04.06.2013 Views

A case study of Toyota in India to build An industry ready ...

A case study of Toyota in India to build An industry ready ...

A case study of Toyota in India to build An industry ready ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A <strong>case</strong> <strong>study</strong> <strong>of</strong> <strong>Toyota</strong> <strong>in</strong> <strong>India</strong><br />

<strong>to</strong> <strong>build</strong><br />

<strong>An</strong> <strong>in</strong>dustry <strong>ready</strong> Technician<br />

T.Somanath, Pr<strong>in</strong>cipal, Tel: 9740900172<br />

A series <strong>of</strong> slides present here is an attempt <strong>to</strong> expla<strong>in</strong><br />

why vocational tra<strong>in</strong><strong>in</strong>g is important for any country and<br />

how we can develop an <strong>in</strong>dustry <strong>ready</strong> technician through<br />

an unique tra<strong>in</strong><strong>in</strong>g methodology: A <strong>case</strong> <strong>study</strong> <strong>of</strong> <strong>Toyota</strong><br />

Technical Tra<strong>in</strong><strong>in</strong>g Institute, Bangalore, <strong>India</strong>.<br />

1


Who we are?<br />

2


<strong>Toyota</strong> Mo<strong>to</strong>r Corporation <strong>of</strong> Japan<br />

Established on Oct. 6, 1997<br />

<strong>An</strong> <strong>in</strong>itial <strong>in</strong>vestment <strong>of</strong> Rs. 900 crore<br />

Kirloskar Group <strong>of</strong> <strong>India</strong><br />

<strong>Toyota</strong> Kirloskar Mo<strong>to</strong>r ( TKM) Pvt Ltd is a subsidiary <strong>of</strong><br />

<strong>Toyota</strong> Mo<strong>to</strong>r Corporation( TMC) Japan. TKM was<br />

established <strong>in</strong> the year 1997.<br />

Overview <strong>of</strong> <strong>Toyota</strong> Kirloskar Mo<strong>to</strong>r Private, Ltd.<br />

Established<br />

Location<br />

Equity<br />

participation<br />

Initial<br />

Investment<br />

Number <strong>of</strong><br />

employees<br />

Oc<strong>to</strong>ber 1997 (start <strong>of</strong> production:<br />

December 1999)<br />

Bidadi -Suburb <strong>of</strong> Bangalore,<br />

Karnataka, <strong>India</strong><br />

TMC: 89%, Kirloskar Group: 11%<br />

INR 7 billion<br />

Approx. 7000<br />

3


Located <strong>in</strong> the heart <strong>of</strong> Bidadi Industrial Area<br />

Land Area: 432 Acres<br />

Production Capacity plant 1:<br />

90,000/Yr<br />

Production Capacity plant 2:<br />

1,20000/Yr<br />

No. <strong>of</strong> Employees: 5000<br />

( 97% are from Karnataka)<br />

Plant 1, was established <strong>in</strong> 1997 and plant 2 , <strong>in</strong> 2010<br />

.<br />

TKM Production Structure<br />

First Plant <strong>An</strong>nual production<br />

capacity<br />

Second Plant <strong>An</strong>nual production<br />

capacity<br />

Production <strong>to</strong>tal<br />

Investment<br />

Jul-11<br />

80,000<br />

80,000<br />

160,000<br />

Aproximate<br />

<br />

First half <strong>of</strong><br />

2012<br />

90,000<br />

120,000<br />

210,000<br />

Rs 275 crores<br />

2013<br />

100,000<br />

210,000<br />

310,000<br />

Rs 898<br />

crores<br />

4


<strong>Toyota</strong> Mo<strong>to</strong>r Corporation <strong>of</strong> Japan Kirloskar Group <strong>of</strong> <strong>India</strong><br />

INNOVA COROLLA ALTIS<br />

FORTUNER SMALL CAR<br />

At present we manufacture the above types <strong>of</strong> cars.<br />

5


We Contribute <strong>to</strong> the local community via:<br />

Education<br />

1. TTEP ( <strong>in</strong> ITI s) : Technician Edu.<br />

2. TSEP (<strong>in</strong> Schools): Safety Edu<br />

<strong>Toyota</strong> Mo<strong>to</strong>r Corporation <strong>of</strong> Japan Kirloskar Group <strong>of</strong> <strong>India</strong><br />

3. Environment<br />

Other Activities<br />

• Renovation <strong>of</strong> School Build<strong>in</strong>g<br />

• Renovation <strong>of</strong> Police Station<br />

• Construction <strong>of</strong> Water Tank<br />

In addition <strong>to</strong> manufactur<strong>in</strong>g cars, we also contribute <strong>to</strong> local<br />

community via a) TTEP( <strong>Toyota</strong> Technical Tra<strong>in</strong><strong>in</strong>g Education)<br />

programee where <strong>in</strong> we identify good Industrial Tra<strong>in</strong><strong>in</strong>g Institutes (<br />

ITI s) <strong>in</strong> the country and upgrade their MMV ( Mo<strong>to</strong>r Mechanic<br />

Vehicle) trade with tra<strong>in</strong><strong>in</strong>g material, cut models, tra<strong>in</strong><strong>in</strong>g <strong>of</strong><br />

tra<strong>in</strong>ers so that such tra<strong>in</strong><strong>in</strong>g Institutes can improve the tra<strong>in</strong><strong>in</strong>g<br />

capability and also improve employability <strong>of</strong> students seek<strong>in</strong>g job<br />

<strong>in</strong> Industry. b) TSEP ( <strong>Toyota</strong> Safety Education Programme) where<br />

school children are given awareness tra<strong>in</strong><strong>in</strong>g on Traffic safety<br />

through games.<br />

c) Environmental awareness amongst employees & school children<br />

by organis<strong>in</strong>g environmental day and pa<strong>in</strong>t<strong>in</strong>g competition. So far<br />

1,25,000 sapl<strong>in</strong>gs have been planted <strong>in</strong> the company premises and<br />

by 2014, 5 lakhs sapl<strong>in</strong>gs will be planted.<br />

d) Other activities <strong>in</strong> a small way <strong>in</strong>cludes renovation <strong>of</strong> rural<br />

school <strong>build</strong><strong>in</strong>g, Police Station and construction <strong>of</strong> water tank.<br />

In 2009 TKM bagged CII-ITC susta<strong>in</strong>ability award for commitment <strong>to</strong><br />

environment & social contribution.<br />

Note:<br />

<strong>Toyota</strong> Kirloskar Mo<strong>to</strong>r Pvt Ltd , has recived CII-ITC Susta<strong>in</strong>ability Awards<br />

2009 : Commendation for Significant Achievement Award 2) IIPM & The<br />

Sunday <strong>India</strong>n STATE EXCELLENCE AWARDS 2009 for Corporate Social<br />

