lRef: #PM/MP/609/2010<br />

'fo<br />

lShri M. Thennarasan<br />

Oollector and Chairman EPH Committee,<br />

tOollector office,<br />

lKutch<br />

Date: 13 September 2010<br />

lsub. : Environmental Public Hearing of welspun power & steel Ltd at Anjar,<br />

Kutch on 17.09.2010.<br />

iSir,<br />

Page I of2<br />

3v<br />

\/Ve have reviewed EIA report of above mentioned project. Following are our comments/suggestions/observations<br />

rcgarding project and EIA report.<br />

1. Please give details of GPCB visit report and airlwater/solid waste sample analysis report for existing unit in<br />

last two years.<br />

Please give details of MoEF regional office visit report in last two years, if any.<br />

Whether company had been issued show cause notice / closure order/notice under Water Act 1974 or Air Act<br />

1981 or Environment Protection Act 1986 since starting of existing unit? lf yes give details of it. Also what<br />

remedies had been taken for restarting operation?<br />

\Mether unit has submitted Environmental Audit Reports regularly to GPCB for existing plant? \y'y'hat were<br />

suggestions of Auditor in last two years report?<br />

\Men was Environmental Clearance applied for proposed production and what is date of Terms of Reference<br />

issued?<br />

€i. Please attach copy of Terms of Reference issued.<br />

7'. why there are two options in Table 1.1 about proposed power plant?<br />

€1. What was process of aoquiring 85 acre land at the time of installation of first plant?<br />

€1. why so much additional land was acquired at the starting of plant?<br />

10. Why coal/lignite based captive power plant has been selected when project proponent is weighing on<br />

sustainable development? Whether alternative fuel has been thought at planning stage? Please give details.<br />

11. Please exact details on water consumption of current plant and proposed expansion.<br />

/ 12. give detailed water<br />

lease<br />

balance diagram with water utilization in each application and its disposal.<br />

How many people<br />

U{<br />

are working in existing production plant at Anjar and after proposed expansion?<br />

14' Please justify 6 monitoring location for baseline monitoring for such large scale expansion.<br />

15. lt is written that fly ash and iron sludge / gypsum will be sold to brick / cement manufacturer. \Mether any<br />

agreement with any of manufacturer has been done for ash selling? Please give copy of it.<br />

16. Please give name of CPCB authorized recycler/trader to whom waste oil and other solid hazardous waste is<br />

given for existing unit.<br />

17. Please provide detailed greenbelt development programme, in terms of type and no. of species, area and<br />

water requirement.<br />

| 18-)W many skilled and unskilled people<br />

2,<br />

3.<br />

zl.<br />

tt.<br />

from surrounding area will get employment in proposed expansion<br />

L--/project?<br />

Y'ours truly<br />

lVlahesh Pandya<br />