05.06.2013 Views

International procects for Seismic Risk Reduction in Romania, D ...

International procects for Seismic Risk Reduction in Romania, D ...

International procects for Seismic Risk Reduction in Romania, D ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

COST C26: Urban Habitat Constructions under Catastrophic Events<br />

WG2 Meet<strong>in</strong>g <strong>in</strong> Timisoara, 26-27 October, 2007<br />

<strong>International</strong> Projects <strong>for</strong> <strong>Seismic</strong><br />

<strong>Risk</strong> <strong>Reduction</strong> <strong>in</strong> <strong>Romania</strong><br />

D. Lungu, R. Vacareanu, C. Arion, A. Aldea<br />

Technical University of Civil Eng<strong>in</strong>eer<strong>in</strong>g, Bucharest


1802, 1829 and 1838 earthquakes<br />

Voyage dans la Russie Méridionale et la Crimée par la<br />

Hongrie, la Valachie et la Moldavie<br />

par M. A. de Démidoff<br />

Illustré par Raffet<br />

E. Bourd<strong>in</strong>, éditeur Paris. 1841 & 1854, page 144.<br />

On conserve encore le souvenir du tremblement de terre de 1802, qui<br />

renversa la tour du monastère de Koltza; de celui de 1829, qui ébranla<br />

<strong>for</strong>tement la plupart des édifices de Bucarest. Depuis que ces lignes<br />

sont écrites, une secousse plus violente que toutes celles * dont<br />

le souvenir attriste encore le pays, a pensé engloutir Bucarest.<br />

Tout à coup, le 11-23 janvier 1838, c'était le soir, la ville s'ébranle;<br />

les plus solides monuments chancellent; plusieurs maisons s'écroulent;<br />

toutes son endommagées, et, dans tout ces ravages,<br />

plusieurs hommes perdent la vie.<br />

* 1802; 1829


Nov. 10, 1940 earthquake<br />

M GR = 7.4; M w = 7.7<br />

At least 350 deaths <strong>in</strong> <strong>Romania</strong><br />

Collapse of Carlton Build<strong>in</strong>g <strong>in</strong><br />

Bucharest<br />

- 11 storey, h = 47 m<br />

- RC frame<br />

- 130 death<br />

Important damage <strong>in</strong> Chis<strong>in</strong>au,<br />

R. of Moldova


March 4, 1977 earthquake<br />

M w = 7.5 ; h = 109 km<br />

Killed 1,578 people (1424 <strong>in</strong> Bucharest)<br />

Injured 11,221 people (7598 <strong>in</strong> Bucharest)<br />

• Destroyed or seriously damaged 33,000 hous<strong>in</strong>g units and<br />

caused lesser damage to 182,000 other dwell<strong>in</strong>gs<br />

• Destroyed 11 hospitals and damaged 448 others hospitals, etc.<br />

The World Bank estimation of losses (Report 16.P-2240-RO, 1978):<br />

• Total losses <strong>in</strong> <strong>Romania</strong> : 2.05 billion USD (100%)<br />

Construction losses : 1.42 (70%)<br />

Build<strong>in</strong>g and hous<strong>in</strong>g losses : 1.02 (50%)


1977 earthquake <strong>in</strong> Bucharest


1977 earthquake <strong>in</strong> Bucharest


Elefterie Church, Bucharest


World Bank report<br />

“Preventable Losses: Sav<strong>in</strong>g Lives and Property through Hazard<br />

<strong>Risk</strong> Management”<br />

Strategic Framework <strong>for</strong> reduc<strong>in</strong>g the Social and Economic Impact of<br />

Earthquake, Flood and Landslide Hazards <strong>in</strong> the Europe and Central Asia<br />

Region<br />

Draft, May 2004<br />

• <strong>Romania</strong> is regarded as one the most seismically active countries <strong>in</strong><br />

Europe<br />

• Bucharest is one of the 10 most vulnerable cities <strong>in</strong> the world.


Recommendations <strong>for</strong> <strong>Romania</strong><br />

• Upgrade the legal framework <strong>for</strong> hazard specific management;<br />

• Review the exist<strong>in</strong>g build<strong>in</strong>gs code <strong>for</strong> the retrofitt<strong>in</strong>g of vulnerable<br />

build<strong>in</strong>gs;<br />

• Conduct a comprehensive public awareness campaign <strong>for</strong> the<br />

earthquake risk;<br />

• Invest <strong>in</strong> hazard mitigation activities <strong>in</strong> order to reduce the risks<br />

caused by earthquakes;<br />

• Develop f<strong>in</strong>anc<strong>in</strong>g strategy <strong>for</strong> catastrophic events.


Strengthen<strong>in</strong>g of “seismic risk class 1” build<strong>in</strong>gs<br />

<strong>Seismic</strong> risk class Matrix<br />

Vulnerability<br />

Importance and exposure class<br />

class I II III IV<br />

i 1 1 2 3<br />

ii 1 2 3 3<br />

iii 3<br />

“<strong>Seismic</strong> risk class 1<br />

build<strong>in</strong>gs”<br />

Build<strong>in</strong>g to be immediately retrofitted!


