Our services include:<br />

design and concept development<br />

project management<br />

inspection and monitoring services<br />

installation and start-up<br />

nuclear engineering and design for plants and special purpose machines<br />

The concrete treatment unit for the dismantling of the multipurpose<br />

research reactor in Karlsruhe was another milestone in<br />

<strong>2009</strong>. This reactor is one of a few nuclear facilities which are<br />

being dismantled on the premises of the former research center<br />

Karlsruhe, now called KIT (Karlsruhe Institute for Technology).<br />

With the concrete treatment unit, radioactive concrete is automatically<br />

crushed, homogenized and, now contaminate-free,<br />

packed in containers which are suitable for interim storage.<br />

The project including the planning, manufacture, delivery and<br />

installation of the equipment for the treatment and packing of<br />

contaminated concrete waste started in March <strong>2009</strong>. In late <strong>2009</strong><br />

the trial operation was successfully completed with the acceptance<br />

test by a surveyor and inspecting authority. Our customer was so<br />

satisfi ed that we also received the order for the installation of<br />

the concrete treatment unit in the reactor building!<br />

<strong>Siempelkamp</strong> Nuclear technology<br />

Filling g of concrete treatment unit during g test operation p<br />

From the nuclear power plant Krümmel we received in February<br />

<strong>2009</strong> the order for a decontamination shop in the controlled zone<br />

including the planning, manufacture, delivery and installation of<br />

the equipment. The scope of supply includes the dismantling of<br />

existing plant components, a decontamination box with access<br />

area and particle preparation for dry-blasting, a high-pressure<br />

water decontamination box with access area and mechanical<br />

waste water treatment and a wet storage for ultrasonic cleaning<br />

equipment including a cleaning area for small parts.<br />

Engineering solutions<br />

View of decontamination shop for the nuclear power plant Krümmel<br />