Responsibility<br />

6


BACK GROUND FOR<br />

ESTABLISHING TOYOTA<br />

TECHNICAL TRAINING<br />

INSTITUTE<br />

7


Why vocational tra<strong>in</strong><strong>in</strong>g is necessary for<br />

any country?<br />

• Impart<strong>in</strong>g right Skill, Knowledge & Attitude are<br />

the driv<strong>in</strong>g force <strong>of</strong> economic growth & Social<br />

development for any country<br />

• Right skill <strong>in</strong>culcate dignity <strong>of</strong> labour, create<br />

greater awareness <strong>to</strong>wards environment, safety<br />

and health concern<br />

• Right skill improves employability, productivity &<br />

liv<strong>in</strong>g standard<br />

• Right Skill Strengthens competitiveness <strong>of</strong> the<br />

country<br />

8


Why Human Development is important<br />

Similar Technologies<br />

Similar Equipments<br />

Similar Processes<br />

Common Suppliers<br />

RESOURCES<br />

Only<br />

difference<br />

is People<br />

“Only people can make a difference”<br />

To day only difference between companies are its people<br />

& their work culture. Other th<strong>in</strong>gs like technology ,<br />

equipment, manufactur<strong>in</strong>g processes and component<br />

supplier are almost same for all companies.<br />

It is only people who can make a difference <strong>in</strong> produc<strong>in</strong>g<br />

quality products at an affordable cost .<br />

9


Million<br />

<strong>India</strong>n Au<strong>to</strong>mobile Market ( Passenger car)<br />

3.5<br />

3.0<br />

2.5<br />

2.0<br />

1.5<br />

1.0<br />

0.5<br />

0<br />

1980<br />

1985<br />

1990<br />

1995<br />

2000<br />

2005<br />

Employment potential <strong>in</strong> Au<strong>to</strong> & Au<strong>to</strong> Components: 25-30 million<br />

<strong>India</strong>n au<strong>to</strong>mobile market is grow<strong>in</strong>g rapidly. As per<br />

<strong>in</strong>dustry estimate, this sec<strong>to</strong>r alone may provide<br />

employment <strong>to</strong> about 25 million people by 2015. Hence<br />

there is a huge demand for skilled technicians <strong>in</strong> the<br />

country.<br />

2010<br />

2014<br />

10


Whom you call a “Skilled Skilled Technician”<br />

Technician<br />

QUALITY<br />

SAFETY<br />

CONTINUOUS<br />

IMPROVEMENT<br />

PRODUCTIVITY<br />

COST<br />

A skilled technician is one, who can achieve<br />

Safety, Quality, Cost, Productivity <strong>in</strong> his work. In<br />

addition , he should also be a strong believer <strong>of</strong><br />

cont<strong>in</strong>ual improvement .<br />

11


Problems with the Present formal Vocational Education System<br />

Requirements<br />

Skill<br />

Knowledge<br />

Attitude<br />

(Body& M<strong>in</strong>d)<br />

Out put from formal<br />

education<br />

50%- 70%<br />

50%-70%<br />

Left <strong>to</strong> Individual family<br />

background<br />

Industry<br />

Expectations<br />

Skill+ Safety<br />

Quality<br />

Productivity<br />

Cost reduction<br />

Cont<strong>in</strong>ual Improvement<br />

1.General Knowledge<br />

2.Applied Knowledge<br />

3.IT (Office Tools, CAD)<br />

4. Simple economics<br />

1.Stam<strong>in</strong>a for long work<br />

2. Sense <strong>of</strong> responsibility,<br />

3. Team work,<br />

4. Focused m<strong>in</strong>d<br />

5..Respect for seniors<br />

This slide talks about the skill , knowledge and attitude<br />

gap that exists between <strong>in</strong>dustry requirements and what<br />

we normally get from formal education systems like<br />

Industrial Tra<strong>in</strong><strong>in</strong>g Institutes ( ITI), Polytechnic etc.<br />

Hence, on one side there is a huge employment<br />

opportunity <strong>in</strong> the country and on the other side there is<br />

also huge unemployment. From the above slide it is clear<br />

that students com<strong>in</strong>g out <strong>of</strong> formal education system lack<br />

knowledge and skill that is required <strong>to</strong> achieve Safety ,<br />

Quality , Cost and Productivity (SQPC).<br />

In addition , right attitude for work is miss<strong>in</strong>g amongst<br />

employable students.<br />

Keep<strong>in</strong>g the above background <strong>in</strong> view we decided <strong>to</strong><br />

establish a model tra<strong>in</strong><strong>in</strong>g <strong>in</strong>stitute with <strong>in</strong>dustry relevant<br />

curriculum which can deliver <strong>in</strong>dustry <strong>ready</strong> technicians<br />

from day 1. .<br />

12


Survey <strong>of</strong> High School Education <strong>in</strong> Karnataka( 2005-06)<br />

10 std<br />

800,000<br />

50%<br />

50%<br />

Pass<br />

400,000<br />

Fail<br />

400,000<br />

Large number <strong>of</strong> students<br />

can’t can t challenge<br />

higher education... ………. ………<br />

75%<br />

11%<br />

5%<br />

10%<br />

Pre-Univ.<br />

300,000 only 50%<br />

pass<br />

Diploma<br />

44,000 only 40% pass<br />

ITI<br />

20,000 only 10% pass<br />

Work etc<br />

40,000<br />

Before decid<strong>in</strong>g what target group <strong>of</strong> students our<br />

Institute should admit , we conducted a survey <strong>to</strong><br />

f<strong>in</strong>d out where students go after pass<strong>in</strong>g their 10th standard. ( i.e High School) We did this survey <strong>in</strong><br />

2005.<br />

1.We found that about 10 % <strong>of</strong> High School Passed<br />

students <strong>in</strong> Karnataka i.e about 40,000 can not take<br />

up further education due <strong>to</strong> family circumstances<br />

and f<strong>in</strong>ancial constra<strong>in</strong>ts<br />

2.Hence as a part <strong>of</strong> CSR activity <strong>of</strong> TKM, we<br />

decided <strong>to</strong> admit only this category <strong>of</strong> students <strong>in</strong><br />

our Institute and make them employable with world<br />

class skill tra<strong>in</strong><strong>in</strong>g<br />

3. The survey also found that most <strong>of</strong> the students<br />

who drop out after 10th Std . comes from rural areas<br />

<strong>of</strong> Karnataka<br />

13


PROJECT OBJECTIVE<br />

14


.<br />

Objectives for establish<strong>in</strong>g TTTI<br />

• To provide free tra<strong>in</strong><strong>in</strong>g & education <strong>to</strong> <strong>in</strong>telligent but<br />

f<strong>in</strong>ancially poor students from rural area & make them<br />

employable<br />

• To provide opportunity <strong>to</strong> acquire specialised au<strong>to</strong>mobile<br />

manufactur<strong>in</strong>g Skill as per <strong>in</strong>dustry requirement<br />

• To develop leadership attributes through <strong>Toyota</strong> Way<br />

discipl<strong>in</strong>e who can contribute <strong>to</strong> <strong>India</strong>n <strong>in</strong>dustry<br />

