02.06.2013 Views

study on economic partnership projects

study on economic partnership projects

study on economic partnership projects

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

No. Commune<br />

Women Have Legal Title to Land<br />

and Property<br />

√=Yes<br />

Table 4-13 Gender C<strong>on</strong>siderati<strong>on</strong><br />

Women C<strong>on</strong>tribute to<br />

Household Income<br />

√=Yes<br />

4-7<br />

Women’s C<strong>on</strong>tributi<strong>on</strong> to<br />

Household Income<br />

%<br />

Income Generati<strong>on</strong><br />

Activities by Woman<br />

1 Hoa Hung √ √ - -<br />

2 Tan Hoa √ √ - -<br />

3 Tan Hoi √ √ 30~35 Garden<br />

Source: Study Team<br />

Community Assistance: No community assistance program is under way in Hoa Hung Commune.<br />

An NGO from USA has been implementing a library c<strong>on</strong>structi<strong>on</strong> project in Tan Hoa. Meanwhile,<br />

a project <strong>on</strong> developing agricultural technique has been initiated by the Government of Canada in<br />

Tan Hoi Commune. Community assistance in surveyed communes is summarized in Table 4-14.<br />

No. Commune<br />

Name of Community Development<br />

Project<br />

Table 4-14 Community Assistance<br />

Name of the Organizati<strong>on</strong> Type of the Project<br />

1 Hoa Hung - -<br />

2 Tan Hoa NGO (US) C<strong>on</strong>structing Library<br />

3 Tan Hoi<br />

Source: Study Team<br />

4.1.5 Without Project Case<br />

Canada Developing Agricultural Technique<br />

(Mango Plantati<strong>on</strong>)<br />

With regard to the forecast of the future c<strong>on</strong>diti<strong>on</strong> for the “without project case”, positive and<br />

negative impacts are expected. Positive impacts are c<strong>on</strong>sidered if there will be no resettlement<br />

required due to any land acquisiti<strong>on</strong> for c<strong>on</strong>structing the road. On the other hand, the negative<br />

impacts c<strong>on</strong>sidered are as follows:<br />

If the Sec<strong>on</strong>d My Thuan Bridge is not c<strong>on</strong>structed, the traffic al<strong>on</strong>g the My Thuan-Can<br />

Tho Expressway would divert to NH1 including the existing MyThuan Bridge and the<br />

Nati<strong>on</strong>al Highway No. 80, in order to cross the Tien Gieng River. C<strong>on</strong>sidering further<br />

increase in traffic volume after the opening of Trung Loung-Can Tho Expressway, the<br />

intersecti<strong>on</strong> of the existing four-lane My Thuan Bridge and two-lane Nati<strong>on</strong>al Highway<br />

No. 80 would become a traffic bottleneck and the level of service of expressway would<br />

be downgraded due to traffic c<strong>on</strong>gesti<strong>on</strong>.<br />

C<strong>on</strong>sequently, transportati<strong>on</strong> including the distributi<strong>on</strong> system would be disturbed and<br />

this would negatively affect the ec<strong>on</strong>omic expansi<strong>on</strong> of the regi<strong>on</strong> in the future.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!