Source: Study Team<br />

Figure 3-32 Side View of the Sec<strong>on</strong>d My Thuan Bridge<br />

The plan and profile drawings of Types 3 and 4 are shown in Figure 3-34 to Figure 3-37. Meanwhile, the<br />

quantities of superstructure and substructure of said types are shown in Table 3-19 and Table 3-.<br />

As discussed in Secti<strong>on</strong> 3.2.3(2) Geological Survey, the thick soft stratums are layered in the site ground<br />

and the bearing stratum was found at a great depth. The right bank (BH1 and LK4) is especially poor and<br />

the ground with N value of 50 appears <strong>on</strong>ly below -70 m. On the left bank (BH2 and LK1), the ground with<br />

N value of 40 appears to be below -40 m.<br />

Due to the ground c<strong>on</strong>diti<strong>on</strong>s, it was estimated that 32 bored piles with φ2.5 m and 80 m length are needed<br />

for the foundati<strong>on</strong> of A-shaped towers <strong>on</strong> both banks. On the other hand, 28 piles are needed for the single<br />

column towers <strong>on</strong> both banks.<br />

φ3.0m piles are also investigated for the foundati<strong>on</strong>, but there are no previous examples and the almost all<br />

of the necessary machines need to be imported from Japan or other overseas countries. Hence it is<br />

c<strong>on</strong>cluded there is no merit to adopt φ3.0m piles. φ2.5 m piles are adopted because of the former example<br />

of the Can Tho Bridge Project.<br />

The end piers of the main bridges are planned to be provided with φ1.5 m and 60 m l<strong>on</strong>g bored piles. Same<br />

type of pile foundati<strong>on</strong> is adopted for the approach viaducts. The approach viaducts are planned to be<br />

provided with φ 1.2 m and 60 m l<strong>on</strong>g bored piles. This plan is adopted from the design of the approach<br />

viaducts of the Can Tho Bridge.<br />

The ground around the bridge site is very soft so that the limit height of the embankment is decided to be<br />

5m based <strong>on</strong> the former examples of the embankment height around this area. The secti<strong>on</strong> of the approach<br />

road, which is higher than 5m, is planned as the approach viaduct. The bridge type of the viaduct is planned<br />

as the 40m span Super T girder bridge, which is widely adopted in Vietnam. In Figure 3-33, <strong>on</strong>e example<br />

of pier of the Nhat Tan Bridge is shown. The width of the Nhat Tan Bridge is 33.2m whereas the width of<br />

the Sec<strong>on</strong>d My Thuan Bridge is 31m so that the piers of this viaduct is slightly smaller than this pier but<br />

almost a same size of piers are needed for this viaduct.<br />

Quantities and c<strong>on</strong>structi<strong>on</strong> cost of the main bridge are summarized in Tables 3-19 and 3-20 . The general<br />

views of the main bridge are also shown in the following figures (Figures 3-34 to 3-37).<br />

In Figure 3-39 and Figure 3-40, the perspective images of the selected bridge type are superimposed.<br />

3-42