quality monitoring during production independent of the manufacturer<br />

engineering assistance in operating nuclear power plants as well as for<br />

upgrading and retrofi tting projects<br />

planning and implementation of nuclear dismantling measures<br />

development and testing of remote-controlled disassembling systems, handling<br />

devices, tool carriers and manipulators for use underwater as well as out of the<br />

water<br />

calculations<br />

production<br />

inspection and monitoring services<br />

Another completed project in <strong>2009</strong> involved the conditioning of<br />

120 m³ of fi lter concentrates for the nuclear power plant Gundremmingen.<br />

50 MOSAIK ® containers were fi lled and conditioned<br />

via the MAVAK facility from two collection tanks with a volume<br />

of 60 m³ each. After the conditioning was completed, the MOSAIK ®<br />

containers were transported to the interim storage facility of the<br />

GRB Sammelstelle Bayern GmbH for radioactive materials in<br />

Mitterteich. The conditioning of the fi lter concentrates took place<br />

according to the schedule approved by BFS.<br />

In <strong>2009</strong> we also completed the order for the supply of system<br />

technology and handling tools for a state-of-the-art interim<br />

storage facility for nuclear waste in Taiwan. Casks with cemented<br />

radioactive waste from the nuclear power plant Lungmen will<br />

henceforth be loaded with our crane systems onto palettes. From<br />

Our components and plants are developed with state-of-the-art planning tools<br />

under the aspects of safety, reliability, and ease of operation.<br />

here our driverless palette vehicles will transport the palettes to<br />

their storage position. The control technology for this plant, the<br />

warehouse management software as well as the equipment for<br />

monitoring and interventions are also made by <strong>Siempelkamp</strong>. The<br />

advantages for the customer include the effi cient and fl exible<br />

storage management and minimized exposure to radiation. This<br />

order represents an important reference for our activities on the<br />

Asian market.<br />

A quality seal for our competence: As the representative for 141<br />

sub-contractors and selected from approximately 8,800 Areva<br />

suppliers, <strong>Siempelkamp</strong> accepted in <strong>2009</strong> the award ‘Top AREVA<br />

Supplier’. This award demonstrates that <strong>Siempelkamp</strong> has adjusted<br />

strategically to market requirements and has become an internationally<br />

accepted supplier of components around the reactor.<br />

Drying station of the MAVAK facility System and handling technology for nuclear power plant<br />

Lungmen in Taiwan