(d) Price variati<strong>on</strong><br />

The following price variati<strong>on</strong> rate shall be used for this <str<strong>on</strong>g>study</str<strong>on</strong>g>:<br />

F/C: 2.0% per annum<br />

L/C: 9.0% per annum<br />

(10) Project Cost<br />

The project cost is estimated to be USD 749 milli<strong>on</strong> as shown in Table 5-3.<br />

Cost Items<br />

Table 5-3 Project Cost<br />

5-4<br />

Remarks F/C L/C Amount<br />

(Thousand USD)<br />

Ⅰ C<strong>on</strong>structi<strong>on</strong> Cost 1+2+3+4+5 253,428 209,642 463,070<br />

1 Main Bridge 194,071 83,173 277,244<br />

2 Approach Bridge 39,268 91,625 130,893<br />

3 Approach Road and IC 5,744 22,978 28,722<br />

4 Mobilizati<strong>on</strong> & Demobilizati<strong>on</strong> (1+2+3)*5% 11,954 9,889 21,843<br />

5 Insurance (1+2+3)*1% 2,391 1,978 4,369<br />

Ⅱ Envir<strong>on</strong>mential & Social C<strong>on</strong>siderati<strong>on</strong> Cost 0 41,662 41,662<br />

Ⅲ Administrati<strong>on</strong> Cost Ⅰ*7.5% 0 34,730 34,730<br />

Ⅳ C<strong>on</strong>sulting Fee Ⅰ*7.5% 20,838 13,892 34,730<br />

Ⅴ Price Escalati<strong>on</strong> (Ⅰ+Ⅱ+Ⅲ+Ⅳ)*A%^4 22,608 123,444 146,052<br />

Ⅵ Physical C<strong>on</strong>tingency (Ⅰ+Ⅱ+Ⅲ+Ⅳ)*5% 13,713 14,996 28,710<br />

Project Cost Ⅰ+Ⅱ+Ⅲ+Ⅳ+Ⅴ+Ⅵ 310,588 438,367 748,954<br />

Source: Study Team<br />

5.1.2 Annual Disbursement Schedule<br />

As a result of estimati<strong>on</strong> of project cost in the previous paragraph, annual project cost determined<br />

from c<strong>on</strong>structi<strong>on</strong> work schedule for respective years.<br />

The following Table 5-4 shows the annual project cost.<br />

Cost Items<br />

Total<br />

C<strong>on</strong>structi<strong>on</strong> Cost 463,070<br />

Table 5-4 Annualized project cost allocati<strong>on</strong>s<br />

(Thousand USD) Rate Cost Rate Cost Rate Cost Rate Cost Rate Cost Rate Cost<br />

Main Bridge 277,244 10.0% 27,724 30.0% 83,173 40.0% 110,897 20.0% 55,449<br />

Approach Bridge 130,893 10.0% 13,089 40.0% 52,357 40.0% 52,357 10.0% 13,089<br />

Approach Road and IC 28,722 20.0% 5,744 60.0% 17,233 10.0% 2,872 10.0% 2,872<br />

Mobilizati<strong>on</strong><br />

& Demobilizati<strong>on</strong><br />

21,843 50.0% 10,921 50.0% 10,921<br />

Insurance 4,369 100.0% 4,369<br />

Envir<strong>on</strong>mential<br />

& Social C<strong>on</strong>siderati<strong>on</strong> Cost<br />

41,662 30.0% 12,498 50.0% 20,831 20.0% 8,332<br />

Administrati<strong>on</strong> Cost 34,730 25.0% 8,683 25.0% 8,683 25.0% 8,683 25.0% 8,683<br />

C<strong>on</strong>sulting Fee 34,730 50.0% 17,365 50.0% 17,365<br />

2011 2012 2013 2014 2015 2016<br />

Price Escalati<strong>on</strong> 146,052 25.0% 36,513 25.0% 36,513 25.0% 36,513 25.0% 36,513<br />

Physical C<strong>on</strong>tingency 28,710 3.0% 868 5.2% 1,493 15.9% 4,568 29.6% 8,489 30.4% 8,740 15.9% 4,551<br />

Source: Study Team<br />

748,954 2.4% 18,233 4.2% 31,357 17.7% 132,443 28.7% 214,780 29.4% 220,063 17.6% 132,078