If company has 600 acre land & green belt is on 316 acre land then why the additional agriculture land has been acquired. Ifgreen belt is 375 acre whv it is shown so Lsss. Whether the Welspun hars obtained permission from Guj arat Water Infrastrucl;ure limited? Presently what is the water consumption & What wiltl be the consumption in proposed project? The existing waste water generation and additional wastewater generation from proposed project. Whether ETP plant is insitalled to treat the waste water dL what is the capacity In proposed project what, will the capacity of ETP to treat the waste water After the treatment where the treated water will be discharged by welpsun: In The EIA Report welpr;un company has represented that the main source of Air Pollution is dusting due tto wind . What about the emission from chimney and emission also due to vehicles transportation. Given retrrort is wrong and demand for cancellation the public hearing. As a part of proposed EIA report the Air & Water sample is approximate 28 Acres). Welspun Power and Steel Ltd. is having 85 acres of Land. Yes permission has been obtained. Presently water consumption is 1587 m3/Day and proposed water consumption would be 1461m3/Day Presently 779 mtTDay wastewater is genareted which is utilized for surface cooling in sponge iron kiln, green belt development suppression. and dust o ETP plant is not required. ln the EIA report details of APC measures and detail of incremental increase of different pollutant parameter is mentioned. Actual data represented in EIA report. From the existing project fly ash and slang is generated as solid

has been taken from galpadar farmer house of and report preparation agency has indicated that the econcentration in the Air & Water is on higher side. Though in the report it is mentioned below the limit. Therefore the manipulation has been made in the information and information is wron€l therefore we demand to cancel the report & re organizedl the public hearing. The type of the solid waste generation from the proposed project & method of disposal. From the proposed projerct kindly give the solid waste generation quantity & dir;posal method. Whether captive brick manufacturing plant will be installed for proposed project. Kindly give the recycler name for the disposal of used oil. How many permanent employee are there, from them how many are local. what percentage From the proposed project what would be additionaX employment, from that how many local people will get the employment. What is the percentage. waste Fly ash sold to brick manufacture and cement manufacture and slag is utilized for road construction. Used oil is utilized for lubrication purpose within plant premises. Fly ash is given to brick manufacturer and also captive brick manufacturing plant is installed at Welpsun corp ltd. In welspun power and steel permenantly 500 employees are employed from that 289 are local villagers. ln the welspun group total 10,500 local people got the employment. Due to proposed project direct and indirect 400 people will get the employment in which priority to be given to local villagers as per the merit basis.

If company has 600 acre land<br />

& green belt is on 316 acre<br />

land then why the additional<br />

agriculture land has been<br />

acquired. Ifgreen belt is 375<br />

acre whv it is shown so Lsss.<br />

Whether the Welspun hars<br />

obtained permission from<br />

Guj arat Water Infrastrucl;ure<br />

limited?<br />

Presently what is the water<br />

consumption & What wiltl be<br />

the consumption in proposed<br />

project?<br />

The existing waste water<br />

generation and additional<br />

wastewater generation from<br />

proposed project.<br />

Whether ETP plant is insitalled<br />

to treat the waste water dL what<br />

is the capacity<br />

In proposed project what, will<br />

the capacity of ETP to treat the<br />

waste water<br />

After the treatment where the<br />

treated water will be<br />

discharged by welpsun:<br />

In The EIA Report welpr;un<br />

company has represented that<br />

the main source of Air<br />

<strong>Pollution</strong> is dusting due tto<br />

wind . What about the<br />

emission from chimney and<br />

emission also due to vehicles<br />

transportation. Given retrrort is<br />

wrong and demand for<br />

cancellation the public hearing.<br />

As a part of proposed EIA<br />

report the Air & Water sample<br />

is approximate 28 Acres).<br />

Welspun Power and Steel Ltd. is<br />

having 85 acres of Land.<br />

Yes permission has been<br />

obtained.<br />

Presently water consumption is<br />

1587 m3/Day and proposed<br />

water consumption would be<br />

1461m3/Day<br />

Presently 779 mtTDay<br />

wastewater is genareted which<br />

is utilized for surface cooling in<br />

sponge iron kiln, green belt<br />

development<br />

suppression.<br />

and dust<br />

o ETP plant is not required.<br />

ln the EIA report details of APC<br />

measures and detail of<br />

incremental increase of<br />

different pollutant parameter is<br />

mentioned. Actual data<br />

represented in EIA report.<br />

From the existing project fly ash<br />

and slang is generated as solid