Central Bucharest: 123 build<strong>in</strong>gs built prior to 1945 and<br />

listed as hav<strong>in</strong>g seismic risk class 1 <strong>in</strong> case of a strong<br />

earthquake, Mw≥7.5<br />

#<br />

# #<br />

# #<br />

#<br />

# 30<br />

45 106<br />

83 #<br />

96<br />

42<br />

W<br />

N<br />

E<br />

56 50<br />

# #<br />

#<br />

# #<br />

#<br />

# #<br />

# #<br />

# #<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

# #<br />

# #<br />

# #<br />

#<br />

#<br />

#<br />

#<br />

#<br />

#<br />

# #<br />

#<br />

56<br />

50<br />

#<br />

11 43<br />

90<br />

26<br />

16 #<br />

107 28<br />

#<br />

49 35<br />

6<br />

18<br />

65<br />

47<br />

68<br />

103<br />

92<br />

48<br />

4 # 33<br />

73<br />

20<br />

86 31<br />

93<br />

#<br />

#<br />

58<br />

39<br />

24<br />

94 #<br />

ARON FLORIAN<br />

8<br />

40 95<br />

61<br />

46<br />

1<br />

34<br />

15<br />

52<br />

3<br />

23<br />

51<br />

44 #<br />

22 44<br />

#<br />

# # 70<br />

72<br />

25<br />

100<br />

#<br />

#<br />

#<br />

# 7<br />

69<br />

104<br />

105<br />

# #<br />

# 36<br />

79<br />

#<br />

#<br />

#<br />

55<br />

97 98<br />

#<br />

591<br />

13<br />

64<br />

# #<br />

9<br />

101<br />

#<br />

2 #<br />

#<br />

#<br />

#<br />

19<br />

#<br />

85<br />

#<br />

#<br />

71 88<br />

59 74<br />

ROBESCU F.C.<br />

# # # #<br />

99<br />

38 #<br />

57<br />

Lungu & Arion, 2000<br />

80<br />

#<br />

#<br />

0.5 0<br />

# 60 53<br />

12 # 67<br />

S<br />

76<br />

#<br />

10<br />

#<br />

78<br />

#<br />

109110<br />

# 108 62<br />

#<br />

63 17<br />

14 54 # #<br />

#<br />

#<br />

32<br />

# 87<br />

75<br />

102<br />

#<br />

#<br />

ArcView GIS 3.2 - ESRI Cali<strong>for</strong>nia<br />

0.5 1 Kilometers<br />

RUMOASA<br />

ZAVILLAN LUIGI<br />

RIGO RIGORE -Prof.<br />

LEMNEA<br />

MOXA MIHAIL<br />

PROGRESULUI<br />

DONA NICOLAE - General<br />

SCHIT HITU MAGUREANU<br />

AUR ORA<br />

GRADINA CU CAI<br />

INDEPENDENTEI<br />

IORGA NICOLAE<br />

TOMESCU TOMA - Doctor<br />

PUTIUL -CU-PLOPI<br />

AMMAN<br />

SPIRU HARET<br />

VICTORIEI<br />

KOGALNICEANU MIHAIL<br />

NATIUNILOR UNITE<br />

SFINTUL SAVA<br />

URSEANU VASILE - Amiral<br />

NIC OLAE-IORGA<br />

B ANULUI<br />

IORGA NICOLAE<br />

LUTERANA<br />

DR.V.SIMION<br />

SIPOTUL FINTINILOR<br />

GUTEMBERG<br />

BRE ZOIANU ION<br />

VISARION<br />

CRISTIAN TELL -General<br />

BISERICA AMZEI<br />

BISERICA AMZEI<br />

BREZOIAN IANU ION<br />

MARCOVICI ALEXANDRU - Doctor<br />

RADU-ILIE<br />

VIGILENTEI SAPIENTEI<br />

N<br />

BRUTUS M.I.<br />

ZALOMIT ION<br />

SALIGNY ANGHE L - Ing<strong>in</strong>er<br />

POLITIE<br />

ORIZONTULUI<br />

ADEREA BASTILIEI<br />

PIATA-AMZEI<br />

CRETULE SCU NICOLAE<br />

VRACA GEORGE<br />

MIHAI-VODA<br />

PERI<br />

MENDELEEV D. I.<br />

GIURESCU DIMITRIE - Maior<br />

ENESCU GEORGE<br />

EPISCOPIEI<br />

GOLESCU NICOLAE<br />

C-TIN-EXARCU<br />

FRANKLIN BENJANIM<br />

MILLE CONSTANTIN<br />

DOMNITA ANASTASIA<br />

ILFOV<br />

EFORIEI<br />

MIHAI VODA<br />

RIUREANU - Doctor<br />

BELDIMAN ALEXA NDRU<br />

DOROBANTI<br />

BROSTENI<br />

EMINESCU MIHAI<br />

DA<br />

SLAVESTI<br />

BALABAN EMIL - Ing<strong>in</strong>er<br />

POLONA<br />

FILIPIDE ALEXANDRU<br />

N ION-Erou<br />

DROBETA<br />

DACIA ACIA<br />

LEONIDA<br />

RUSSO ALECU<br />

COMANITA<br />

URALILUMINEI<br />

MAGHERU GH EORGHE - Gen.<br />

ROSETTI C.A.<br />

B OTEANU<br />

ARHITECTUR<br />

MECHELET<br />

DOBRESCU ION<br />

URII<br />

VICTORIA<br />

COMEDIA<br />

MAJESTIC<br />

BIJUTERIEI<br />

STAVROPOLEOS<br />

POSTEI<br />

FILITTI C. ION<br />

TI<br />

PICTOR-VERONA<br />

G-RAL-GH.MAGHERU<br />

BRIE<br />

13-DECEMBRIE<br />

CARADA EU GENIU<br />

A CADEMIEI<br />

MANDINESTI<br />

P ITAR M OS<br />