15


COURSE OUTLINE,<br />

CURRICULUM OUTLINE<br />

TRAINING OUTCOME<br />

16


TTTI Course Outl<strong>in</strong>e<br />

Tra<strong>in</strong><strong>in</strong>g <strong>of</strong>fered<br />

Total <strong>An</strong>nual Intake<br />

Entry Qualification<br />

Tra<strong>in</strong><strong>in</strong>g Period<br />

1.Au<strong>to</strong>mobile Weld<br />

2.Au<strong>to</strong>mobile Assembly<br />

3.Au<strong>to</strong>mobile Pa<strong>in</strong>t<br />

4.Plant Ma<strong>in</strong>tenance (Mechatronics)<br />

64 ( every year <strong>in</strong> July)<br />

1. 10th Standard Pass <strong>in</strong> first attempt with<br />

m<strong>in</strong>imum 50% <strong>in</strong> Maths, Science and<br />

overall and < 18 years <strong>of</strong> age.<br />

2. Should have studied from rural school <strong>in</strong><br />

Karnataka ( admission only for Karnataka<br />

students)<br />

3. Parents are economically poor and can<br />

not afford further education<br />

3 Years ( 6 semester) <strong>of</strong>fered free <strong>of</strong> cost,<br />

with stipend & fellowship<br />

This is the course outl<strong>in</strong>e <strong>of</strong> Tra<strong>in</strong><strong>in</strong>g be<strong>in</strong>g <strong>of</strong>fered by this<br />

<strong>in</strong>stitute.<br />

17


Curriculum outl<strong>in</strong>e<br />

3rd Year<br />

2nd Year<br />

1st Year<br />

Body & M<strong>in</strong>d<br />

Discipl<strong>in</strong>e<br />

Team Work<br />

Body & M<strong>in</strong>d<br />

Discipl<strong>in</strong>e<br />

Team Work<br />

Body & M<strong>in</strong>d<br />

Discipl<strong>in</strong>e<br />

Team Work<br />

General<br />

& Industrial<br />

Knowledge<br />

General<br />

& Industrial<br />

Knowledge<br />

Work Shop<br />

Tra<strong>in</strong><strong>in</strong>g<br />

(Off Job<br />

Trg)<br />

( 8 weeks)<br />

Work Shop<br />

Tra<strong>in</strong><strong>in</strong>g<br />

(Off Job Trg)<br />

( 8 weeks)<br />

General<br />

& Industrial<br />

Knowledge<br />

B&M 33 %; Knowledge 26% ; Skill 41 %<br />

Shop Floor Tra<strong>in</strong><strong>in</strong>g<br />

(On job Tra<strong>in</strong><strong>in</strong>g)<br />

( 20 weeks)<br />

Shop Floor Tra<strong>in</strong><strong>in</strong>g<br />

(On job Trg <strong>in</strong> Fac<strong>to</strong>ry)<br />

( 20 weeks)<br />

Workshop Tra<strong>in</strong><strong>in</strong>g<br />

(Off Job Trg)<br />

( 9 weeks)<br />

This is the Industry Relevant curriculum adopted by TTTI.<br />

It may be seen that 33% <strong>of</strong> the curriculum is devoted<br />

<strong>to</strong>wards Attitude Development ( Body & M<strong>in</strong>d<br />

Development). This is one <strong>of</strong> the uniqueness <strong>of</strong> this<br />

<strong>in</strong>stitute,<br />

The break up <strong>of</strong> 3 years Knowledge , skill and Attitude<br />

tra<strong>in</strong><strong>in</strong>g is as under:<br />

Knowledge 1680 hours<br />

Skill 2560<br />

Attitude 2096<br />

--------------------------------------<br />

Total 6336 hours<br />

18


TRAINING<br />

OUT COME<br />

At the end <strong>of</strong> 3 years tra<strong>in</strong><strong>in</strong>g, the students should<br />

become an ideal team member <strong>in</strong> the production l<strong>in</strong>e with<br />

the above attributes. These are our expected tra<strong>in</strong><strong>in</strong>g out<br />

come<br />

19


TRAINING CONCEPT FOR<br />

IMPLEMETING THE PROJECT<br />

20


This is a concept sheet for implement<strong>in</strong>g Body & M<strong>in</strong>d<br />

(Attitude <strong>build</strong><strong>in</strong>g) Tra<strong>in</strong><strong>in</strong>g.<br />

We believe that the out come <strong>of</strong> good Body & M<strong>in</strong>d<br />

Tra<strong>in</strong><strong>in</strong>g should develop follow<strong>in</strong>g attributes:<br />

a) Team Spirit b) Sense <strong>of</strong> responsibility c) Challeng<strong>in</strong>g<br />

m<strong>in</strong>d d) Ready for <strong>to</strong>ugh job e) Respect for seniors and<br />

peers f) Good corporate citizen ship.<br />

The above objective shall achieved through:<br />

a) Daily Yoga & Meditation b) Planned sports and extra<br />

curricular activities c) regular physical fitness exercise<br />

d) undertak<strong>in</strong>g Social services <strong>to</strong> help the needy etc.<br />

21


This slide expla<strong>in</strong>s about the concept <strong>of</strong> develop<strong>in</strong>g right<br />

knowledge amongst students.<br />

We believe, <strong>in</strong> addition <strong>to</strong> impart<strong>in</strong>g subject knowledge, it<br />

is necessary <strong>to</strong> provide opportunity for students <strong>to</strong><br />

acquire general knowledge, use <strong>of</strong> IT <strong>to</strong>ols, enhancement<br />

<strong>of</strong> communication skill through sem<strong>in</strong>ars , m<strong>in</strong>i project etc<br />

22


This slide is about the concept <strong>of</strong> impart<strong>in</strong>g skill tra<strong>in</strong><strong>in</strong>g.<br />

We believe , skill tra<strong>in</strong><strong>in</strong>g is <strong>in</strong>complete without the<br />

knowledge <strong>of</strong> Safety, Quality, Cost and Productivity.<br />

Hence the tra<strong>in</strong><strong>in</strong>g on aspects like Quality Circle, Work<br />

place improvement / good house keep<strong>in</strong>g called as 5 S,<br />

Danger Prediction through critical eye, Time management<br />

, Cost management , creative suggestion etc should<br />

become a part <strong>of</strong> the skill tra<strong>in</strong><strong>in</strong>g/<br />

23


High Skill<br />

Release <strong>to</strong> Industry as Ideal TM<br />

1. A competent skilled person who can work with SQPC m<strong>in</strong>d<br />

2. A person who can w<strong>in</strong> the hearts <strong>of</strong> Superiors, Seniors and Juniors<br />

3. A self driven person who lead by Example<br />

Healthy<br />

Body & M<strong>in</strong>d<br />

Healthy Body & M<strong>in</strong>d<br />

•Ready for Tough Job<br />

•Focused<br />

•Sense <strong>of</strong> Responsibility<br />

•Team Work Spirit ( Co operative)<br />

•Initiativeness & Challeng<strong>in</strong>g M<strong>in</strong>d<br />

• Tak<strong>in</strong>g earnest effort <strong>in</strong> all<br />

matters<br />

Knowledge<br />

• General , Industrial & IT<br />

• Awareness about Global<br />

Broad & <strong>in</strong>-depth Economic Scenario<br />

Knowledge<br />

Skill<br />

• Work place skill with Safety, Quality,<br />

Cost & improvement<br />

INDUSTRY<br />

Good Th<strong>in</strong>k<strong>in</strong>g<br />

Good Product<br />

We believe after 3 years <strong>of</strong> rigorous tra<strong>in</strong><strong>in</strong>g on Knowledge, Skill<br />

and Attitude as per our implementation strategy/concept, the<br />

student will become an ideal team member <strong>in</strong> the production l<strong>in</strong>e<br />

with the above attributes.<br />

24


PROJECT DETAILS:<br />

INFRASTRUCTURE<br />

INVESTMENT<br />

STUDENT SELECTION<br />

PROCEDURE,<br />

25


T - TOYOTA<br />

T - TECHNICAL<br />

T - TRAINING<br />

I - INSTITUTE<br />

FIRST TECHNICAL INSTITUTE OF TOYOTA<br />

ESTABLISHED OUTSIDE JAPAN<br />

A Brief about TTTI:<br />

TTTI was established <strong>in</strong> the year 2007. This is the only<br />

technical <strong>in</strong>stitute <strong>of</strong> <strong>Toyota</strong> established outside Japan.<br />

