(2) Pre-F/S for Planning of Ho Chi Minh-Can Tho Express Railway<br />

On the other hand, Vietnam Railway Authority in MOT approved the c<strong>on</strong>tract with<br />

c<strong>on</strong>sultants for the Pre-F/S (Formulati<strong>on</strong> of Investment Project of HCMC-Can Tho High Speed<br />

Railway). The <str<strong>on</strong>g>study</str<strong>on</strong>g> is supposed to be completed in December 2010. According to the incepti<strong>on</strong><br />

report of the Pre-F/S (June 2010), the railway is for high-speed trains with maximum design speed<br />

of 200 km/h and cargo trains. In the Pre-F/S, a bridge crossing the Tieng River, approximately 300<br />

m upstream of the existing My Thuan Bridge, is proposed. The route map of the high-speed railway<br />

in the Pre-F/S is shown in Figure 1-3 below.<br />

Source: Incepti<strong>on</strong> Report, Formulati<strong>on</strong> of Investment Project of HCMC-Can Tho High Speed Railway, June 2010<br />

Figure 1-3 Route Map of HCMC-Can Tho High Speed Railway<br />

1-8