05.06.2013 Views

\fdO'^ - Old Forge Coal Mines

\fdO'^ - Old Forge Coal Mines

\fdO'^ - Old Forge Coal Mines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RAILROAD CONSTRUCTION. 289<br />

yards. As cart and driver cost $1.40 per day, the cost of<br />

hauling is r-~-r^ =7.7 cents per cubic yard. Foreman and<br />

lo. lo<br />

water-carrier together cost $3.25. The gang contains<br />

12 carts, which together carry 18.18x12 = 218.2 cubic<br />

yards.<br />

$3 ' 25<br />

218. 2<br />

= 1.49 cents per cubic yard for water-carrier<br />

and superintendence. As loosening soil costs 2 cents per<br />

cubic yard, dumping and spreading 1 cent per cubic yard,<br />

and wear of carts and tools | cent per cubic yard, we have<br />

the total cost per cubic yard as follows:<br />

Loosening soil 2.00 cents per cubic yard.<br />

Shoveling into carts 4.28 cents per cubic yard.<br />

Hauling<br />

and water-car-<br />

7.70 cents per cubic yard.<br />

Superintendence<br />

rier<br />

Wear and tear of carts and tools,<br />

1.49 cents per cubic yard.<br />

0.50 cents per cubic yard.<br />

Dumping and spreading<br />

1.00 cents per cubic yard.<br />

Cost for delivering on the dump, 16.97 cents per cubic yard.<br />

(868) See Art. 1499.<br />

(869)<br />

(870)<br />

(871)<br />

See Art. 1499.<br />

See Art. 1500.<br />

See Art. 1500.<br />

(872) In carrying the steam a long distance through<br />

iron pipes its pressure is greatly reduced by condensation,<br />

whereas compressed air may be carried a great distance<br />

without suffering any loss in pressure excepting that due tc<br />

friction and leakage.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!