arrived at from the measured lorries, 20% quantity is deducted to arrive at the net quantity payable for<br />

earth filling.<br />

When the payment is on the basis of lorry measurements system, the Chief Security &<br />

Vigilance Officer is informed in advance by the ASST.GENERAL MANAGER (CIVIL), so that he<br />

can post Security Guard to record the number of lorries emptied on the plot every day. Surprise<br />

checks are carried out by the Spot Audit to ascertain the number of lorry arrivals in a fixed period and<br />

the corresponding departures of lorries from time to time within a stipulated period and are<br />

accordingly recorded.<br />

The lorries bringing earth to the site and leaving the site are required to use entrances and exits<br />

approved for this purpose by the Junior Engineer in charge of the work.<br />

Records of Lorry arrivals and departures are to be maintained in the approved proforma.<br />

2.6.3 In Plinth:<br />

The filling-in Plinth is measured in cubic contents from the original ground level upto the<br />

decided plinth level at places in the building under construction.<br />

2.7 EXCAVATIONS: