Click Here - Gujarat Pollution Control Board
Click Here - Gujarat Pollution Control Board
Click Here - Gujarat Pollution Control Board
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
summary page No 10 It is<br />
mention 316 acre & irr the<br />
English sunmary it is mention<br />
600 acre.<br />
o In the EIA Report page I'lo 33<br />
windrose diagram is for the<br />
surat plant that's whY it :is not<br />
clear Whether studY has been<br />
done at surat or anjar. RsPots<br />
is not ok.<br />
o For this project, how much<br />
Km. CompanY has done the<br />
environment studY & what<br />
would be main Place for<br />
study?<br />
o The environmental studY is<br />
done in 10KM radius from the<br />
Versamedi village where as<br />
project site, it is 3KM awaY<br />
from Versamedi, Actual studY<br />
is to be conducted within<br />
10Km radius from the Project<br />
side. Therefore this studY is<br />
wrong and Permission not be<br />
granted.<br />
o For the Project total water<br />
required 3038000 Lit Per daY<br />
from which 2843000 lit water<br />
would be withdraw from the<br />
NarmadaNigam.<br />
. The basic policy of the<br />
Narmada nigam is to give<br />
preference for drinking water<br />
supply.<br />
Representation from Shri Humbal Aja<br />
lMema, vill : Bhimasar Taluka Anjar-<br />
Kutchh<br />
. Due to company emPloYment<br />
of villagers has increased and<br />
better education to village<br />
student & the economic<br />
condition of village has been<br />
improved<br />
Representation from Smt. Kanku Ben,<br />
vill : Varsamedi, Taluka Anjar-Kutchh<br />
o On behalf of ve.rsamedi<br />
villager she rePresented that<br />
due to company, social &,<br />
economical growth of villagers<br />
It is typograPhic mistake in the<br />
software data entrY. the actual<br />
data is collected from Anjar.<br />
Environmental studY has been<br />
conducted Within the 10 km<br />
radius from the Project site.<br />
Environmental studY has been<br />
conducted Within the 10 km<br />
radius from the Project site.<br />
Water procured from the GWIL<br />
pipeline. Distribution of the<br />
water is based on the<br />
government PolicY.<br />
Suggestion is welcomed bY the<br />
company.<br />
Suggestion is welcome bY the<br />
company.