26


TTTI INFRASTRUCTURE<br />

1. Tra<strong>in</strong><strong>in</strong>g Center : 2900 Sqm<br />

4 Workshop cum Class room<br />

1 Audi<strong>to</strong>rium<br />

8 <strong>in</strong>dependent class rooms<br />

1 Library<br />

1 Computer Room<br />

2. Sports Ground : 25000 Sqm<br />

400 M Track<br />

Foot Ball<br />

Basket Ball<br />

Cricket<br />

3. Dormi<strong>to</strong>ry : 2700 Sqm<br />

140 room ( 280 Students),<br />

4 Guest Room<br />

Indoor Game<br />

Gym<br />

Sports<br />

Dormi<strong>to</strong>ry<br />

This slide is about TTTI Infrastructure. Total area allocated<br />

<strong>to</strong> TTTI is 35000 SQ Meter.<br />

27


TTTI INVESTMENT<br />

SL NO. INFRASTRUCTURE<br />

1<br />

2<br />

3<br />

TRAINING CENTER<br />

HOSTEL<br />

SPORTS GROUND<br />

EQUIPMENT<br />

AVERAGE ANNUAL<br />

RUNNING<br />

EXPENDITURE<br />

TOTAL<br />

RS MILLION<br />

040<br />

055<br />

015<br />

166<br />

024<br />

TOTAL<br />

110<br />

166<br />

024<br />

300<br />

This slide is about TTTI <strong>in</strong>vestment as on July 2011.<br />

28


Student Selection<br />

• Entrance Exam<strong>in</strong>ation (<strong>in</strong> Maths, Science, English,Aptitude)<br />

• Physical Test + Skill test + Interview<br />

• Medical Check<br />

Physical Test Skill Test Interview<br />

S<strong>in</strong>ce we get large number <strong>of</strong> application ( 2000+ for 64<br />

seats, ) Students are selected based on Entrance<br />

Exam<strong>in</strong>ation followed by Physical test ( which checks<br />

students endurance) and Skill Test ( which checks<br />

students hand and eye co ord<strong>in</strong>ation capability)<br />

We also hold <strong>in</strong>terview with the parents <strong>to</strong> asses their<br />

f<strong>in</strong>ancial status.<br />

Selected students have <strong>to</strong> undergo medical check up<br />

before be<strong>in</strong>g admitted <strong>to</strong> the <strong>in</strong>stitute.<br />

29


Tra<strong>in</strong><strong>in</strong>g fee, Stipend etc<br />

• Tra<strong>in</strong><strong>in</strong>g fee: Nil<br />

• * Stipend :Rs 1800/PM In First Year<br />

Rs 2000/PM In Second Year<br />

Rs 2200/PM InThird Year<br />

* Deduct Rs 1500/PM <strong>to</strong>wards board<strong>in</strong>g, lodg<strong>in</strong>g, uniform, Tra<strong>in</strong><strong>in</strong>g material<br />

+<br />

• Fellowship : Rs 7000/<strong>An</strong>num for secur<strong>in</strong>g > 70% <strong>in</strong><br />

Exam<strong>in</strong>ation + Good Attitude<br />

: Rs 9000 if >80% <strong>in</strong> Exam<strong>in</strong>ation<br />

+ Good Attitude<br />

As part <strong>of</strong> CSR activity, we do not charge any tra<strong>in</strong><strong>in</strong>g fee<br />

<strong>to</strong> the students.<br />

We pay monthly stipend as mentioned about.<br />

In order <strong>to</strong> develop challeng<strong>in</strong>g ability amongst students,<br />

we also award fellowship as per details given above . It<br />

may be noted that fellowship is l<strong>in</strong>ked <strong>to</strong> display <strong>of</strong> good<br />

attitude.<br />

30


ACTION PLAN FOR IMPLEMENTING<br />

BODY & MIND TRAINING<br />

( 3 years-120 weeks 2096 hours)<br />

31


A typical Day Activity <strong>of</strong> a tra<strong>in</strong>ee<br />

6AM-9AM<br />

9AM-4PM<br />

4PM-10PM<br />

A typical day activity <strong>of</strong> tra<strong>in</strong>ee will be as per details<br />

given above.<br />

1. 6-9 AM Morn<strong>in</strong>g activities<br />

2. 9-4 PM Regular academic Tra<strong>in</strong><strong>in</strong>g<br />

3. 4-6 PM Sports and one day <strong>in</strong> a week Garden<strong>in</strong>g<br />

4. 8-10 PM Home work and <strong>study</strong> hours.<br />

32


Dormi<strong>to</strong>ry Room: <strong>An</strong> <strong>in</strong>novative approach<br />

Get up at 5.45 A.M Make up the room Proceed for morn<strong>in</strong>g activity<br />

Perfect room condition <strong>to</strong> be ma<strong>in</strong>ta<strong>in</strong>ed 24x7 and 365<br />

days. Here students are taught how <strong>to</strong> spread bed sheet,<br />

how <strong>to</strong> fold mosqui<strong>to</strong> curta<strong>in</strong>, how <strong>to</strong> keep their clothes<br />

and books <strong>in</strong> spic & span.<br />

Senior students should teach juniors and also undertake<br />

audit <strong>of</strong> rooms at regular <strong>in</strong>tervals. ( this develops sense<br />

<strong>of</strong> responsibility amongst seniors). Each room is<br />

occupied by one senior and one junior student<br />

33


Health Run ( 15 m<strong>in</strong>s) from 6.0-6.15 AM<br />

Every day 15 m<strong>in</strong>utes health run is a must for all<br />

students. This is a pho<strong>to</strong>graph <strong>of</strong> daily health run activity.<br />

34


Yoga ( 45 m<strong>in</strong>s)- 6.15 <strong>to</strong> 7 AM<br />

A senior student by turn will tra<strong>in</strong> others <strong>in</strong> various yoga<br />

postures and meditation technique.<br />

35


Canteen ( break fast 8 A.M)<br />

L<strong>in</strong>e discipl<strong>in</strong>e <strong>to</strong> be ma<strong>in</strong>ta<strong>in</strong>ed be it <strong>in</strong> canteen or work<br />

place. Here seniors take part <strong>in</strong> serv<strong>in</strong>g others<br />

