study on economic partnership projects
study on economic partnership projects
study on economic partnership projects
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
NH80<br />
Source: Study Team<br />
To Can Tho City<br />
To Vinh L<strong>on</strong>g City<br />
3-67<br />
NH80<br />
Figure 3-52 Design of C<strong>on</strong>necti<strong>on</strong> at Ending Point (South Side)<br />
(c) Locati<strong>on</strong> of Toll Gates of the Project<br />
To Trung Lu<strong>on</strong>g<br />
To Vinh L<strong>on</strong>g City<br />
To Can Tho City<br />
According to BOT F/S, closed toll collecti<strong>on</strong> system is proposed, which involves charging<br />
toll fees based <strong>on</strong> actual traveled length of expressway. Therefore, toll gates were planned to be<br />
c<strong>on</strong>structed at An Thai Trung Interchange at NH30, temporary c<strong>on</strong>necti<strong>on</strong> point with NH1 al<strong>on</strong>g<br />
Trung Lu<strong>on</strong>g-My Thuan Expressway, c<strong>on</strong>necti<strong>on</strong> point at NH80, Tan Phu Interchange, Hoa Phu<br />
Interchange, and Cha Va Interchange al<strong>on</strong>g My Thuan-Can Tho Expressway, as shown in Figure<br />
3-53.<br />
NH30<br />
Source: Study Team<br />
NH80<br />
NH1<br />
Toll Gate at Rampway<br />
Toll Gate at Main Route<br />
Figure 3-53 Original Plan of Toll Gates in Phase 1 by F/S