S ELARI<br />

CONTA VASILE<br />

SMIRDAN<br />

GRIGORESCU<br />

LUPU DIONISIE<br />

FILIPESCU NICOLAE<br />

BALCESCU NICOLAE<br />

COVACI<br />

ARGHEZI TUDOR<br />

SAHIA ALE X.(CALDERON JEAN L.)<br />

ICOANEI<br />

XENOPO L ALEXANDRU<br />

SCOALEI<br />

BLANDUZIEI<br />

DOAMNEI<br />

BLANARI<br />

BATISTEI<br />

BRATIANU I.C.<br />

DUMBRAVA ROSIE<br />

ROSETTI C.A.<br />

tor<br />

IOANID GHE.-pictor<br />

SLANIC<br />

BARAT<br />

SFINTUL SPIRIDON<br />

CARAGIALE ION LUCA<br />

ITALIANA<br />

JEAN L.)<br />

COLTEI<br />

BOTEZ CORNELIU<br />

S CHITU DARVARI<br />

BACALOGU EMANOIL-doctor or<br />

DIANEI<br />

ORBESCU DIMITRIE<br />

DONICI ALE XANDRU<br />

ROSETTI MARIA<br />

ITALIANA<br />

SPER PERANTEI<br />

CAIMATEI<br />

SAGETII I<br />

ICOANEI<br />

MOV ILA ION<br />

XANDRA<br />

DONICI ALEXANDRU<br />

LASC AR VASILE(FOSTA GALATI)<br />

L UCA STROICI - L ogofat<br />

MATEI MILLO ARMENEASCA<br />

LIPSCANI<br />

QUINET EDGAR<br />

LIPSCANI<br />

30 DECEM<br />

ION NIS TOR<br />

GHICA ION<br />

BACANI<br />

UNIVERSITATII<br />

LIPSCANI<br />

GABROVENI<br />

REPUBLICII<br />

MAVROGHENI NICOLAE<br />

PATRASCU VODA<br />

BANIEI<br />

SAHIA ALEX.(CALDERON JE<br />

LIPSCANI<br />

ROSETTI C.A .<br />

TREI SCAUNE<br />

CAVAFII VECHI<br />

BAIA DE FIE R<br />

SF. VINERI<br />

SFINTILOR<br />

H.BOTEV<br />

PALEOLOGU<br />

STELEA SPATARUL<br />

SF.MINA<br />

AA RCULUI R<br />

POPA RUSU<br />

O COLULUI<br />

SEVCENCO TARAS ARAS<br />

LOG.STROICI<br />

SERGHIESCU MARIN<br />

CERNICA<br />

ZBORULUI<br />

CALARASI<br />

VERMONT - Pictor<br />

CULMEA VECHE<br />

MENEASCA<br />

PASULUI<br />

RASURI<br />

PACIUREA DIMITRIE<br />

ROSETTI MARIA<br />

ARME<br />

CALOTESTI<br />

VIITORULUI<br />

LATINA<br />

LICURG<br />

NEGUSTORI<br />

PALEOLOGU<br />

COLUMBELOR<br />

TOAMNEI<br />

FRANZELARILOR<br />

LUCHIAN STEFAN - Pictor<br />

MINTULEASA<br />

IONESCU CRISTEA<br />

URSU ION-Prof.<br />

VERII<br />

POPA SOARE<br />

UDRISTE LOGOFAT<br />

SSIMA - Profesor<br />

ARMONIEI<br />

SALCIMILOR<br />

S ILVESTRU<br />

SPATARULUI<br />

CERCULUI<br />

CORBENI<br />

DOMNESTI<br />

ROMANO - Pictor<br />

ROMULUS<br />

RAMULUS<br />

TOPLICENI<br />

LU LUNII<br />

TIBANA<br />

MONUME NTULUI LUI<br />

MALNAS<br />

POPA PETRE<br />

ARDELE NI<br />

PRECUPETII VECHI<br />

SUVENIR<br />

OLTARULUI<br />

VENEREI<br />

RACOVITA DIMITRIE<br />

M INTULESA<br />

PRISTOLULUI<br />

IULIU<br />

REMUS<br />

PREPELITEI<br />

IPATESCU GRIGORE - General<br />

S FINTUL STEFAN<br />

BOBEICA<br />

VALORII<br />

COBILITEI<br />

VIR VIROAGEI<br />

BASARAB MATEI<br />

ACELARI<br />

IERNII<br />

D RAGOS VODA<br />

ARGES<br />

ZECE MESE<br />

ENERGIEI<br />

RUMEOARA<br />

REPUBLICII<br />

AVRAM IAN ANCU<br />

SECUREI<br />

PREOT-VASILE-LUCACI<br />

LABIRINT<br />

General<br />

MIHAI BRAVU<br />

PESTERII<br />

CAV NIC<br />

RADU - Episcopul<br />

ONCIUL DIMITRIE<br />

TRAIAN<br />

OLARI<br />

PLANTELOR<br />

MIHAILEANU STEFAN<br />

ZEFIRULUI<br />

BURGH EL EA - Docto r<br />

FETITELOR<br />

CONSTA NTINESCU MITRITA - Pr of.<br />

MOSILOR R<br />

VASELOR<br />

S TUPINEI<br />

IANCU - Capitanul<br />

IANCU CAVALE<br />

PO


Balcescu 25 (Wilson) Calea Victoriei 124 Calea Victoriei 25<br />

Calea Victoriei 95 Balcescu 32-34 Balcescu 30<br />

Balcescu 7 Calea Victoriei 33-35<br />

Total: Total: 26 26 26 tall<br />

tall<br />

re<strong>in</strong><strong>for</strong>ced re<strong>in</strong><strong>for</strong>ced concrete<br />

concrete<br />

build<strong>in</strong>gs<br />

build<strong>in</strong>gs<br />

<strong>Seismic</strong> risk<br />

class 1 build<strong>in</strong>gs<br />

on the most<br />

important two<br />

boulevards <strong>in</strong><br />

central<br />

Bucharest


Strengthen<strong>in</strong>g of 9 storey residential build<strong>in</strong>g<br />