36


Plate Wash<strong>in</strong>g Area<br />

Every students <strong>in</strong>clud<strong>in</strong>g staff , teachers should wash<br />

their plates. spoon, tumbler and have <strong>to</strong> be segregated<br />

and kept <strong>in</strong> the respective b<strong>in</strong>s. Staff should lead by<br />

example. A concept <strong>of</strong> good house keep<strong>in</strong>g is<br />

implemented through this activity.<br />

37


Ready <strong>to</strong> move for Tra<strong>in</strong><strong>in</strong>g ( 8.40 AM)<br />

Before a students leaves dormi<strong>to</strong>ry and proceed <strong>to</strong><br />

tra<strong>in</strong><strong>in</strong>g session, they have <strong>to</strong> do certa<strong>in</strong> activities like:<br />

a) Attendance check<br />

b) Health condition check<br />

c) Uniform check<br />

d) F<strong>in</strong>ger Check<br />

e) Receive any special <strong>in</strong>struction from the dormi<strong>to</strong>ry<br />

staff<br />

38


Uniform<br />

& Self Check<br />

8.40 A.M<br />

Check<strong>in</strong>g <strong>of</strong> uniform and other items before proceed<strong>in</strong>g <strong>to</strong><br />

tra<strong>in</strong><strong>in</strong>g session. This ensures good time management<br />

and sense <strong>of</strong> responsibility.<br />

39


Cultivat<strong>in</strong>g the habit <strong>of</strong> always walk<strong>in</strong>g <strong>in</strong> Safety path.<br />

Once this becomes a habit, the boys will implement even<br />

outside the campus/village/cities.<br />

40


F<strong>in</strong>ger check at Junction<br />

Cross the road through f<strong>in</strong>ger check <strong>to</strong> ensure noth<strong>in</strong>g is<br />

com<strong>in</strong>g from left or right. This habit is required <strong>in</strong>side the<br />

plant, <strong>to</strong> avoid accidents with the mov<strong>in</strong>g vehicles.<br />

41


Morn<strong>in</strong>g Assembly( 8.40 A.M <strong>to</strong> 9 A.M)<br />

1. Human Relation Pr<strong>in</strong>ciple 2.Technical Term 3.Thought for the day<br />

4. Word for the day 5. Experience shar<strong>in</strong>g 6.News Read<strong>in</strong>g<br />

Morn<strong>in</strong>g assembly <strong>in</strong>cludes 3 m<strong>in</strong>utes <strong>of</strong> stretch<strong>in</strong>g<br />

exercise followed by:<br />

a) Read<strong>in</strong>g <strong>of</strong> Human Relation Pr<strong>in</strong>ciples b) Expla<strong>in</strong><strong>in</strong>g<br />

one technical term c) read<strong>in</strong>g one difficult word and<br />

mak<strong>in</strong>g sentences) experience shar<strong>in</strong>g by senior students<br />

and News read<strong>in</strong>g.<br />

The objectives <strong>of</strong> these activities are a) Improv<strong>in</strong>g<br />

communication skills <strong>of</strong> each students b) Shar<strong>in</strong>g <strong>of</strong><br />

Knowledge c) Develop<strong>in</strong>g self confidence <strong>of</strong> students.<br />

Every student <strong>of</strong> the <strong>in</strong>stitute gets at least 3 chances<br />

/semester <strong>to</strong> come on the dais and speak.<br />

42


5 S ACTIVITY( Every day 3.45 <strong>to</strong> 4 P.M at TTTI<br />

6.45 <strong>to</strong> 7 P.M at Dormi<strong>to</strong>ry):<br />

Develop<strong>in</strong>g critical eye for abnormalities<br />

Here the concept <strong>of</strong> 5 S is implemented. This is a simple<br />

Japanese <strong>to</strong>ol for good house keep<strong>in</strong>g through which a<br />

student can understand abnormalities, danger condition<br />

etc. This is a part <strong>of</strong> safety, quality, cost and productivity<br />

improvement tra<strong>in</strong><strong>in</strong>g. Once adopted as a habit , this<br />

becomes <strong>to</strong>ol for discipl<strong>in</strong>ed way <strong>of</strong> liv<strong>in</strong>g <strong>in</strong> personal life<br />

<strong>to</strong>o. We expect the students <strong>to</strong> cont<strong>in</strong>ue this habit<br />

throughout his life time and also teach his<br />

brothers/sisters and friends <strong>in</strong> their home <strong>to</strong>wn.<br />

43


Waste Segregation<br />

Waste segregation tra<strong>in</strong><strong>in</strong>g is an important activity from<br />

environmental management po<strong>in</strong>t <strong>of</strong> view.<br />

44


Sports activities ( 4.30 PM <strong>to</strong> 6.30 PM)<br />

Every day sports teaches them the concept <strong>of</strong> team work<br />

and never give up attitude and <strong>build</strong>s stam<strong>in</strong>a.<br />

45


PUSH UPS FOR<br />

SHOULDER STRENDTH<br />

TTTI STUDENTS PHYSICAL FITNESS TEST EVENTS<br />

CRUNCHES FOR<br />

ABDOMEN STRENDTH<br />

STANDING BROAD JUMP<br />

FOR EXPLOSIVE<br />

STRENGTH<br />

PURPOSE PURPOSE PURPOSE<br />

DEVELOP SHOULDER<br />

STRENGTH<br />

HANDLE TOOLS WITHOUT<br />

FATIQUE<br />

DEVELOP ABDOMEN<br />

STRENGTH<br />

DEVELOP OVERALL BODY<br />

EXPLOSIVE STRENGTH<br />

TARGET TARGET<br />

TARGET<br />

1st YEAR 40 <strong>to</strong> 50 Push ups<br />

2nd YEAR 50 <strong>to</strong> 60 Push ups<br />

3rd YEAR 60 and Above<br />

Push ups<br />

AVOID OBESITY<br />

DEVELOP OVERALL BODY<br />

REACTION ABILITY<br />

BEEP TEST FOR<br />

ENDURANCE<br />

GRIP TEST FOR<br />

GRIP STRENGTH<br />

PURPOSE PURPOSE PURPOSE<br />

WORK FOR LONGER<br />

DURATION WITHOUT FATIQUE<br />

IMPROVE CARDIOVASCULAR<br />

EFFICIENCY<br />

TARGET<br />

1st YEAR 40 <strong>to</strong> 50 Abdomen 1st YEAR 1.75 <strong>to</strong> 2.00 meters 1st YEAR 9.5 <strong>to</strong> 10 Stages<br />

