could not cooled down due to seepage <str<strong>on</strong>g>of</str<strong>on</strong>g> excessive hot water (about 45 0 C) from all<br />

al<strong>on</strong>g the barrier with the available quantity <str<strong>on</strong>g>of</str<strong>on</strong>g> air for ventilati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> that old work<strong>in</strong>g.<br />

6. As per Post Mortem Report: “Death was due to Heat Exhausti<strong>on</strong> as a result <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

work<strong>in</strong>g <strong>in</strong> high Atmospheric Temperature” and also there were no traces <str<strong>on</strong>g>of</str<strong>on</strong>g> CO and<br />

deficiency <str<strong>on</strong>g>of</str<strong>on</strong>g> O2 , it is obvious that the death occurred due to excessive heat and high<br />

relative humidity. The atmospheric temperature was <strong>in</strong> between 41 o C-42 o C and the<br />

relative humidity was 100%. The body temperature went <strong>on</strong> ris<strong>in</strong>g further <strong>in</strong> course <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

<strong>in</strong>specti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the barriers <strong>in</strong> between Lodna and North Tisra at rise side ow<strong>in</strong>g to<br />

stay<strong>in</strong>g for a l<strong>on</strong>g durati<strong>on</strong> <strong>in</strong> the area with 100% humidity and no sweat could be<br />

evaporated. Further from the locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the bodies <str<strong>on</strong>g>of</str<strong>on</strong>g> the deceased (about 13 pillars<br />

away <strong>in</strong> the western side <str<strong>on</strong>g>of</str<strong>on</strong>g> the old work<strong>in</strong>g), it could be well <strong>in</strong>ferred that they had<br />

traveled over a l<strong>on</strong>g distance <strong>in</strong> search <str<strong>on</strong>g>of</str<strong>on</strong>g> their company for a c<strong>on</strong>siderable period <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

time, which caused severe fatigue and failed to return to the fresh air base.<br />

Recommendati<strong>on</strong>s: -<br />

1. Old work<strong>in</strong>gs must be secti<strong>on</strong>alized unless regular <strong>in</strong>specti<strong>on</strong> is required.<br />

2. Development must be d<strong>on</strong>e <strong>in</strong> panel system.<br />

3. Old work<strong>in</strong>gs, which are required to be <strong>in</strong>spected, should be ventilated properly.<br />

4. The Route <str<strong>on</strong>g>of</str<strong>on</strong>g> Old work<strong>in</strong>g <strong>in</strong>specti<strong>on</strong> shall be demarcated, clean and white wash &<br />

the entire cross galleries <str<strong>on</strong>g>of</str<strong>on</strong>g> the <strong>in</strong>specti<strong>on</strong> route should be fenced <str<strong>on</strong>g>of</str<strong>on</strong>g>f.<br />

5. “V” notch to be provided to measure flow <str<strong>on</strong>g>of</str<strong>on</strong>g> water from adjacent work<strong>in</strong>gs and<br />

regular m<strong>on</strong>itor<strong>in</strong>g should be d<strong>on</strong>e to ascerta<strong>in</strong> any <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>in</strong>crease <str<strong>on</strong>g>of</str<strong>on</strong>g> water flow and for<br />

tak<strong>in</strong>g further preventive measures.<br />

6. While <strong>in</strong>spect<strong>in</strong>g the old work<strong>in</strong>g by a team, no member should move <strong>in</strong> isolati<strong>on</strong><br />

without tak<strong>in</strong>g permissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the team leader and unless there is specific requirement,<br />

<strong>on</strong>ly normal / identified <strong>in</strong>specti<strong>on</strong> route should follow.<br />

7. If any member is separated dur<strong>in</strong>g the course <str<strong>on</strong>g>of</str<strong>on</strong>g> old work<strong>in</strong>g <strong>in</strong>specti<strong>on</strong>, the<br />

<strong>in</strong>formati<strong>on</strong> should be sent to surface, other <str<strong>on</strong>g>of</str<strong>on</strong>g>ficials present belowground<br />

immediately so that the search operati<strong>on</strong> can be carried out under able guidance.<br />

SCCL<br />

A ro<str<strong>on</strong>g>of</str<strong>on</strong>g> fall accident occurred at PK-1Inc., Manuguru <strong>in</strong>volv<strong>in</strong>g three fatal, two serious<br />

and <strong>on</strong>e reportable accident <strong>on</strong> 26.02.2009. Acti<strong>on</strong> was taken aga<strong>in</strong>st four executives and<br />

three supervisors bas<strong>in</strong>g <strong>on</strong> gravity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g>fence.<br />

Executives:<br />

1) Deputy.Manager -Penalty <str<strong>on</strong>g>of</str<strong>on</strong>g> withhold<strong>in</strong>g 2 <strong>in</strong>crements due <strong>on</strong><br />

01.04.10 and 01.04.11 for a period <str<strong>on</strong>g>of</str<strong>on</strong>g> two years i.e. upto 31.03.12 without<br />

cumulative effect.<br />

2) Under Manager -Penalty <str<strong>on</strong>g>of</str<strong>on</strong>g> withhold<strong>in</strong>g 1 <strong>in</strong>crement due <strong>on</strong><br />

01.04.2010 for a period <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e year i.e. upto 31.03.2011 without cumulative<br />

effect.<br />

3) Under Manager -Penalty <str<strong>on</strong>g>of</str<strong>on</strong>g> withhold<strong>in</strong>g 1 <strong>in</strong>crement due <strong>on</strong> 01.04.2010<br />

for a period <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e year i.e. upto 31.03.2011 without cumulative effect.<br />

4) Deputy General Manager (Manager) -Warn<strong>in</strong>g .<br />

Supervisors:<br />

1) Sr.MS-Proposed a penalty <str<strong>on</strong>g>of</str<strong>on</strong>g> reversi<strong>on</strong> to lower grade.<br />

2) OM- Proposed a penalty <str<strong>on</strong>g>of</str<strong>on</strong>g> reversi<strong>on</strong> to lower grade.<br />

3) MS - Proposed a penalty <str<strong>on</strong>g>of</str<strong>on</strong>g> reversi<strong>on</strong> to lower grade.<br />