<strong>in</strong> central Bucharest<br />

March 2007, after ≈≈≈≈ ≈≈≈≈ 10yr of actions:<br />

10 build<strong>in</strong>gs are fully retrofitted<br />

11 build<strong>in</strong>gs are under retrofitt<strong>in</strong>g<br />

42 build<strong>in</strong>gs <strong>in</strong> retrofitt<strong>in</strong>g design<br />

stage or under contract<strong>in</strong>g the design


Fragile tall RC<br />

build<strong>in</strong>gs with soft<br />

and weak<br />

groundfloor, built<br />

<strong>in</strong> Bucharest,<br />

1960-1977


Fragile 7-story RC<br />

frame build<strong>in</strong>g with<br />

soft and weak<br />

groundfloor, built<br />

<strong>in</strong> ’60s, Stefan cel<br />

Mare Boulevard<br />

Fragile 7-story RC frame build<strong>in</strong>g<br />

with soft and weak groundfloor,<br />

after 1977 seismic event, Stefan<br />

cel Mare Boulevard


Bucharest: 26 Cultural Heritage Palaces<br />

(National Institute <strong>for</strong> Historical Monuments, List 2004)<br />

<strong>Seismic</strong> vulnerability/risk class 1 palaces:<br />

•Multistory steel structures: - M<strong>in</strong>istry of Transport<br />

(to be retrofitted)<br />

- Telephone Palace<br />

(retrofitted)<br />

Multistory re<strong>in</strong><strong>for</strong>ced concrete<br />

structures: - <strong>Romania</strong>n Government Palace<br />

(to be retrofitted)<br />

- City Hall, Sector 1<br />

(to be retrofitted)<br />

Masonry and re<strong>in</strong><strong>for</strong>ced<br />

Masonry and re<strong>in</strong><strong>for</strong>ced<br />

concrete build<strong>in</strong>gs: - Palace of Justice<br />

(retrofitted)<br />

- Royal Palace i.e. The National<br />

Museum of Art of <strong>Romania</strong><br />

(partially retrofitted, to be retrofitted)


<strong>International</strong> projects <strong>for</strong> seismic risk mitigation <strong>in</strong><br />

<strong>Romania</strong><br />

• JICA Project - <strong>Reduction</strong> of seismic risk <strong>for</strong> build<strong>in</strong>gs and structures<br />

<strong>in</strong> <strong>Romania</strong><br />

• CRC 461 Project – Vrancea Earthquakes. Tectonics, Hazard and <strong>Risk</strong><br />

Mitigation<br />

• RISK-UE - An advanced approach to earthquake risk scenarios with<br />

applications to different European town<br />

• PROHITECH - Earthquake Protection of Historical Build<strong>in</strong>gs by<br />

Reversible Mixed Technologies<br />

• World Bank Hazard and risk mitigation <strong>in</strong> <strong>Romania</strong><br />

- Component B: Earthquake <strong>Risk</strong> <strong>Reduction</strong><br />

• NATO Project- Harmonization of <strong>Seismic</strong> Hazard <strong>Risk</strong> and<br />

<strong>Reduction</strong> <strong>in</strong> Countries Influenced by Vrancea Earthquakes


JICA PROJECT - <strong>Reduction</strong> of seismic risk <strong>for</strong> build<strong>in</strong>gs<br />

and structures <strong>in</strong> <strong>Romania</strong><br />

• Project signed <strong>in</strong> 2002, when 100 years of diplomatic relations between<br />

Japan and <strong>Romania</strong> were celebrated<br />

Partnership of 3 <strong>in</strong>stitutions:<br />

NCSRR, National Center <strong>for</strong> <strong>Seismic</strong> <strong>Risk</strong> <strong>Reduction</strong> –<br />

implement<strong>in</strong>g agency<br />

UTCB, Technical University of Civil Eng<strong>in</strong>eer<strong>in</strong>g Bucharest<br />

INCERC, National Institute <strong>for</strong> Build<strong>in</strong>g Research, Bucharest<br />

under the authority of:<br />

MDLPL, M<strong>in</strong>istry of Development, Public Works and Hous<strong>in</strong>g<br />

• Project duration: 5.5 yr


• Equipment cost 3 mil. USD:<br />

Total cost of the project<br />

7 mil. USD – Donation from JICA<br />

- Soil test<strong>in</strong>g laboratory<br />

- Structure test<strong>in</strong>g laboratory<br />

- <strong>Seismic</strong> <strong>in</strong>strumentation network <strong>in</strong> Bucharest and <strong>Romania</strong><br />

(free field, borehole, build<strong>in</strong>gs)<br />

• 29 <strong>Romania</strong>n young students/eng<strong>in</strong>eer tra<strong>in</strong>ed <strong>in</strong> Japan<br />

• 46 Japanese short term and long term experts <strong>in</strong> <strong>Romania</strong>


