Furthermore, with our process computers we provide the central collection and visualization of all relevant process data of a power<br />

plant. The process computer, the heart of the plant monitoring system, collects all process signals necessary for the operation of the<br />

plant. Signals of different control units are linked and evaluated so that all required information about the different systems can be<br />

presented to the plant operator online. The process computing system is primarily used for the visualization of the plant condition as<br />

well as for the evaluation of measured values and messages. Computing systems in older power plants are especially prone to exhibit<br />

a typical heterogeneous IT landscape of many independently working partial systems.<br />

By integrating these partial systems into a new process computing system, the customer can save tremendous costs and previously<br />

made investments can be used longer. The prerequisite is a process computing system which is designed as an open system and which<br />

has many interfaces that are ready for use or easily adaptable. We plan and deliver process computing systems for the monitoring and<br />

control of operations. Our systems are optimized to the location of use and can be used with the equipment of any manufacturer. They<br />

reduce investment costs, ensure the spare parts supply and support customers in the optimum operation of their plants.<br />

Large order for the replacement of a process computer<br />

in <strong>2009</strong><br />

The fi rst phase of the large project involving the replacement of<br />

the process computer at the nuclear power plant Mühleberg in<br />

<strong>Siempelkamp</strong> Nuclear technology<br />

Switzerland was completed, as scheduled, in <strong>2009</strong>. The computer<br />

has started operation. During the second phase of the project,<br />

two additional neighboring systems will be connected to the<br />

process computer so that the order will be completed in 2010.<br />

Waterfall display – visualization technology of measured values and ratings<br />

Services<br />

96 97