02.06.2013 Views

study on economic partnership projects

study on economic partnership projects

study on economic partnership projects

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NH80<br />

Source: Study Team<br />

To Can Tho City<br />

To Vinh L<strong>on</strong>g City<br />

3-67<br />

NH80<br />

Figure 3-52 Design of C<strong>on</strong>necti<strong>on</strong> at Ending Point (South Side)<br />

(c) Locati<strong>on</strong> of Toll Gates of the Project<br />

To Trung Lu<strong>on</strong>g<br />

To Vinh L<strong>on</strong>g City<br />

To Can Tho City<br />

According to BOT F/S, closed toll collecti<strong>on</strong> system is proposed, which involves charging<br />

toll fees based <strong>on</strong> actual traveled length of expressway. Therefore, toll gates were planned to be<br />

c<strong>on</strong>structed at An Thai Trung Interchange at NH30, temporary c<strong>on</strong>necti<strong>on</strong> point with NH1 al<strong>on</strong>g<br />

Trung Lu<strong>on</strong>g-My Thuan Expressway, c<strong>on</strong>necti<strong>on</strong> point at NH80, Tan Phu Interchange, Hoa Phu<br />

Interchange, and Cha Va Interchange al<strong>on</strong>g My Thuan-Can Tho Expressway, as shown in Figure<br />

3-53.<br />

NH30<br />

Source: Study Team<br />

NH80<br />

NH1<br />

Toll Gate at Rampway<br />

Toll Gate at Main Route<br />

Figure 3-53 Original Plan of Toll Gates in Phase 1 by F/S

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!