Appendix 2 – Supplemental oil and gas information (unaudited)<br />

Other information<br />

The following table sets forth a breakdown of capitalized exploratory costs at year end 2006, 2005 and 2004 by category of exploratory<br />

activity:<br />

As of December 31 (in M€) 2006 2005 2004<br />

Projects with recent or planned exploratory activity 815 482 389<br />

Wells for which drilling is not <strong>com</strong>pleted 132 63 91<br />

Wells with drilling in past 12 months 341 200 126<br />

Wells with future exploratory activity firmly planned (a) 342 219 172<br />

Future exploratory drilling planned 248 156 148<br />

Other exploratory activity planned (b) 94 63 24<br />

Projects with <strong>com</strong>pleted exploratory activity 77 108 41<br />

Projects not requiring major capital expenditure 0 0 0<br />

Projects requiring major capital expenditure 77 108 41<br />

<strong>Total</strong> 892 590 430<br />

Number of wells at end of year 117 85 56<br />

(a) All projects included in this line require major capital expenditures.<br />

(b) As of the end of 2006, this relates to six wells whose continuing capitalization is justified by firmly planned seismic activity for two wells (subject to the <strong>com</strong>pletion of the legislative<br />

ratification of contracts regarding one well) and significant studies for the remaining four wells<br />

At the end of 2006, there was no amount of capitalized exploratory<br />

drilling cost that was associated with areas not requiring major<br />

capital expenditures before production could begin, where more<br />

than one year had elapsed since the <strong>com</strong>pletion of drilling.<br />

At the end of 2006, an amount of 77 M€ was associated with<br />

suspended wells in areas where major capital expenditures will be<br />

required and no future exploratory activity is firmly planned. This<br />

amount corresponds to seven projects (20 wells) and is mainly<br />

associated to the projects further described below:<br />

The first project (Usan) relates to a deepwater oil discovery in<br />

Nigeria for which eight wells were drilled between 2001 and 2005<br />

and 27 M€ were capitalized as of December 31, 2006. These<br />

exploration works allowed the Group to launch several<br />

development engineering studies in 2005 that went on in 2006.<br />

The national oil <strong>com</strong>pany NNPC has approved a development plan<br />

based on the construction of a Floating, Production, Storage and<br />

Offloading (FPSO) facility, for which a call for tenders was issued.<br />

Contractor bids are currently being evaluated.<br />

TOTAL – <strong>Registration</strong> Document 2006<br />

The second project (Laggan) relates to a deepwater gas discovery<br />

in the UK (west of the Shetland Islands), for which one well has<br />

been drilled in 2004 for a capitalized amount of 17 M€ as of<br />

December 31, 2006. In 2006, TOTAL and its partners have<br />

continued the geosciences studies required for the definition of the<br />

field development concept and the appraisal of potential new<br />

exploration areas. A task force was created with the neighboring<br />

permits operators in order to promote a global development<br />

strategy for the area.<br />

The third project (Bonga SW) relates to a deepwater oil discovery<br />

in Nigeria for which three wells were drilled between 2001 and<br />

2003 and for which 7 M€ were capitalized as of<br />

December 31, 2006. During 2006, together with the operator and<br />

co-venturers, the Group worked on the elaboration of a field<br />

development plan and continued negotiations aiming at possible<br />

unitization of the field with adjacent licenses. This led to the<br />

signature of a pre-unitization agreement with partners in 2006.<br />

The following table sets forth the allocation by age of capitalized exploratory costs as well as the number of corresponding wells.<br />

As of December 31 2006 2005 2004<br />

(in M€ and number of wells) amount number amount number amount number<br />

Wells for which drilling is not <strong>com</strong>pleted 132 19 63 12 91 13<br />

Wells with <strong>com</strong>pleted drilling<br />

• Less than 1 year 341 39 200 29 126 12<br />

• Between 1 and 4 years 392 53 304 40 198 29<br />

• Between 4 years and 8 years 19 4 23 4 15 2<br />

• More than 8 years 8 2 - - - -<br />

<strong>Total</strong> 892 117 590 85 430 56