02.06.2013 Views

study on economic partnership projects

study on economic partnership projects

study on economic partnership projects

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Source: Study Team<br />

(3) C<strong>on</strong>structi<strong>on</strong> Cost<br />

(a) Quantity Calculati<strong>on</strong>s<br />

Quantities are either calculated or assumed based <strong>on</strong> rough design calculati<strong>on</strong>s and previous data of<br />

the same type and scale bridges.<br />

(b) Unit Prices<br />

Unit prices are derived c<strong>on</strong>sidering past c<strong>on</strong>tract prices in Vietnam, north and south regi<strong>on</strong>al unit<br />

price differences, recent years’ steel and fuel cost increases, sliding scales for labor cost, etc. Unit<br />

prices include direct c<strong>on</strong>structi<strong>on</strong> costs such as labor cost, material and equipment cost, inspecti<strong>on</strong><br />

cost, etc. as well as indirect c<strong>on</strong>structi<strong>on</strong> costs such as administrati<strong>on</strong> cost, safety cost, profit, tax,<br />

etc.<br />

(c) Main Bridge<br />

The main bridge’s cost includes the required electrical and lighting equipment, maintenance and<br />

survey equipment, m<strong>on</strong>itoring equipment, and fire preventi<strong>on</strong> and fighting system.<br />

(d) Interchanges<br />

Costs for the interchanges are calculated including the cost for the toll gates.<br />

(e) Mobilizati<strong>on</strong> and Demobilizati<strong>on</strong><br />

Mobilizati<strong>on</strong> and demobilizati<strong>on</strong> shall be 5% of the total amount of direct and indirect c<strong>on</strong>structi<strong>on</strong><br />

costs.<br />

(f) C<strong>on</strong>structi<strong>on</strong> Insurance Premium<br />

C<strong>on</strong>structi<strong>on</strong> insurance premium shall be 1% of the total amount of direct and indirect c<strong>on</strong>structi<strong>on</strong><br />

costs.<br />

(4) Envir<strong>on</strong>mental and Social C<strong>on</strong>siderati<strong>on</strong> Cost<br />

Secti<strong>on</strong> 4.3 of this report describes in detail the coverage of envir<strong>on</strong>mental and social c<strong>on</strong>siderati<strong>on</strong>,<br />

which includes HIV preventi<strong>on</strong>.<br />

(5) Project Management Cost<br />

Project management cost shall be 7.5% of the c<strong>on</strong>structi<strong>on</strong> cost.<br />

5-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!