05.06.2013 Views

local agenda 21 local plan for sustainable development of bistriþa ...

local agenda 21 local plan for sustainable development of bistriþa ...

local agenda 21 local plan for sustainable development of bistriþa ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BISTRITA<br />

131<br />

Project duration<br />

o 2005-2010 (feasibility study needs to be<br />

made).<br />

Project no. 16: Expanding the pedestrian area in<br />

the historical centre, the 2nd phase<br />

• The project manager: The Mayoralty <strong>of</strong><br />

Bistrita municipality, The Technical Department –<br />

Director Rus Alexandru<br />

• Departments within the mayoralty responsible<br />

<strong>for</strong> the programme:<br />

- The Technical Department<br />

- The Office <strong>for</strong> Urbanism, Territorial Planning,<br />

Authorisations<br />

- The Technical Service, Investments<br />

- The Economic Department<br />

• Description <strong>of</strong> the specialised technical<br />

assistance from external sources, if needed:<br />

assistance from the Department <strong>of</strong> Culture, Cultural<br />

and National Patrimony<br />

• Social impact and the impact on the<br />

environment: reducing the pollution in the historical<br />

centre, protecting the buildings and the national<br />

cultural patrimony;<br />

• Potential beneficiaries <strong>of</strong> the programme:<br />

tourists, visitors to the historical centre and the<br />

inhabitants <strong>of</strong> Bistrita municipality.<br />

• Location <strong>of</strong> the future investment: Bistrita<br />

municipality, the streets from the historical centre:<br />

Dornei St., Central Square, Nicolae. Titulescu St.,<br />

Gheorghe Şincai St., Dogarilor St., Mihail<br />

Kogălniceanu St., Little Square, Vasile Alecsandri St.,<br />

Zorilor Str. Lupeni St., I.L. Caragiale St. and others;<br />

Financial requirements <strong>of</strong> the programme/project<br />

• Estimated cost: 1,500,000 EURO<br />

• Proposed financing structure, by sources: <strong>local</strong><br />

budget and other sources.<br />

Regulations<br />

• Project/programme implementation in the<br />

macroeconomic context <strong>of</strong> the national economy and<br />

<strong>of</strong> investment projects at <strong>local</strong> level, based on<br />

available resources – arrangement <strong>of</strong> a walking route<br />

along the streets <strong>of</strong> the historical centre;<br />

• Contributions from internal or external sources,<br />

public or private – <strong>local</strong> budget and external funds;<br />

• The regulations that favourably influence the<br />

project: the provisions <strong>of</strong> the Urban Master Plan and<br />

Zonal Urban Plan.<br />

Project duration<br />

o 2006-2009 (feasibility study and the technical<br />

<strong>plan</strong>s need to be developed)<br />

Project no. 17: Rehabilitation <strong>of</strong> the Municipal Park<br />

and its expansion to Codrisor Hill<br />

The Municipal Park stretches over a surface <strong>of</strong> 7 ha,<br />

<strong>of</strong> which 4 ha represent the green areas and 3 ha<br />

paths. The park has 1,487 trees and 352 shrubs.<br />

Because the current surface is too small compared<br />

with the standards set out in the General Urban Plan,<br />

a proposal was made <strong>for</strong> the extension <strong>of</strong> the park to<br />

Codrisor Hill.<br />

- Purpose <strong>of</strong> the project: putting to good use the<br />

recreational, aesthetic and ecological aspects <strong>of</strong> the<br />

park<br />

• Project manager: The Technical Service <strong>for</strong><br />

Investments, Works, Public Acquisitions and Preuniversity<br />

Education<br />

• Departments within the mayoralty responsible<br />

<strong>for</strong> the project : The technical Department, DADP;<br />

• Social impact:<br />

- improving living standards by ensuring the needed<br />

recreational climate<br />

• Potential users/beneficiaries <strong>of</strong> the<br />

programme/project: inhabitants <strong>of</strong> Bistrita municipality;<br />

• Location <strong>of</strong> the future investment: within the<br />

city borders <strong>of</strong> Bistrita municipality<br />

• Method <strong>of</strong> harmonising/integrating the project<br />

with territorial <strong>plan</strong>ning.<br />

Financial requirements <strong>of</strong> the programme/project<br />

Estimated cost: 2,500,000 EURO, <strong>of</strong> which<br />

500,000 EURO, <strong>local</strong> budget;<br />

2,000,000 EURO, EU Funds<br />

Project duration<br />

5 years<br />

Project no. 18: Creating a tourist route <strong>of</strong> the<br />

historical monuments and the appropriate<br />

identification and marking <strong>of</strong> monuments

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!