Structural test<strong>in</strong>g equipment - Reaction frame<br />

Maximum weight of tested specimens - 7t<br />

Maximum dimensions of the tested specimens - 2.5m by 3 m<br />

Reaction frame 9.7m x 7.6m


JICA Project – structural test<strong>in</strong>g


JICA Project – structural test<strong>in</strong>g<br />

Specimen<br />

σ0 Armare<br />

“gr<strong>in</strong>da”<br />

Armare<br />

“stalp”<br />

Armare<br />

<strong>in</strong>ima<br />

Mod de<br />

cedare<br />

W1 0.13 da sporita -<br />

Forta<br />

taietoare<br />

W2 0.26 da sporita -<br />

Forta<br />

taietoare<br />

W3 0.13 - sporita -<br />

Forta<br />

taietoare<br />

W4 0.13 da normala - Incovoiere<br />

W5 0.13 da normala da Incovoiere<br />

W1<br />

Force ( tonf)<br />

Force - Displacement<br />

40<br />

30<br />

20<br />

10<br />

0<br />

-12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12<br />

-10<br />

-20<br />

-30<br />

-40<br />

Displacement (mm)


JICA Project – structural test<strong>in</strong>g<br />

Z2 – σ 0=0.6MPa Z6 – σ 0=0.6MPa


JICA Project – Retrofitt<strong>in</strong>g of build<strong>in</strong>gs<br />

www.earth.google.com


JICA Project – Retrofitt<strong>in</strong>g of build<strong>in</strong>gs<br />

Damper layout <strong>in</strong> the groundfloor (solid l<strong>in</strong>es)


JICA Project – Retrofitt<strong>in</strong>g of build<strong>in</strong>gs<br />

Figure 10. Damper connection detail


Equipments <strong>for</strong> soil <strong>in</strong>vestigation<br />

Triaxial test<strong>in</strong>g equipment


G/G max<br />

Hysteretic damp<strong>in</strong>g ratio ratio h(%)<br />

1<br />

0.8<br />

0.6<br />

0.4<br />

0.2<br />

0<br />

35<br />

30<br />

25<br />

20<br />

15<br />

10<br />

Vutecic G/Gmax IP=0<br />

Vutecic G/Gmax IP=100<br />

Vutecic G/Gmax IP=200<br />

Gravel Seed G/Gmax<br />

Sun G/Gmax PI=80+<br />

Sand Seed lower bound G/Gmax<br />

Sand Seed average G/Gmax<br />

Clay Layer 1<br />

Clay Layer 2<br />

Clay Layer 3<br />

Clay Layer 4<br />

Gravel Seed G/Gmax<br />

Vutecic IP=200 G/Gm ax<br />

0.0001 0.001 0.01 0.1 1 10<br />

S<strong>in</strong>gle amplitude shear stra<strong>in</strong>, γ (%)<br />

5<br />

Vutecic h (%) IP=0<br />

Vutecic h (%) IP=100<br />

Vutecic h (%) IP=200<br />

Sun h(%) lower bound<br />

Sun h(%) average<br />

Sun h(%) upper bound<br />

Clay Layer 1<br />

Clay Layer 2<br />

Clay Layer 3<br />

Clay Layer 4<br />

Sun upper bound h(%) model<br />

0<br />

0.0001 0.001 0.01 0.1 1 10<br />

S<strong>in</strong>gle amplitude shear stra<strong>in</strong>, γ (%)<br />

Vutecic IP=200 h(%)<br />

National Center <strong>for</strong><br />

<strong>Seismic</strong> <strong>Risk</strong> <strong>Reduction</strong><br />

shear modulus ratio G/G O<br />

versus<br />

shear stra<strong>in</strong><br />

Test results<br />

and<br />

comparison<br />

with<br />

analytical<br />

model<br />

curves<br />

stra<strong>in</strong> dependent<br />

damp<strong>in</strong>g


PS logg<strong>in</strong>g, downhole method results<br />

Adancime<br />

<strong>for</strong>aj, m Site V s,30 T g V s,51 T g<br />

140 INCERC 271 0.449 301 0.677<br />

69 SPITAL 246 0.495 279 0.731<br />

110 Victoriei 285 0.427 309 0.660<br />

78 UTCB 310 0.393 325 0.627<br />

66 INSTALATII 289 0.421 317 0.643<br />

68 PRC 294 0.414 308 0.662<br />

51 Primarie 224 0.544 264 0.772


JICA Project – seismic network<br />

ETNA-K<strong>in</strong>emetrics and Geosig accelerometers (3<br />

channels) - placed <strong>in</strong> free field outside Bucharest<br />

ALTUS ALTUS K2-K<strong>in</strong>emetrics and Geosig accelerometers (12<br />

channels) – <strong>in</strong>stalled <strong>in</strong> boreholes and build<strong>in</strong>gs <strong>in</strong>side<br />

Bucharest<br />

Free field<br />

outside Bucharest<br />

ETNA & Geo<br />

8 sites<br />

6 - JICA<br />

2 - MTCT<br />

<strong>Seismic</strong> network<br />

Borehole<br />

Bucharest<br />

K2&Geo<br />

8 sites<br />

7 - JICA<br />

1 - MTCT<br />

Build<strong>in</strong>g<br />

Bucharest<br />

K2&Geo<br />

5 sites<br />

4 - JICA<br />

1 - MTCT


Bldg.1<br />

10th&11th<br />

Bldg.2<br />

5th Free field<br />

top<br />

B1<br />

5th<br />

B1<br />

Typical RC<br />

frame structure<br />

residential<br />

Build<strong>in</strong>gs<br />

1 - after 1977 (11 storeys)<br />

2 - be<strong>for</strong>e 1977 (7 storeys)


National <strong>Romania</strong>n Television.<br />

RC frame structure built be<strong>for</strong>e<br />

1977 earthquake<br />

(14 storeys)<br />

B1<br />

14th &15th


Altus K2<br />

accelerometer<br />

Bucharest - Location of borehole <strong>in</strong>strumented sites<br />

Borehole seismic <strong>in</strong>strumentation<br />

Borehole sensor<br />

Shallow<br />

borehole<br />

24÷30m<br />

Borehole sensor<br />

Surface and<br />

borehole cables<br />

Deep<br />

borehole<br />

60÷153m<br />

Free field


CRC 461, Collaborative Research Center - Strong<br />

Earthquakes: A Challenge <strong>for</strong> Geosciences and Civil<br />

Eng<strong>in</strong>eer<strong>in</strong>g<br />

University of Karlsruhe, Germany<br />

Start<strong>in</strong>g Date: 1996<br />

End<strong>in</strong>g Date: 2007


Future<br />

Future<br />

Extension Extension of of of seismic seismic cooperation<br />

cooperation<br />

?