2nd YEAR50 <strong>to</strong> 60 Abdomen<br />

3rd YEAR60 and Above<br />

Abdomen<br />

2nd YEAR 2.01 <strong>to</strong> 2.25 meters<br />

3rd YEAR 2.50 meters and<br />

Above<br />

2nd YEAR 10 <strong>to</strong> 10.5 Stages<br />

3rd YEAR 10.5 and Above<br />

TO KNOW GRIP STRENGTH<br />

DEVELOP GRIP STRENGTH<br />

TO HANDLE THE TOOLS<br />

WITHOUT FATIQUE<br />

TARGET<br />

1st YEAR 45 <strong>to</strong> 50 Kgs<br />

2nd YEAR 51 <strong>to</strong> 55 Kgs<br />

BACK STRENGTH TEST<br />

FOR BACK STRENGTH<br />

TO DEVELOP BACK<br />

STRENGTH<br />

TO PREVENT BACK<br />

PROBLEM<br />

TARGET<br />

1st YEAR 135 <strong>to</strong> 140 Kgs<br />

2nd YEAR 141 <strong>to</strong> 145 Kgs<br />

3rd YEAR 56 and above 3rd YEAR 146 and above<br />

This physical fitness test is conducted once <strong>in</strong> 2 months<br />

<strong>to</strong> check students shoulder strength, abdomen strength,<br />

explosive strength, endurance, grip and back strength.<br />

This would help them <strong>to</strong> develop right stam<strong>in</strong>a <strong>to</strong> stand<br />

and work for 8 hours everyday <strong>in</strong> production l<strong>in</strong>e without<br />

develop<strong>in</strong>g any back or leg pa<strong>in</strong>.<br />

46


W<br />

H<br />

A<br />

T<br />

W<br />

H<br />

E<br />

N<br />

WHO<br />

Attributes<br />

Sports<br />

Health &<br />

Yoga<br />

a) Health & Physical fitness o o<br />

Class room<br />

/Dormi<strong>to</strong>ry<br />

b) Sense <strong>of</strong> Responsibility o o o<br />

c) Co operativeness o o o<br />

d) Leadership & Self<br />

Initiative challeng<strong>in</strong>g<br />

m<strong>in</strong>d<br />

SEMESTER SYSTEM<br />

1st Sem<br />

BODY & MIND TRAINING EVALUATION PARAMETERS<br />

WHERE<br />

o o o<br />

How Much<br />

406 Hrs<br />

Evaluation po<strong>in</strong>ts<br />

ABSENTISIM RATING ASSESMENT RATINGS<br />

HOW<br />

a) Does not frequently visit cl<strong>in</strong>ic<br />

b) Does not frequently report accidents<br />

c) Ma<strong>in</strong>ta<strong>in</strong>s required physical fitness<br />

d) Bright & Smil<strong>in</strong>g face<br />

a) Completes the assigned work on time ( assignment , Skill<br />

activities etc)<br />

b) Does not loose items which are issued <strong>to</strong> him<br />

c) Does not frequently absent for Morn<strong>in</strong>g or even<strong>in</strong>g<br />

activities <strong>in</strong>clud<strong>in</strong>g attend<strong>in</strong>g classes<br />

d) Has good control <strong>of</strong> senses ( Behaves properly as per<br />

TPO, Control on food, sleep, TV view<strong>in</strong>g)<br />

a) Respect Seniors & Give thoughtfull consideration for<br />

juniors (Good Communication)<br />

b)Value team work and mutual trust<br />

c)No rigid m<strong>in</strong>d <strong>in</strong> carry<strong>in</strong>g out assigned work<br />

d) Not argumentative<br />

e) Good <strong>in</strong> 4 S activities<br />

a) Develops good Oral & Written Communication skill <strong>to</strong><br />

conv<strong>in</strong>ce superiors & Sub ord<strong>in</strong>ates<br />

b)Propose action based on facts<br />

c)Judge his own problem & Improve<br />

d)Work earnestlt <strong>to</strong> the best <strong>of</strong> his abilities<br />

e) Can act accord<strong>in</strong>g <strong>to</strong> Time ,Place & Occasion<br />

2nd Sem 396 Hrs<br />

1. >6 DAYS IN A SEM<br />

1. Undestand and appreciate the purpose <strong>of</strong> B&M Activities<br />

3rd Sem<br />

326 Hrs<br />

2. Between 4 <strong>to</strong> 6 days<br />

2. Can demonstrate with the support <strong>of</strong> <strong>in</strong>struc<strong>to</strong>rs advise<br />

4th Sem<br />

326 Hrs<br />

3. Between 2<strong>to</strong> 3 days<br />

3. Can demonstrate on his own<br />

5th Sem<br />

326 Hrs<br />

4. Maximun 1 day<br />

4.Not only demostrate but also can help his collegues <strong>to</strong><br />

6th Sem<br />

316 hrs<br />

achieve it (Becomes a role model for others)<br />

Tra<strong>in</strong>ers<br />

Dormi<strong>to</strong>ry staff and<br />

respective class teachers<br />

This is our evaluation sheet <strong>to</strong> evaluate students attitude. This is<br />

evaluated on a monthly basis.<br />

47


ACTION PLAN FOR IMPLEMENTINGN<br />

KNOWLEDGE TRAINING<br />

( 3 years- 56 Weeks 1680 Hours)<br />

48


Class Room ( Knowledge Tra<strong>in</strong><strong>in</strong>g) : 9AM - 3.45 PM<br />

• English<br />

• Japanese<br />

• Science<br />

• Mathematics<br />

• Home Science<br />

• Social Studies<br />

• Eng<strong>in</strong>eer<strong>in</strong>g<br />

Draw<strong>in</strong>g<br />

• CAD<br />

• Work shop Cal.<br />

• Trade Theory &<br />

Practical<br />

• Production Tech.<br />

• Mach<strong>in</strong>e Design<br />

• Au<strong>to</strong>mobile<br />

• Elect &<br />

Electronics<br />

List <strong>of</strong> subjects be<strong>in</strong>g taught over a period <strong>of</strong> 3 years ( 56<br />

weeks = 1680 Hours) are given above. Apart from basic<br />

English, science mathematics and eng<strong>in</strong>eer<strong>in</strong>g subjects,<br />

we teach Home management as subject so that they<br />

should know the importance <strong>of</strong> family, social life, respect<br />

for seniors, money management etc.<br />

49


TOYOTA SPECIFIC KNOWLEDGE TRAINING<br />

1. TOYOTA VALUES<br />

<strong>Toyota</strong> Way ( Cont<strong>in</strong>uous improvement and Respect for people)<br />

<strong>Toyota</strong> Bus<strong>in</strong>ess Practice ( Problem solv<strong>in</strong>g technique)<br />

2. SAFETY & ENVIRONMENT<br />

Develop<strong>in</strong>g Critical Eye for abnormalities<br />

F<strong>in</strong>ger Cross ( Green Path, F<strong>in</strong>ger Cross at Junction)<br />

K Y T ( Danger Prediction)<br />

Hiyariha<strong>to</strong> ( Near Miss)<br />

<strong>An</strong>nual Safety Slogan / Quiz<br />

Waste Segregation & Disposal & ISO 14001<br />

6 S (Sort<strong>in</strong>g, Systematic arrangement, Spic & Span, Standardise, Self Discipl<strong>in</strong>e, K<strong>in</strong>dness)<br />

3. QUALITY<br />

Creative Suggestion Scheme<br />

Quality Circle<br />

4. COST<br />

Concept <strong>of</strong> 6 R ( Reduce, Reuse, Recycle, Ref<strong>in</strong>e, Reform, Repair)<br />

5. PRODUCTIVITY<br />

Standard Work<br />

<strong>Toyota</strong> Production System<br />

This is a <strong>Toyota</strong> specific Knowledge tra<strong>in</strong><strong>in</strong>g on safety,<br />

quality, Cost and productivity (SQPC). Each student will<br />

undergo about 110 hours <strong>of</strong> tra<strong>in</strong><strong>in</strong>g over a period <strong>of</strong> 3<br />

years.<br />

50


Sr No<br />

Sr No<br />

Care for Safety & Health: <strong>An</strong> <strong>in</strong>novative approach<br />

