Taking into account the findings obtained, impacts <strong>on</strong> natural envir<strong>on</strong>ment and society<br />

within the proposed Project area were analyzed. Moreover, together with the informati<strong>on</strong><br />

collected in the field, the satellite imagery (Quickbird) was used for establishing the land use<br />

baseline of the Project area. Said land use baseline was utilized to estimate an inventory of assets<br />

that would be lost due to the Project.<br />

Finally, recommended measures for mitigating the impacts and required proceedings by the<br />

Project prop<strong>on</strong>ents in Vietnam for further <str<strong>on</strong>g>study</str<strong>on</strong>g> were addressed.<br />

2.4 Study Schedule<br />

C<strong>on</strong>sulting service c<strong>on</strong>tract for the <str<strong>on</strong>g>study</str<strong>on</strong>g> of the Sec<strong>on</strong>d My Thuan Bridge C<strong>on</strong>structi<strong>on</strong><br />

Project was agreed <strong>on</strong> August 12, 2010 between the Ministry of Ec<strong>on</strong>omy, Trade and Industry<br />

(METI) and Nipp<strong>on</strong> Koei Co., Ltd. and IHI Infrastructure System Co., Ltd. Joint Operati<strong>on</strong> (NK-IIS<br />

JO).<br />

This <str<strong>on</strong>g>study</str<strong>on</strong>g> c<strong>on</strong>sists of related activities in Japan and Vietnam. The Study Team was<br />

dispatched to Vietnam three times, as follows:<br />

1 st <str<strong>on</strong>g>study</str<strong>on</strong>g> period (August 25, 2010 to October 25, 2010): perform site rec<strong>on</strong>naissance<br />

and collecti<strong>on</strong> of relevant documents<br />

2 nd <str<strong>on</strong>g>study</str<strong>on</strong>g> period (December 13, 2010 to December 18, 2010): c<strong>on</strong>duct meeting with<br />

PMU My Thuan regarding the draft final report,<br />

3 rd <str<strong>on</strong>g>study</str<strong>on</strong>g> period (January 20, 2011 to January 27, 2011): presentati<strong>on</strong> of final report to<br />

Vietnamese counterpart.<br />

Throughout the <str<strong>on</strong>g>study</str<strong>on</strong>g>, the Study Team had several discussi<strong>on</strong>s with stakeholders such as<br />

MOT, PMU My Thuan, METI, JICA and JETRO, in order to c<strong>on</strong>sider their opini<strong>on</strong>s in the <str<strong>on</strong>g>study</str<strong>on</strong>g><br />

results.<br />

Study schedule is shown in Figure 2-3 below.<br />

2-8