Participants<br />

• Collaborative Research Center (CRC) 461: “Strong Earthquakes:<br />

A Challenge <strong>for</strong> Geosciences and Civil Eng<strong>in</strong>eer<strong>in</strong>g”, University of<br />

Karlsruhe, Germany<br />

and<br />

• <strong>Romania</strong>n Group <strong>for</strong> Strong Vrancea Earthquakes (RGVE)<br />

- INFP, National Institute <strong>for</strong> Earth Physics<br />

- UTCB, Technical University of Civil Eng<strong>in</strong>eer<strong>in</strong>g<br />

- INCERC, National Institute <strong>for</strong> Build<strong>in</strong>g Research<br />

- University of Bucharest, Faculty of Geology and Geophysics<br />

- GEOTEC, Institute <strong>for</strong> Geotechnical and Geophysical Studies<br />

and others


A l: Deep <strong>Seismic</strong> Sound<strong>in</strong>g of the Vrancea Zone<br />

A 6: Stress Field and Geodynamics<br />

Project plann<strong>in</strong>g<br />

A 7: Strong Ground Motion Assessment<br />

B 1: Three-Dimensional Plate K<strong>in</strong>ematics <strong>in</strong> <strong>Romania</strong><br />

B 3: Seismogenic Potential of the Vrancea Subduction Zone - Quantification of<br />

Source- and Site-Effects from Strong Earthquakes<br />

B 4: Non-L<strong>in</strong>ear Wave Phenomena <strong>in</strong> F<strong>in</strong>e and Soft Soils<br />

B 6: Geotechnical and <strong>Seismic</strong> Microzon<strong>in</strong>g of Bucharest<br />

B 7: Hydrogeology and Site Effects by Earthquakes <strong>in</strong> Bucharest<br />

C 2: Methods <strong>for</strong> the Retrofitt<strong>in</strong>g of Damaged Build<strong>in</strong>gs<br />

C 3: Disaster Management - Models and Simulation<br />

C 5: Image Analysis <strong>in</strong> Geosciences and Civil Eng<strong>in</strong>eer<strong>in</strong>g<br />

C 6: Knowledge Representation <strong>for</strong> Disasters with a Technical In<strong>for</strong>mation System<br />

C 7: Novel Rescue and Restoration Technologies<br />

C 9: Vulnerability Analysis of Exist<strong>in</strong>g Structures<br />

Z 1: Central Geographical In<strong>for</strong>mation System (GIS)<br />

Z 2: SFB Management


Test build<strong>in</strong>g at INCERC site and<br />

ALGA rubber bear<strong>in</strong>gs HDRB 250x164.5


First <strong>International</strong> Workshop on<br />

Vrancea Earthquakes,<br />

Bucharest, Nov. 1-4, 1997


RISK-UE - An advanced approach to earthquake risk<br />

scenarios with applications to different European towns<br />

Contract n° EVK4-CT-2000-00014 with European Commission,<br />

Research Directorate General<br />

Amount: 2 477 643 €<br />

Fund<strong>in</strong>g: EC : 66 %<br />

participants: 34 %<br />

Start<strong>in</strong>g Date: 2001<br />

End<strong>in</strong>g Date: 2004


RISK U.E. Project<br />

An advanced approach to earthquake<br />

risk scenarios with applications to<br />

different European towns


Project plann<strong>in</strong>g<br />

WP 1: Evaluation of European dist<strong>in</strong>ctive features<br />

WP 2: Earthquake hazard assessment<br />

WP 3: Urban system analysis<br />

WP 4: Vulnerability assessment of current build<strong>in</strong>gs<br />

WP 5: Vulnerability assessment of historical and monumental build<strong>in</strong>gs<br />

WP 6: Vulnerability assessment of lifel<strong>in</strong>es and essential structures<br />

