- Page 1 and 2: STUDY ON ECONOMIC PARTNERSHIP PROJE
- Page 3 and 4: PREFACE This Report is prepared by
- Page 5 and 6: 1 2 3 NH30 Tien Giang Trung Luong -
- Page 7 and 8: MOT Ministry of Transport MPI Minis
- Page 9 and 10: (4) Implementation Program (I/P) to
- Page 11: 4.3 Environmental Legislations ....
- Page 15 and 16: Figure 3-27 Steel Arch Bridge .....
- Page 17 and 18: LIST OF TABLES Table 1-1 Balance of
- Page 19 and 20: Table 5-16 FIRR Calculation .......
- Page 21 and 22: 1.2 Transport Sector in Vietnam 1.2
- Page 23 and 24: North-South - Hanoi - HCMC Ring Roa
- Page 25 and 26: Railway are listed as projects to b
- Page 27 and 28: (2) Pre-F/S for Planning of Ho Chi
- Page 29 and 30: No. Table 1-6 Ethnicity 1-10 Kinh (
- Page 31 and 32: Table 1-7 Temperature Month 1 2 3 4
- Page 33 and 34: Table 1-10 List of Industrial Devel
- Page 35 and 36: Table 1-11 and Figure 1-4 show the
- Page 37 and 38: Mekong Delta is divided by the Tien
- Page 39 and 40: CHAPTER 2 STUDY METHOD 2.1 Scope of
- Page 41 and 42: 4 Nguyen Anh Duc Cost Estimator TED
- Page 43 and 44: (b) Establish Appropriate Communica
- Page 45 and 46: Information interface among each ex
- Page 47 and 48: (Works in Vietnam) 1st Work in Viet
- Page 49 and 50: Table 2-5 Record of Major Meetings
- Page 51 and 52: NH No.30 Tien Giang River NH No.80
- Page 53 and 54: 3.2 Study Required for Decision on
- Page 55 and 56: 3.2.2 Traffic Demand Forecast (1) A
- Page 57 and 58: My Thuan 2nd My Thuan bridge Can Th
- Page 59 and 60: (b) Vehicle Composition by Survey S
- Page 61 and 62: (4) Producing Present OD Matrices (
- Page 63 and 64:
9.00 8.00 7.00 6.00 5.00 4.00 3.00
- Page 65 and 66:
Source: Study Team Truck Traffic/da
- Page 67 and 68:
3.2.3 Natural Conditions Survey (1)
- Page 69 and 70:
To Trung Luong To Can Tho Source: R
- Page 71 and 72:
Source: Study Team Figure 3-16 Bori
- Page 73 and 74:
(3) Hydrological Survey In My Tho,
- Page 75 and 76:
Table 3-12 Water level of the Tien
- Page 77 and 78:
Month Levels I II III IV V VI VII V
- Page 79 and 80:
Source: Inspection and Maintenance
- Page 81 and 82:
Source: Study Team Note: Upstream i
- Page 83 and 84:
Source: TEDI Figure 3-23 Bathymetri
- Page 85 and 86:
2. Suspension Bridge: Before the de
- Page 87 and 88:
Source: Study Team Source: Study Te
- Page 89 and 90:
The bridge type comparison based on
- Page 91 and 92:
Source: Study Team Figure 3-32 Side
- Page 93 and 94:
Table 3-19 Quantities and Construct
- Page 95 and 96:
Source: Study team Figure 3-35 Gene
- Page 97 and 98:
Source: Study Team Figure 3-37 Gene
- Page 99 and 100:
Source: Study Team Figure 3-39 Pers
- Page 101 and 102:
Table 3-21 Traffic Demand and Requi
- Page 103 and 104:
PCU/hour 7000 6500 6000 5500 5000 4
- Page 105 and 106:
Grade (%) Table 3-24 Study of Criti
- Page 107 and 108:
sides, hence, 5.5 m in total. The f
- Page 109 and 110:
Cross section of two-lane ramp: Car
- Page 111 and 112:
3 cm: Roughening asphalt to make fr
- Page 113 and 114:
Source: Study Team Figure 3-49 Traf
- Page 115 and 116:
Table 3-33 Status of Adjacent Expre
- Page 117 and 118:
However, it was proposed to cancel
- Page 119 and 120:
iii) Sand Drain (SD) Sand drain is
- Page 121 and 122:
Source: Study Team Figure 3-56 Cons
- Page 123 and 124:
Source: Study Team (2) Foundation P
- Page 125 and 126:
Source: Study Team Source: Study Te
- Page 127 and 128:
(c) Cement Source: Study Team Figur
- Page 129 and 130:
(6) Construction Schedule The total
- Page 131 and 132:
4. Emergency Management 5. Patrols
- Page 133 and 134:
(3) Maintenance of Road Road mainte
- Page 135 and 136:
No. Total Area (ha) Residential Lan
- Page 137 and 138:
No. Poor Households (income less th
- Page 139 and 140:
The rate of grid connection is 100%
- Page 141 and 142:
Pollution 4.2 Positive Effects From
- Page 143 and 144:
Social Environment Resettlement B L
- Page 145 and 146:
Finalized Route Table 4-17 Number o
- Page 147 and 148:
No. Affected People (AP): APs are t
- Page 149 and 150:
10 Vibration Emitted from Road in P
- Page 151 and 152:
which is required to be implemented
- Page 153 and 154:
4.4 Actions Taken by Project Propon
- Page 155 and 156:
Source: Study Team (3) Construction
- Page 157 and 158:
(d) Price variation The following p
- Page 159 and 160:
5.2 Economic and Financial Analyses
- Page 161 and 162:
Source: Study Team (4) Economic Eva
- Page 163 and 164:
(c) Sensitivity Analysis Source: St
- Page 165 and 166:
(4) Financial Return of Total Inves
- Page 167 and 168:
(1) Alternative No. 1: One Package
- Page 169 and 170:
Table 6-2 Comparison among Alternat
- Page 171 and 172:
Event/ Milestone Time/ Period Excha
- Page 173 and 174:
Table 6-4 Anticipated Measures Agai
- Page 175 and 176:
PMU My Thuan is a state agency whic
- Page 177 and 178:
In this preparation stage of the pr
- Page 179 and 180:
CHAPTER 8 TECHNOLOGICAL ADVANTAGES
- Page 181 and 182:
cast-in-place piles. Such equipment