Stud ud tensioning sioning machine during ng use at a nuclear pow power plant la<br />

Stud tensioning machines<br />

Stud tensioning machines in <strong>2009</strong> – eight completed<br />

projects, nine new orders<br />

The milestones in <strong>2009</strong> in the area of stud tensioning machines<br />

included the completion of two projects for the French plant<br />

operator EDF. Next to upgrading a plant we supplied new stud<br />

tensioners for which a new technical concept was predominant.<br />

Instead of using a massive support ring made of forged steel, we<br />

designed this component group in sandwich construction. This<br />

ring is equipped with a total of 58 assembled tensioning units<br />

and has to withstand a pressure of up to 2,000 bar.<br />

Further component deliveries that went to the Czech Republic,<br />

China and Russia as well as the completion of a modifi cation<br />

project in South Korea show how well-positioned our company<br />

is in this market niche.<br />

Despite partly drawn-out decision processes which were intensifi<br />

ed by the global fi nancial crisis, the ambitious plans for new<br />

constructions and equipment upgrades in many countries resulted<br />

in a successful total order quantity for us in <strong>2009</strong>. Noteworthy is<br />

an order from France for the supply of a new stud tensioning<br />

machine and the upgrading of eight plants. The order was topped<br />

off by a ten-year service contract for the equipment of the French<br />

producer.<br />

Our hydraulic stud tensioning machines for the opening and closing of reactor<br />

pressure vessels have been used throughout the world for almost 40 years. Next to<br />

stud tensioning machines, which have a high degree of automation, our many<br />

years of experience are also used for the development of customer-specifi c<br />

solutions. In this area, we score with concept development and design engineering,<br />

production and delivery including the start-up at the plant and, if desired, ongoing<br />

support in the scope of service orders. Equipment and special tools complementing<br />

the use of stud tensioning machines have an increasing demand.<br />