What happened<br />

(Concern/Problem)<br />

Temp Measures<br />

Who<br />

By When<br />

Where<br />

(Location)<br />

Responsible<br />

Person<br />

When<br />

(Time/Date)<br />

F<strong>in</strong>al<br />

Measures<br />

How<br />

By When<br />

This ppt shows safety calendar and health card report.<br />

Green colour <strong>in</strong>dicates zero accident on that day. Red<br />

colour <strong>in</strong>dicates some accident <strong>to</strong>ok place on that day.<br />

Down below is a format <strong>to</strong> be written by student <strong>in</strong>charge,<br />

whenever any accident happens. Here they<br />

develop habit <strong>of</strong> problem solv<strong>in</strong>g by analyz<strong>in</strong>g what<br />

happened, how it happened and what temporary and<br />

permanent measures <strong>to</strong> be taken so that such accidents<br />

does not repeat.<br />

51


Giv<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g on<br />

how <strong>to</strong> moni<strong>to</strong>r and save<br />

Scare resources like water,<br />

Electricity <strong>in</strong> the tra<strong>in</strong><strong>in</strong>g<br />

Center. This is a tra<strong>in</strong><strong>in</strong>g<br />

on cost management.<br />

The chart shown here<br />

is on monthly consumption<br />

<strong>of</strong> water and electricity <strong>in</strong> the<br />

Dormi<strong>to</strong>ry.<br />

<strong>An</strong>y excess<br />

Consumption aga<strong>in</strong>st target<br />

Is analysed by students<br />

<strong>An</strong>d counter measures taken<br />

52


Tra<strong>in</strong><strong>in</strong>g on<br />

Creative<br />

suggestion<br />

Every student has <strong>to</strong> submit two suggestions per month.<br />

This would help students <strong>to</strong> develop creative th<strong>in</strong>k<strong>in</strong>g<br />

ability. Suggestions could be <strong>in</strong> the areas <strong>of</strong> workability<br />

improvement, quality enhancement. cost reduction,<br />

productivity improvement.<br />

As part <strong>of</strong> motivation, Students are given cash award and<br />

certificate for giv<strong>in</strong>g high value suggestion.<br />

53


DANGER<br />

PREDICTION CUM<br />

NEAR MISS<br />

ACCIDENT<br />

REPORT<br />

With this tra<strong>in</strong><strong>in</strong>g students develop critical eye for any<br />

abnormalities and solve safety problems, be it <strong>in</strong> class<br />

room, workshop, play ground or dormi<strong>to</strong>ry. All students<br />

should submit at least one report per month.<br />

54


This is a sample QC Circle activity done done by 3 rd year<br />

students.<br />

55


ACTION PLAN FOR IMPLEMENTING<br />

SKILL TRAINING<br />

( 3 years- 24 weeks 960 Hours)<br />

56


Fitt<strong>in</strong>g Workshop ( 1 week= 40 Hrs)<br />

1.Car Model<br />

2.Limit Switch<br />

Safety wears<br />

4s <strong>of</strong> area<br />

THIS GIVES A VIEW OF ONE <strong>of</strong> THE WORK SHOP FACILITY<br />

57


Au<strong>to</strong>mobile Assembly ( 24 weeks)<br />

1. Eng<strong>in</strong>e Disassembly<br />

& Assembly<br />

2. Drive Tra<strong>in</strong><br />

3. Steer<strong>in</strong>g System<br />

4. Alignment &<br />

Balanc<strong>in</strong>g<br />

Fundamental Skill:<br />

Safety<br />

Bolt Tighten<strong>in</strong>g<br />

Nut Tighten<strong>in</strong>g<br />

Screw Tighten<strong>in</strong>g<br />

Screw Grommet<br />

Plug hole Grommet<br />

Connec<strong>to</strong>r connection<br />

Hose Connection<br />

Flare nut tighten<strong>in</strong>g<br />

58


Au<strong>to</strong>mobile Pa<strong>in</strong>t ( 24 weeks)<br />

1.Sealer Applications<br />

2. Sand<strong>in</strong>g<br />

3.Spray Pa<strong>in</strong>t<br />

4.Surface defects<br />

a) Production Defects<br />

b) Market Defects<br />

Fundamental Skills:<br />

Safety,<br />

gun angle, Distance,<br />

Speed, Posture<br />

59


Mechatronics ( Plant Ma<strong>in</strong>tenance)24 weeks<br />

Basic Wir<strong>in</strong>g<br />

Mo<strong>to</strong>r Fundamentals<br />

Sequenc<strong>in</strong>g<br />

Mach<strong>in</strong>e Structure ( gears mechanism)<br />

Hydraulics<br />

Pneumatics<br />

PLC<br />

Sensors<br />

Robot<br />

Electronics,<br />

Fundamental skills:<br />

Safety,<br />

Colour Code, Earth<strong>in</strong>g, solder<strong>in</strong>g,<br />

weld<strong>in</strong>g, plate mak<strong>in</strong>g<br />

60


Au<strong>to</strong>mobile weld ( 24 weeks)<br />

1. Shielded metal ARC<br />

2. Gas( co2)<br />

3. Metal Inert Gas ,<br />

4. Tungsten Inert Gas<br />

5. Braz<strong>in</strong>g<br />

6. Resistance (spot)<br />

Fundamental skill:<br />

Safety,<br />

Arc gap, <strong>An</strong>gle, speed<br />

61


PURPOSE To Confirm the Student Target Achievement 100 Scor<strong>in</strong>g std 10 20 30 40<br />

Updated On: / /<br />

Issued On: / /<br />

50<br />

1 Use for feed back for further improvements 80 above 4 10 19 above 28 above 37 above 46 above<br />

2 Material for student Management 70~79 3 9 17~18 25~27 33~36 41~45<br />

3 For Scholarship judgement 60~69 2 8 14~16 21~24 27~32 34~40<br />

91 %<br />

81 ~ 90%<br />

66 ~ 80%<br />

51 ~ 65%<br />

Excellent Control <strong>in</strong> all<br />

activities as a Leader.<br />

F<strong>in</strong>ds New Way by Consult<strong>in</strong>g<br />

Tra<strong>in</strong>er<br />

Good Control <strong>in</strong> all the<br />

activities cannot f<strong>in</strong>d self<br />

improvement po<strong>in</strong>ts but can<br />

implement<br />

Good Control <strong>in</strong> all the<br />

activitities with support.<br />

Difficult <strong>to</strong> Control activities<br />

Role model for other<br />

Students <strong>in</strong> effective and<br />

Mean<strong>in</strong>gful<br />

Communication<br />

Good Communication<br />

with other Students and<br />

Tra<strong>in</strong>ers<br />

Adequate Communication<br />

with other Students and<br />

Tra<strong>in</strong>ers<br />

F<strong>in</strong>ds difficult <strong>to</strong><br />

Communicate and putt<strong>in</strong>g<br />

forward ideas<br />

Cont<strong>in</strong>ously gives<br />

Suggestion for Improvement<br />

and carry out .<br />

Consumes material<br />

appropriately .<br />

Follows all rules.<br />

Consumes Material<br />

appropriately with follow up<br />

>Layout is good<br />

>Important po<strong>in</strong>ts are<br />

emphasized well.<br />

>Brief Clear and Easy.<br />

> All important po<strong>in</strong>ts are<br />

mentioned.<br />

Frequently violate the rules.<br />

> There is lack <strong>of</strong> content.<br />

Careless <strong>in</strong> consum<strong>in</strong>g<br />

materials.<br />

> There is no po<strong>in</strong>t <strong>in</strong> report<br />

This is the evaluation sheet dur<strong>in</strong>g skill tra<strong>in</strong><strong>in</strong>g. Students<br />

