22) Security Pass recovery, if pass is not returned or penalty, if pass is returned late;<br />

23) Retention money in case of water proofing job and pest control job, to be retained<br />

upto Guarantee period.<br />

2.20 RUNNING ACCOUNT OF “ AD HOC” PAYMENT BILLS:<br />

During the progress of work, payments are made intermittently to the Contractors against bills<br />

prepared as running account bills or ‘ad-hoc’ bills. Therefore, when releasing the final bill, the Spot<br />

Auditor and his staff must exercise due care that –<br />

(i) released materials from site of work are lifted from site by the Contractor, if he has<br />

offered rebate; otherwise the material is duly credited back to Stores;<br />

(ii) penalties have been recovered for exceeding the time limit or penalties have been<br />

condoned for valid reasons;<br />

(iii) in the event of non-completion of the work in full or in part as the case may be, by<br />

the Contractor, when tenders are invited at the risk and cost of the defaulting<br />

contractor to carry out the said balance work, it is ensured to effect proper<br />

recoveries and penal action is taken against defaulting contractor with the approval<br />

of competent authority.<br />

2.21 FREQUENCY OF MEASUREMENT CHECKS:<br />

The Spot Auditor and his staff are required to ensure that all measurements<br />

are checked on the spot during progress of work and when this is not possible or feasible, the<br />

measurements are checked in the measurement book on the basis of drawings.<br />

2.22 EXTRA ITEMS:<br />

At times, in the execution of work, items not included in the original<br />

tender are necessitated and such departures are sanctioned by the<br />

competent authority [Asst.General Manager (Civil)]. When such works are<br />

not at all covered in the awarded contract, they are termed “extra items”.<br />

Before the proposal is forwarded to the Asst. General Manager (Civil) for<br />

his approval, the same is routed through the Asst. General Manager