Please find enclosed herewith<br />

water balance diagram as<br />

Annexure-5, which depicts the<br />

existing and proposed water<br />

consumption.<br />

In the existing plant 500 No. of<br />

persons are working and additional<br />

400 No. of persons will get<br />

employment due to proposed<br />

expansion.<br />

We have considered the monitoring<br />

location based on predominant<br />

wind direction during study period<br />

of near human settlement.<br />

Presently we are selling the Fly Ash<br />

to following brick manufacturer and<br />

proposed fly ash also will be sold to<br />

the same brick manufacturer. Also<br />

Captive brick manufacturing plant<br />

has been installed by Welspun<br />

<strong>Gujarat</strong> Stahl Rohren Ltd.<br />

At present used oil is utilizing for<br />

lubrication purpose within the<br />

premises. for proposed plant we<br />

' a | )<br />

&4"\\<br />

Corporatc Office:<br />

Vwlspun House, 4th Floor.<br />

Kamala City. Senapati Bapat Marg<br />

Lower Parel (Vvest),<br />

Mumbai-40001 3(lNDtA).<br />

PH. : +91-22-66136000/2490 BOOO<br />

Fax . +91-22-24908020<br />

E-mail. welspun@bom2 vsnl.net. in<br />

URL: www.welspun,com<br />

\<br />

Registerecl Office :<br />

vlilelspunCity surveyNo650 villageversamedr Ta AnJar Drsl Kutch Guiaral-37011o INDIA Tel 191-2836-27gOOOi51Fax +g1-2E36-279O5OE-mail:wpsl@welspuncom

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!