15.05.2013 Views

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

Administration Manual - B.E.S.T. Undertaking.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

799<br />

(i) Rs.81/- per hour subject to a minimum of Rs.162/- for operating<br />

one equipment upto 2 hours.<br />

(ii) Rs.81/- extra for operating each additional equipment.<br />

(iii) If more than two items of equipment are hired, two operators will<br />

be necessary and the second operator will also have to be paid<br />

additionally at the same rates as stipulated in (I & ii) above.<br />

(iv) The operators (two persons) who attend to the air-conditioning<br />

plant will also be paid directly by the party using the hall at the<br />

rate of Rs.137/- per hour subject to a minimum of Rs.274/- on<br />

working days.<br />

(v) Welfare staff:-<br />

Rs.67/- per hour subject to a minimum of Rs.134/- on week<br />

days.<br />

D) CHARGES FOR SATURDAY, SUNDAY AND<br />

HOLIDAYS:<br />

(i) Rs.121/- per hour subject to a minimum of Rs.242/- for<br />

operating one equipment upto 2 hours.<br />

(ii) Rs.121/- extra for operating each additional equipment.<br />

(iii) If more than two items of equipment are hired, two operators will<br />

be necessary and the second operator will also have to be paid<br />

additionally at the same rates as stipulated in (i & ii) above.<br />

(iv) The operators (two persons) who attend to the air-conditioning<br />

plant will also be paid directly by the party using the hall at the<br />

rate of Rs.205/- per hour subject to a minimum of Rs.410/- on<br />

working days.<br />

(v) Welfare staff:-<br />

Rs.100/- per hour subject to a minimum of Rs.200/- on week<br />

days.<br />

6.8.9.6 MRE – OB Memo:<br />

These memos are initiated by the Meter and Relays Department for<br />

charges to be billed in respect of testing and calibrating meters<br />

belonging to outside parties. Labour rates are taken on actuals with<br />

150% overheads.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!