are evaluated on the follow<strong>in</strong>g aspects:<br />

1) Work<strong>in</strong>g Method<br />

2) Time management<br />

3) Quality <strong>of</strong> work<br />

4) Safety management<br />

5) Team work<br />

6) Communication<br />

7) Cost management<br />

8) Knowledge test<br />

62


S<br />

A<br />

M<br />

P<br />

L<br />

E<br />

W<br />

O<br />

R<br />

K<br />

S<br />

H<br />

O<br />

P<br />

R<br />

E<br />

P<br />

O<br />

R<br />

T<br />

S<br />

AN INNOVATIVE APPROACH<br />

This is a sample daily report, written by each student after<br />

undergo<strong>in</strong>g skill tra<strong>in</strong><strong>in</strong>g. All students should write their<br />

report only <strong>in</strong> Eng<strong>in</strong>eer<strong>in</strong>g Script and also should expla<strong>in</strong><br />

us<strong>in</strong>g free hand draw<strong>in</strong>g<br />

63


W<br />

O<br />

R<br />

K<br />

S<br />

H<br />

O<br />

P<br />

M<br />

O<br />

D<br />

E<br />

L<br />

S<br />

2 nd Sem<br />

These are sample sheet metal models done by the<br />

students.<br />

64


ON THE JOB TRAINING AT<br />

PLANT<br />

( 2 years- 40 Weeks @ 10 weeks/semester<br />

1600 Hours)<br />

Students are deputed <strong>to</strong> plant tra<strong>in</strong><strong>in</strong>g from 2nd year<br />

start<strong>in</strong>g from 3rd Semester. This will be 40 weeks tra<strong>in</strong><strong>in</strong>g<br />

@10 weeks/semester.<br />

The basic th<strong>in</strong>k<strong>in</strong>g way <strong>of</strong> skill tra<strong>in</strong><strong>in</strong>g is that each<br />

student should knowledge tra<strong>in</strong><strong>in</strong>g followed by basic<br />

practical tra<strong>in</strong><strong>in</strong>g <strong>in</strong> the tra<strong>in</strong><strong>in</strong>g center before go<strong>in</strong>g <strong>to</strong> the<br />

plant tra<strong>in</strong><strong>in</strong>g.<br />

65


SKILL: Shop Floor ( On the Job Tra<strong>in</strong><strong>in</strong>g)<br />

Weld<br />

Assembly<br />

Pa<strong>in</strong>t<br />

Ma<strong>in</strong>tenance<br />

40 weeks( 1600 Hrs)<br />

@10 weeks/semester<br />

This ppt shows students undergo<strong>in</strong>g plant tra<strong>in</strong><strong>in</strong>g <strong>in</strong><br />

their respective trade area.<br />

66


Evaluation Method<br />

Self Evaluation ( Student ) - <strong>in</strong>dicate level <strong>of</strong> understand<strong>in</strong>g by circle ( o )<br />

Appraiser - Indicate the level achived by tick mark ( )<br />

SEMESTER TRADE BATCH<br />

Student Details<br />

PHOTO<br />

NAME<br />

STU NO<br />

1 2 3 4 5 6 7 8 9 10<br />

Attendance 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

A<br />

T<br />

T<br />

Discipl<strong>in</strong>e 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

I<br />

T<br />

Adaptability 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

U<br />

D<br />

E<br />

Team work 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

Health 1 2 3 4<br />

Overall ( Avg )<br />

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

K<br />

S<br />

N<br />

K<br />

O<br />

I<br />

W<br />

L<br />

L<br />

&<br />

Weeks<br />

Tra<strong>in</strong><strong>in</strong>g period<br />

Process/Area<br />

Skill Content<br />

Group Leader<br />

Tra<strong>in</strong>er<br />

Suggestion 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

Safety 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

Quality 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

Productivity 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

Cost 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

Overall ( Avg )<br />

Comments<br />

Sign ( STU )<br />

Sign ( GL )<br />

TTTI STUDENTS - ON JOB TRAINING EVALUATION<br />

While students are “on the job tra<strong>in</strong><strong>in</strong>g “ <strong>in</strong> the plant, the<br />

tra<strong>in</strong>er <strong>in</strong> the plant will make a weekly report <strong>of</strong> student<br />

performance. They should score m<strong>in</strong>imum 3 <strong>to</strong> be<br />

declared as passed from that process tra<strong>in</strong><strong>in</strong>g.<br />

The students evaluation is done on quarterly basis:<br />

1. Attendance<br />

2. Punctuality<br />

3. Skill Atta<strong>in</strong>ment<br />

4. Discipl<strong>in</strong>e<br />

5. Adoptability<br />

6. Team Work ( SQPC)<br />

7. Stam<strong>in</strong>a<br />

8. Kaizen m<strong>in</strong>d<br />

67


Conclusion:<br />

In this way, a student completes<br />

his 3 years ( 6333 hours) tra<strong>in</strong><strong>in</strong>g<br />

and becomes an <strong>in</strong>dustry <strong>ready</strong><br />

technician from day 1..<br />

68


INDUSTRY FEED BACK ON<br />

PERFORMANCE OF FIRST<br />

BATCH i.e 2010 PASSED<br />

STUDENT<br />

In order <strong>to</strong> asses the quality <strong>of</strong> performance <strong>of</strong> TTTI<br />

passed students <strong>in</strong> <strong>in</strong>dustry, we asked the concerned<br />

supervisor <strong>in</strong> the <strong>in</strong>dustry <strong>to</strong> rate our students<br />

performance vis-à-vis an equally qualified student from<br />

other <strong>in</strong>stitute ( Industrial Tra<strong>in</strong><strong>in</strong>g Institute-ITI).<br />

The rat<strong>in</strong>gs used are<br />

Poor 1<br />

Average 2<br />

Good 3<br />

Excellent 4<br />

69


This is feed back form taken from<br />

<strong>in</strong>dustry where our students are<br />

work<strong>in</strong>g for the past 1 year. The<br />

concerned supervisor was asked <strong>to</strong><br />

rate TTTI alumni performance with<br />

non TTTI ( i.e from other<br />

educational <strong>in</strong>stitution like Industrial<br />

Tra<strong>in</strong><strong>in</strong>g Institute-ITI) alumni<br />

work<strong>in</strong>g <strong>in</strong> the same grade and<br />

period.<br />

Rat<strong>in</strong>gs: 1 poor, 2 Average, 3 Good<br />

4 Excellent<br />

From the evaluation sheet it is clear<br />

that TTTI students are perform<strong>in</strong>g as<br />

per TTTI tra<strong>in</strong><strong>in</strong>g outcome<br />

expectations.<br />

70


THANK YOU<br />

71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!