03.06.2013 Views

AGENDA - 33rd meeting of Standing Committee on Safety in Coal ...

AGENDA - 33rd meeting of Standing Committee on Safety in Coal ...

AGENDA - 33rd meeting of Standing Committee on Safety in Coal ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tata Steel Ltd.<br />

No. <str<strong>on</strong>g>of</str<strong>on</strong>g> M<strong>in</strong>es Covered - Risk Assessment Methodology <str<strong>on</strong>g>of</str<strong>on</strong>g> OHSAS-18001 (Occupati<strong>on</strong>al<br />

Health & <strong>Safety</strong> Assessment Series) has been adopted <strong>in</strong> all the 5 (five) Underground<br />

M<strong>in</strong>es <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharia Divisi<strong>on</strong> as well as Open Cast m<strong>in</strong>es <str<strong>on</strong>g>of</str<strong>on</strong>g> West Bokaro.<br />

Major activities completed and acti<strong>on</strong> taken - Critical areas and critical activities were<br />

identified. Hazards associated with themwere evaluated and acti<strong>on</strong> plans drawn to derisk<br />

the activities. Acti<strong>on</strong>s have been taken <strong>in</strong> the areas <str<strong>on</strong>g>of</str<strong>on</strong>g> strata c<strong>on</strong>trol, ventilati<strong>on</strong>,<br />

ma<strong>in</strong>tenance <str<strong>on</strong>g>of</str<strong>on</strong>g> haulage plans and fall <str<strong>on</strong>g>of</str<strong>on</strong>g> pers<strong>on</strong>s, Movement and Ma<strong>in</strong>tenance <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

HEMM, Fly rock, Belt C<strong>on</strong>veyor, Dump yard, as these were identified as most <strong>in</strong> need <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

risk reducti<strong>on</strong>.<br />

J<strong>in</strong>dal Steel & Power Ltd. : Number <str<strong>on</strong>g>of</str<strong>on</strong>g> M<strong>in</strong>es Covered : One<br />

Major activities completed and acti<strong>on</strong> taken: Risk Assessment study was undertaken<br />

departmentally and major risks <strong>in</strong>volved activities were identified, suitably rank<strong>in</strong>g was<br />

given to the identified risks. All the identified risks and rank<strong>in</strong>gs were documented.<br />

M<strong>on</strong>itor<strong>in</strong>g <str<strong>on</strong>g>of</str<strong>on</strong>g> the identified risks and timely suitable acti<strong>on</strong>s were <strong>in</strong>itiated.<br />

Gujarat Industries Power Company Limited<br />

For the assessment, fr<strong>on</strong>t end supervisory <str<strong>on</strong>g>of</str<strong>on</strong>g>ficials are <strong>in</strong>cluded and the assessment<br />

made is discussed by superior <str<strong>on</strong>g>of</str<strong>on</strong>g>ficials.<br />

ICML<br />

Identificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> hazards – prioritizati<strong>on</strong> – c<strong>on</strong>trol measures prepared and<br />

implemented. M<strong>on</strong>itor<strong>in</strong>g is be<strong>in</strong>g d<strong>on</strong>e. C<strong>on</strong>t<strong>in</strong>uous up-gradati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Risk Assessment<br />

Bengal Emta <strong>Coal</strong> M<strong>in</strong>es Limited<br />

Close supervisi<strong>on</strong> to avoid load<strong>in</strong>g <str<strong>on</strong>g>of</str<strong>on</strong>g> large coal lumps above the bucket <str<strong>on</strong>g>of</str<strong>on</strong>g> dumpers.<br />

Regular <strong>in</strong>specti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> transport dumpers to ensure their road worth<strong>in</strong>ess. Regular checks<br />

to ensure that every dumper is provided with a competent driver hav<strong>in</strong>g license and a<br />

competent helper. Regular surveillance <str<strong>on</strong>g>of</str<strong>on</strong>g> transport road by security pers<strong>on</strong>nel to avoid<br />

pilferage <str<strong>on</strong>g>of</str<strong>on</strong>g> coal from dumpers by local pers<strong>on</strong>s and result<strong>in</strong>g accidents. A<br />

comprehensive tra<strong>in</strong><strong>in</strong>g programme default<strong>in</strong>g drivers is c<strong>on</strong>t<strong>in</strong>u<strong>in</strong>g<br />

46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!