- Page 1 and 2:
STUDY ON ECONOMIC PARTNERSHIP PROJE
- Page 3 and 4:
PREFACE This Report is prepared by
- Page 5 and 6:
1 2 3 NH30 Tien Giang Trung Luong -
- Page 7 and 8:
MOT Ministry of Transport MPI Minis
- Page 9 and 10:
(4) Implementation Program (I/P) to
- Page 11 and 12:
4.3 Environmental Legislations ....
- Page 13 and 14:
APPENDIX Appendix-I Drawings Append
- Page 15 and 16:
Figure 3-27 Steel Arch Bridge .....
- Page 17 and 18:
LIST OF TABLES Table 1-1 Balance of
- Page 19 and 20:
Table 5-16 FIRR Calculation .......
- Page 21 and 22:
1.2 Transport Sector in Vietnam 1.2
- Page 23 and 24:
North-South - Hanoi - HCMC Ring Roa
- Page 25 and 26:
Railway are listed as projects to b
- Page 27 and 28:
(2) Pre-F/S for Planning of Ho Chi
- Page 29 and 30:
No. Table 1-6 Ethnicity 1-10 Kinh (
- Page 31 and 32:
Table 1-7 Temperature Month 1 2 3 4
- Page 33 and 34:
Table 1-10 List of Industrial Devel
- Page 35 and 36:
Table 1-11 and Figure 1-4 show the
- Page 37 and 38:
Mekong Delta is divided by the Tien
- Page 39 and 40:
CHAPTER 2 STUDY METHOD 2.1 Scope of
- Page 41 and 42:
4 Nguyen Anh Duc Cost Estimator TED
- Page 43 and 44:
(b) Establish Appropriate Communica
- Page 45 and 46:
Information interface among each ex
- Page 47 and 48:
(Works in Vietnam) 1st Work in Viet
- Page 49 and 50:
Table 2-5 Record of Major Meetings
- Page 51 and 52:
NH No.30 Tien Giang River NH No.80
- Page 53 and 54:
3.2 Study Required for Decision on
- Page 55 and 56:
3.2.2 Traffic Demand Forecast (1) A
- Page 57 and 58:
My Thuan 2nd My Thuan bridge Can Th
- Page 59 and 60:
(b) Vehicle Composition by Survey S
- Page 61 and 62:
(4) Producing Present OD Matrices (
- Page 63 and 64:
9.00 8.00 7.00 6.00 5.00 4.00 3.00
- Page 65 and 66:
Source: Study Team Truck Traffic/da
- Page 67 and 68:
3.2.3 Natural Conditions Survey (1)
- Page 69 and 70:
To Trung Luong To Can Tho Source: R
- Page 71 and 72:
Source: Study Team Figure 3-16 Bori
- Page 73 and 74:
(3) Hydrological Survey In My Tho,
- Page 75 and 76:
Table 3-12 Water level of the Tien
- Page 77 and 78:
Month Levels I II III IV V VI VII V
- Page 79 and 80:
Source: Inspection and Maintenance
- Page 81 and 82:
Source: Study Team Note: Upstream i
- Page 83 and 84:
Source: TEDI Figure 3-23 Bathymetri
- Page 85 and 86:
2. Suspension Bridge: Before the de
- Page 87 and 88:
Source: Study Team Source: Study Te
- Page 89 and 90:
The bridge type comparison based on
- Page 91 and 92:
Source: Study Team Figure 3-32 Side
- Page 93 and 94:
Table 3-19 Quantities and Construct
- Page 95 and 96:
Source: Study team Figure 3-35 Gene
- Page 97 and 98:
Source: Study Team Figure 3-37 Gene
- Page 99 and 100:
Source: Study Team Figure 3-39 Pers
- Page 101 and 102:
Table 3-21 Traffic Demand and Requi
- Page 103 and 104:
PCU/hour 7000 6500 6000 5500 5000 4
- Page 105 and 106:
Grade (%) Table 3-24 Study of Criti
- Page 107 and 108:
sides, hence, 5.5 m in total. The f
- Page 109 and 110:
Cross section of two-lane ramp: Car
- Page 111 and 112:
3 cm: Roughening asphalt to make fr
- Page 113 and 114:
Source: Study Team Figure 3-49 Traf
- Page 115 and 116:
Table 3-33 Status of Adjacent Expre
- Page 117 and 118:
However, it was proposed to cancel
- Page 119 and 120:
iii) Sand Drain (SD) Sand drain is
- Page 121 and 122:
Source: Study Team Figure 3-56 Cons
- Page 123 and 124:
Source: Study Team (2) Foundation P
- Page 125 and 126:
Source: Study Team Source: Study Te
- Page 127 and 128: (c) Cement Source: Study Team Figur
- Page 129 and 130: (6) Construction Schedule The total
- Page 131 and 132: 4. Emergency Management 5. Patrols
- Page 133 and 134: (3) Maintenance of Road Road mainte
- Page 135 and 136: No. Total Area (ha) Residential Lan
- Page 137 and 138: No. Poor Households (income less th
- Page 139 and 140: The rate of grid connection is 100%
- Page 141 and 142: Pollution 4.2 Positive Effects From
- Page 143 and 144: Social Environment Resettlement B L
- Page 145 and 146: Finalized Route Table 4-17 Number o
- Page 147 and 148: No. Affected People (AP): APs are t
- Page 149 and 150: 10 Vibration Emitted from Road in P
- Page 151 and 152: which is required to be implemented
- Page 153 and 154: 4.4 Actions Taken by Project Propon
- Page 155 and 156: Source: Study Team (3) Construction
- Page 157 and 158: (d) Price variation The following p
- Page 159 and 160: 5.2 Economic and Financial Analyses
- Page 161 and 162: Source: Study Team (4) Economic Eva
- Page 163 and 164: (c) Sensitivity Analysis Source: St
- Page 165 and 166: (4) Financial Return of Total Inves
- Page 167 and 168: (1) Alternative No. 1: One Package
- Page 169 and 170: Table 6-2 Comparison among Alternat
- Page 171 and 172: Event/ Milestone Time/ Period Excha
- Page 173 and 174: Table 6-4 Anticipated Measures Agai
- Page 175 and 176: PMU My Thuan is a state agency whic
- Page 177: In this preparation stage of the pr
- Page 181 and 182: cast-in-place piles. Such equipment