Plant inspections <strong>2009</strong>: 15 completed orders for<br />
inspections during major shutdowns, 5 new orders<br />
In the beginning of <strong>2009</strong> we carried out an order for the condition<br />
assessment of the supporting structure components of the<br />
Bleilochtalsperre (a dam) for VATTENFALL. For the VATTENFALLpower<br />
plants Reuter/Berlin and Schwarze Pumpe, Stadtwerke<br />
Chemnitz, the refi neries PCK Schwedt and MiRO Karlsruhe as<br />
well as the chemical plants DOW Chemical Böhlen and SKW<br />
Piesteritz we completed inspection orders for boiler units, pipes,<br />
turbine components, drums, and fi ttings. Since we have carried<br />
out work for these plants for many years, we plan the test<br />
program for the recurring inspections with the operator ahead<br />
of time. We are also responsible for the lifetime monitoring<br />
measures in these facilities and can make recommendations for<br />
the continued operation from our test results. For the fi rst time<br />
we received orders from E.ON (Thermal Power Station Jena) and<br />
EVONIK (Wood-fi red Power Station Dresden-Niedersedlitz).<br />
Within the <strong>Siempelkamp</strong> Group we provided competent support<br />
for production and quality control tasks (e.g., for <strong>Siempelkamp</strong>’s<br />
machinery and plant unit during the open-die forging press<br />
project for Hunan Goldsky/China and Malyn Paper Mill/Ukraine).<br />
With damage examinations on power plant components we<br />
were commissioned 15 times in <strong>2009</strong> (e.g., by VATTENFALL KW<br />
Boxberg, VEM Austria and TÜV Süd Industrie Service).<br />
For 2010 we have already been presented with inquiries for plant<br />
inspections and lifetime monitoring tasks during the major shutdowns<br />
of MiRO Karlsruhe, DOW Chemical Böhlen, E.ON Kraftwerk<br />
Jena and MIBRAG-Kraftwerk Mumsdorf.<br />
<strong>Siempelkamp</strong> Nuclear technology<br />
The group specializing in plant inspections also contributes to our services. This group’s core competences<br />
include: in-service inspections of power plants and their components according to legal requirements<br />
and guidelines for the lifetime monitoring from proven guidelines such as VGB 509L including a con-<br />
cluding degree of fatigue assessment. We offer our customers from the area of power engineering and<br />
the chemical and petrochemical industries comprehensive services during plant downtimes. These include<br />
the coordination of different subsections such as scaffolding, grinding operations, testing and insulating<br />
as well as the expertise in regard to long-term stability of the used heat-resistant materials and their<br />
welded connections as well as potential damage mechanisms under operational stresses. These types of<br />
services are only possible due to the close interaction of the business activities in the groups specializing<br />
in material and component testing and plant inspection and represent a clear competitive advantage!<br />
Our creep rupture test lab has more than 50 years of experience. With 145 creep rupture test machines,<br />
our lab has the largest testing capacity in the area of non-university research institutions in Germany.<br />
Services<br />
Strength calculation for reactor<br />
pressure vessel head lifting equipment<br />
Temperature layering in the area<br />
of a pipe fi tting<br />
Strength calculation for the retaining wall of the Bleilochtalsperre (dam)<br />