WP 7: Earthquake risk scenarios


Participants


Objective 2 - Europe <strong>in</strong>ventory database and typology<br />

Classification of build<strong>in</strong>gs occupancy<br />

Code Occupancy category<br />

Importance & exposure<br />

category<br />

1 2 3<br />

B GENERAL BUILDING STOCK<br />

B1<br />

Residential<br />

1.1<br />

S<strong>in</strong>gle family dwell<strong>in</strong>g (house)<br />

x<br />

1.2<br />

Multi family dwell<strong>in</strong>g (apartment bldg.)<br />

1.3<br />

Low-rise (1-2)<br />

1.4<br />

Mid-rise (3-7)<br />

1.5<br />

High-rise (8+)<br />

x<br />

1.6<br />

Institutional dormitory<br />

1)<br />

x 1)<br />

x<br />

x<br />

x<br />

x<br />

x<br />

B2<br />

Commercial<br />

2.1<br />

Supermarkets, Malls<br />

x<br />

2.2<br />

Offices<br />

2.3<br />

Services<br />

2.4<br />

Hotels, Motels<br />

2.5<br />

Restaurants, Bars<br />

2.6<br />

Park<strong>in</strong>g<br />

2.7<br />

Warehouse<br />

2)<br />

x 2)<br />

x 2)<br />

x<br />

x<br />

x<br />

x<br />

x<br />

x<br />

2.7 Warehouse x<br />

B3<br />

Cultural<br />

3.1<br />

Museums<br />

x<br />

3.2<br />

Theatres, C<strong>in</strong>emas<br />

3.3<br />

Public event build<strong>in</strong>gs<br />

3.4<br />

Stadiums<br />

3)<br />

x 2)<br />

x 2)<br />

x 2)<br />

x<br />

x<br />

x<br />

x<br />

1) Build<strong>in</strong>gs with capacity greater than 150 people<br />

2) Build<strong>in</strong>gs with capacity greater than 300 people or where more than 300 people<br />

congregate <strong>in</strong> one area


Build<strong>in</strong>g typology matrix, BTM<br />

Label Build<strong>in</strong>g type description Height description Code level *<br />

RC Re<strong>in</strong><strong>for</strong>ced concrete structures<br />

RC1 Concrete moment frames Low-rise<br />

Mid-rise<br />

High-rise<br />

RC2 Concrete shear walls Low-rise<br />

Mid-rise<br />

High-rise<br />

RC3<br />

3.1<br />

3.2<br />

Concrete frames with unre<strong>in</strong><strong>for</strong>ced masonry<br />

<strong>in</strong>fill walls<br />

Regularly <strong>in</strong>filled frames<br />

Irregularly frames (i.e., irregular structural<br />

system, irregular <strong>in</strong>fills, soft/weak story)<br />

Name No. of<br />

stories<br />

Low-rise<br />

Mid-rise<br />

High-rise<br />

Low-rise<br />

Mid-rise<br />

High-rise<br />

RC4 RC Dual systems (RC frames and walls) Low-rise<br />

Mid-rise<br />

High-rise<br />

RC5 Precast Concrete Tilt-Up Walls Low-rise<br />

Mid-rise<br />

High-rise<br />

RC6 Precast Concrete Frames with Concrete<br />

shear walls<br />

Low-rise<br />

Mid-rise<br />

High-rise<br />

1 - 3<br />

4 - 7<br />

8+<br />

1 - 3<br />

4 - 7<br />

8+<br />

1 - 3<br />

4 - 7<br />

8+<br />

1 - 3<br />

4 - 7<br />

8+<br />

1 - 3<br />

4 - 7<br />

8+<br />

1 - 3<br />

4 - 7<br />

8+<br />

1 - 3<br />

4 - 7<br />

8+<br />

Height h,<br />

m<br />

h ≤ 9<br />

9 < h ≤ 21<br />

h > 21<br />

h ≤ 9<br />

9 < h ≤ 21<br />

h > 21<br />

h ≤ 9<br />

9 < h ≤ 21<br />

h > 21<br />

h ≤ 9<br />

9 < h ≤ 21<br />

h > 21<br />

h ≤ 9<br />

9 < h ≤ 21<br />

h > 21<br />

h ≤ 9<br />

9 < h ≤ 21<br />

h > 21<br />

h ≤ 9<br />

9 < h ≤ 21<br />

h > 21<br />

N L M H<br />

*Code level N - no code;<br />

L - low-code (designed with unique arbitrary base shear seismic coefficient);<br />

M - moderate-code;<br />

H - high-code (code comparable with Eurocode 8)


Vulnerability and typology of European build<strong>in</strong>gs stock<br />

Build<strong>in</strong>g stock age <strong>in</strong> the 7 towns versus<br />

<strong>Seismic</strong> codes <strong>in</strong>ter-benchmark periods<br />

Town<br />

<strong>Seismic</strong> codes <strong>in</strong>ter-benchmark periods<br />

Pre-code Low-code M oderate code<br />

Barcelona 79% 21% --<br />

Bitola 48% 29% 23%<br />

Bucharest 30% 30% 40%<br />

Catania 92% - 8%<br />

Nice 75% 25%<br />

Sofia Data not available<br />

Thessaloniki 20% 50% 30%


PROHITECH - Earthquake Protection of Historical<br />

Build<strong>in</strong>gs by Reversible Mixed Technologies<br />

Contract n° INCO – CT-2004 - 509119 with European Commission,<br />

Research Directorate General<br />

Amount: 2 400 000€<br />

Fund<strong>in</strong>g: EC: 88 %,<br />

participants : 12 %<br />

Start<strong>in</strong>g Date: 2004<br />

End<strong>in</strong>g Date: 2007


Project plann<strong>in</strong>g<br />

WP 1: Overview of exist<strong>in</strong>g techniques<br />

WP 2: Damage assessment<br />

WP 3: <strong>Risk</strong> Analysis<br />

WP 4: Intervention strategies<br />

WP 5: Innovative materials and techniques<br />

WP 6: Reversible mixed technologies<br />

WP 7: Experimental analysis<br />

WP 8: Numerical analyses<br />

WP 9: Calculation models<br />

WP 10: Validation of <strong>in</strong>novative solutions and procedures<br />

WP 11: Study cases<br />

WP 12: Design guidel<strong>in</strong>es


Participants


Component A:<br />

World Bank project <strong>in</strong> <strong>Romania</strong><br />

Strengthen<strong>in</strong>g of disaster management capacity<br />

Component B:<br />

Earthquake <strong>Risk</strong> <strong>Reduction</strong> - 71.2 million US$<br />

