06.06.2013 Views

Click Here - Gujarat Pollution Control Board

Click Here - Gujarat Pollution Control Board

Click Here - Gujarat Pollution Control Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

has been taken from galpadar<br />

farmer house of and report<br />

preparation agency has<br />

indicated that the<br />

econcentration in the Air &<br />

Water is on higher side.<br />

Though in the report it is<br />

mentioned below the limit.<br />

Therefore the manipulation has<br />

been made in the information<br />

and information is wron€l<br />

therefore we demand to cancel<br />

the report & re organizedl the<br />

public hearing.<br />

The type of the solid waste<br />

generation from the proposed<br />

project & method of disposal.<br />

From the proposed projerct<br />

kindly give the solid waste<br />

generation quantity & dir;posal<br />

method.<br />

Whether captive brick<br />

manufacturing plant will be<br />

installed for proposed project.<br />

Kindly give the recycler name<br />

for the disposal of used oil.<br />

How many permanent<br />

employee are there, from them<br />

how many are local. what<br />

percentage<br />

From the proposed project<br />

what would be additionaX<br />

employment, from that how<br />

many local people will get the<br />

employment. What is the<br />

percentage.<br />

waste Fly ash sold to brick<br />

manufacture and cement<br />

manufacture and slag is utilized<br />

for road construction. Used oil<br />

is utilized for lubrication<br />

purpose within plant premises.<br />

Fly ash is given to brick<br />

manufacturer and also captive<br />

brick manufacturing plant is<br />

installed at Welpsun corp ltd.<br />

In welspun power and steel<br />

permenantly 500 employees<br />

are employed from that 289 are<br />

local villagers. ln the welspun<br />

group total 10,500 local people<br />

got the employment.<br />

Due to proposed project direct<br />

and indirect 400 people will get<br />

the employment in which<br />

priority to be given to local<br />

villagers as per the merit basis.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!