569<br />

payment of the amount specified therein, the following aspects are carefully scrutinized by<br />

the Spot Auditor and his staff who ensure that-<br />

1) rates and tender quantities are correct and have not been exceeded;<br />

2) previous quantity and amount are correctly recorded in the<br />

certificate voucher;<br />

3) new quantities from measurement sheets to certificate voucher are<br />

correctly extended;<br />

4) excess quantities are within the permissible limits or are covered by<br />

adequate sanctions;<br />

5) all the terms and conditions stated in the acceptance letter have<br />

been strictly adhered to and that the contract is in accordance<br />

thereto. It is to be ensured that SD & PD is paid within stipulated<br />

time, if not, it is to be ensured that interest @ 18% is recovered from<br />

the Contractor;<br />

6) the security deposit has been paid and the receipt number and the<br />

amount paid has been indicated;<br />

7) the measurements and calculations have been verified and checked<br />

in the measurements sheets and that the material at Site Account<br />

Books – recoveries and payments have been correctly reflected in<br />

the certificate voucher;<br />

8) released materials have been properly accounted for and recoveries<br />

therefore included;<br />

9) overtime payment in respect of the works in progress made to our<br />

staff by the <strong>Undertaking</strong> has been included for recovery;<br />

10) the contractor has purchased the general conditions of contract as is required of him;<br />

11) the final amount of contract is well within the amount of the contract reported to the<br />

Committee and has not been exceeded beyond the permissible limit;<br />

12) Since cement and steel are procured by the contractor himself, Spot Audit checks<br />

the Test Report. These recoveries of cement and steel are not made from bills.<br />

13) the contract has been completed within the time limit prescribed and that where<br />

such period has been exceeded whether recoveries have been included for penalty or<br />

whether sanction of the competent authority has been obtained condoning such<br />

lapse;<br />

14) the progress certificate is proper and complete in all respects;<br />

15) rebates due, if any, are deducted from amount due to the contractor;<br />

16) the certificate voucher has been certified by the ASST.GENERAL MANAGER<br />

(CIVIL) in case of civil works as well as electrification work;<br />

17) when water is supplied by the <strong>Undertaking</strong>, recovery of 1.5% by way of<br />

18) extra Water charges is included as per prevailing rules; and<br />

19) discount offered for payment within a specified period is earned and deducted from<br />

the amount payable.<br />

20) Electricity if supplied by the <strong>Undertaking</strong> and ESI recovery as advised by ESI<br />

Section is included for recovery.<br />

21) The Payment of price variation for steel is verified on the basis of relevant R.B.I.<br />

Index;