15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This Register records all cases of disconnection of Supply<br />

860<br />

due to meter showing NIL consumption on account of non-occupation of<br />

premises. This Register is checked on the same lines as in the case of Disconnection<br />

Book for non-payment.<br />

8.7.26 Checking of Outstanding Debit Slips and Disconnected Consumers<br />

Ledger Register:<br />

Consumers whose supply is disconnected for non-payment are required to pay<br />

the arrears within a month failing which meter removal advices are sent by the<br />

Consumers Department to the Distribution and Commercial Department for removing<br />

the meters. As soon as a meter is removed and an advice to this effect is received from<br />

the Distribution and Commercial Department, outstanding slips are prepared for<br />

amounts shown as arrears in the ledgers. The Consumers Department then creates<br />

outstandings within a month of the receipt of meter removal advice.<br />

Outdoor staff of the Consumers Department makes efforts within a<br />

period of 15 days from the date of creation of outstanding for recovery<br />

of the outstanding amount and return the papers to the Recovery<br />

Clerk.<br />

The recovery staff, thereafter, pursues recovery by an official letter<br />

followed by a Final Notice. In all the cases, not settled within a period<br />

of 3 months from the date of creation of Outstanding, and involving<br />

amount, a Pleader’s notice is sent to consumer. Cases involving major<br />

amount are put before the Committee for sanction to file suits in Court,<br />

as required under Section 517(1)(h) of the M.M.C. Act.<br />

The Outstanding Debit Slips are verified with the ‘Dishonoured<br />

Consumers Ledgers’ Register. While verifying, it is ensured that there<br />

is no delay in disconnection of the Supply or delay in creation of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!