3.2.7 O&M Plan<br />

(1) Instituti<strong>on</strong>al Structure and Capacity for O&M<br />

The O&M organizati<strong>on</strong>s under MOT generally include the Directorate of Road for<br />

Vietnam (DRVN) or Vietnam Expressway Corporati<strong>on</strong> (VEC). However, the HCMC-Trung Lu<strong>on</strong>g<br />

Expressway, which is a secti<strong>on</strong> of HCMC-Can Tho Expressway and is temporarily operated, is<br />

separately managed by PMU My Thuan, as directly authorized by MOT. This is in accordance with<br />

Decisi<strong>on</strong> No. 195/QD-BGTVT of MOT dated January 21, 2010 (Regulati<strong>on</strong> <strong>on</strong> Temporary<br />

Management and Operati<strong>on</strong> of HCMC-Trung Lu<strong>on</strong>g Expressway). The operati<strong>on</strong> would be smooth<br />

if all secti<strong>on</strong>s of HCMC-Can Tho Expressway can be managed in a comprehensive manner, except<br />

for the Trun Lu<strong>on</strong>g-My Thuan Secti<strong>on</strong>, which is to be implemented under BOT scheme. Therefore,<br />

the O&M organizati<strong>on</strong> plan for the Sec<strong>on</strong>d My Thuan Bridge, which is a secti<strong>on</strong> of HCMC-Can<br />

Tho Expressway, is proposed to be taken out from the temporary management plan of<br />

HCMC-Trung Lu<strong>on</strong>g Expressway. It was c<strong>on</strong>firmed that PMU My Thuan intends to establish O&M<br />

organizati<strong>on</strong>s for the expressway, including the Sec<strong>on</strong>d My Thuan Bridge and My Thuan- Can Tho<br />

secti<strong>on</strong>s.<br />

The temporary management and operati<strong>on</strong> organizati<strong>on</strong> includes the Expressway<br />

Management Center c<strong>on</strong>sisting of 22 pers<strong>on</strong>nel, which is expected to manage the check point force,<br />

traffic patrolling force, traffic regulating force, and security and facility protecting force as shown in<br />

Figure 3-65 below.<br />

PMU My Thuan<br />

Expressway Management Center<br />

PMU My Thuan + Additi<strong>on</strong>al Staff:22<br />

Check Point Force Traffic Patrolling force Traffic-regulating force Security and facitlity protecting force<br />

Traffic Police:36 Traffic Police:18 Traffic Police:24 Management Center:2<br />

Transport Inspector:18 Transport Inspector:18 Transport Inspector:18 Local Police:26<br />

Source: Prepared by Study Team based <strong>on</strong> Report No.15/PMUMT-TCB, PMU My Thuan, 04/01/2010<br />

Figure 3-66 Organizati<strong>on</strong> of Temporary Management for HCMC-Trung Lu<strong>on</strong>g Expressway<br />

The operati<strong>on</strong> of the Sec<strong>on</strong>d My Thuan Bridge includes the following tasks. PMU My<br />

Thuan, the operator, shall establish appropriate units to undertake such tasks:<br />

1. Asset Management<br />

2. Traffic C<strong>on</strong>trol & Surveillance<br />

3. Informati<strong>on</strong> Management<br />

3-81