Subcomponents:<br />

•Strengthen<strong>in</strong>g of high priority build<strong>in</strong>gs and lifel<strong>in</strong>es<br />

•Design & supervision<br />

•Build<strong>in</strong>g code review and study of code en<strong>for</strong>cement<br />

•Professional tra<strong>in</strong><strong>in</strong>g <strong>in</strong> cost effective retrofitt<strong>in</strong>g<br />

Components C, D&E: Flood, Pollution & Project Management


Implementation unit <strong>for</strong> Component B:<br />

MDLPL, M<strong>in</strong>istry of Development, Public Works and Hous<strong>in</strong>g<br />

<strong>Romania</strong>n Government has been approved the follow<strong>in</strong>g list of<br />

build<strong>in</strong>gs to be retrofitted on April 7, 2004<br />

Type of build<strong>in</strong>gs<br />

In<br />

Bucharest<br />

In seismic counties<br />

of <strong>Romania</strong><br />

Total<br />

Emergency bldg 12 18 30<br />

Hospitals bldg 13 9 22<br />

Educational bldg 6 6 12<br />

Important public bldg 6 - 6<br />

Essential facilities - 14 14<br />

Total 37 47 84<br />

*Important public build<strong>in</strong>gs are historical heritage build<strong>in</strong>gs


Public Diplomacy Division<br />

Collaborative Programmes Section<br />

North Atlantic Treaty Organization<br />

Project SfP 98047<br />

NATO PROJECT - Harmonization of <strong>Seismic</strong> Hazard<br />

<strong>Risk</strong> and <strong>Reduction</strong> <strong>in</strong> Countries Influenced by<br />

Vrancea Earthquakes<br />

A Science <strong>for</strong> Peace Project<br />

Amount: 250 000 €<br />

Start<strong>in</strong>g Date: 2005<br />

Participants<br />

End<strong>in</strong>g Date: 2008<br />

National Institute <strong>for</strong> Build<strong>in</strong>g Research INCERC, Bucharest, <strong>Romania</strong><br />

Moldavian Academy of Sciences, Institute <strong>for</strong> Geophysics and Geology, Kish<strong>in</strong>ev, Republic<br />

of Moldova<br />

Central Laboratory <strong>for</strong> <strong>Seismic</strong> Mechanics and Earthquake Eng<strong>in</strong>eer<strong>in</strong>g, Sofia, Bulgaria<br />

Middle East Technical University, Department of Civil Eng<strong>in</strong>eer<strong>in</strong>g, Ankara, Turkey


Determ<strong>in</strong>istic seismic zonation maps <strong>for</strong> countries affected<br />

by Vrancea earthquakes<br />

MSK Intensity<br />

ROMANIA<br />

P100-92&<br />

SR 11100/1-93<br />

PGA/g<br />

Rep. of MOLDOVA,<br />

UKRAINE<br />

SNIP II-7-81<br />

BULGARIA<br />

1987 code<br />

IX 0.32 0.40 0.27<br />

VIII<br />

0.25<br />

0.20<br />

0.20 0.15<br />

VII 0.16 0.10 0.10<br />

V<br />

0.12<br />

0.08<br />

- 0.05<br />

MRI - mean recurrence<br />

<strong>in</strong>terval of earthquake<br />

magnitude is:<br />

<strong>Romania</strong>: 50 yr, 1992<br />

100 yr, 2006<br />

Republic<br />

of Moldova: 50 yr<br />

Bulgaria: 1000 yr<br />

Lungu, Zaicenco, 1999


<strong>Romania</strong> at WCDR, Kobe, Jan. 2005:<br />

Mission organized by MTCT, M<strong>in</strong>istry of Transports, Constructions and Tourism<br />

World Conference on Disaster <strong>Reduction</strong><br />

18 to 22 Jan. 2005 Kobe, Hyogo, Japan<br />

18 Jan. 2005<br />

Thematic Panel Cluster 4, Reduc<strong>in</strong>g the underly<strong>in</strong>g risk factors<br />

Organized by:<br />

- United Nations Environment Programme (UNEP)<br />

- World Health Organization (WHO)<br />

- United Nations Centre <strong>for</strong> Regional Development (UNCRD)<br />

Chair of the Cluster 4 of WCDR:<br />

Mr. Laszlo Borbely, M<strong>in</strong>ister delegate <strong>for</strong> Public Works and Urban Plann<strong>in</strong>g,<br />

M<strong>in</strong>istry of Transports, Constructions and Tourism<br />

19 Jan. 2005<br />

Cluster Session 4.6, Policies <strong>for</strong> safer build<strong>in</strong>g/Hous<strong>in</strong>g<br />

Organized by:<br />

- Government of Japan, M<strong>in</strong>istry of Land, Infrastructure and Transports and<br />

- United Nations Centre <strong>for</strong> Regional Development (UNCRD )<br />

Presentation: <strong>Seismic</strong> risk mitigation <strong>in</strong> <strong>Romania</strong> (D. Lungu)<br />

21 Jan. 2005<br />

Public Forum: Build<strong>in</strong>g a Strong Country Aga<strong>in</strong>st Disasters. Achievements and<br />

Challenges of JICA’s Cooperation<br />

Presentation: Ef<strong>for</strong>ts toward seismic risk reduction <strong>for</strong> build<strong>in</strong>gs and JICA Project <strong>in</strong> <strong>Romania</strong> (R. Vacareanu)<br />

22 Jan. 2005<br />

Statement of <strong>Romania</strong>n Delegation on Behalf of Eastern European Group of Countries (D. Lungu)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!