Worldwide largest installed base<br />
Our departments specialize in the upgrading of existing plants. We service all<br />
<strong>Siempelkamp</strong> plants as well as old Metso and Bison-made plants. Therefore, we<br />
service the largest installed base of machinery and plants for the wood-based<br />
materials industry.<br />
Service <strong>2009</strong>: higher capacity – less downtime<br />
In <strong>2009</strong> our service teams carried out nine large modifi cation<br />
projects which were accepted by the customers in the same year.<br />
For our Ukrainian customer JSC Weidmann Malyn Paper Mill we<br />
increased the productivity of an 11-daylight transformer board<br />
plant built in 1986. Our measures concentrated on the press area<br />
and the loader and unloader unit. Twelve new 3,530 x 6,510 x<br />
100 mm hot platens with drainage channels allow water and<br />
steam to drain away from the product during the press process.<br />
The new hot platens result in shorter press cycles. Furthermore,<br />
we provided completely new loader and unloader units. Both<br />
Malyn Paper<br />
<strong>Siempelkamp</strong> Machinery and plants<br />
Retrofi tting of ContiRoll ® plants<br />
were equipped with state-of-the-art drive technology which<br />
required the conversion from a hydraulic to an electrical drive<br />
system. We also replaced a number of worn parts in the press<br />
area. Beyond the productivity increase, with the help of detailed<br />
installation planning and good coordination with the customer<br />
and its installation company, the downtime could be reduced to<br />
a minimum!<br />